38-24 32 STREET
QUEENS · BIN 4004601
💬 Discuss this project
1931Year Built
2Stories
G1Building Class
M1-3/R7XZoning
10,000 sfGross Floor Area
1Units
30 Open Violations 29 unresolved · 1 paperwork only ▸
All parking garages · Owner of record: 32ND STREET REALTY ASSOCIATES LLC · 6,840 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof5p · 1 filing · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Floor 104p · 1 filing · 20 docs
Floor 93p · 1 filing · 20 docs
Floor 81p · 1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 24p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARKSITE CONSTRUCTION2909/10/2026
NEW AMERICAN CONSTRUCTION INC604/09/2026
LONG ISLAND CITY DEVELOPE103/22/2026
32ND STREET REALTY ASSOCI103/22/2026
PARK CONSTRUCTION203/21/2026
LONG ISLAND CITY DEVEL GROUP4403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/03/2024$6.6M—LONG ISLAND CITY DEVELOPERS GROUP LLC → 32ND STREET REALTY ASSOCIATES LLC$661/sf building
10/05/2015$6.0M—COFANE ASSOCIATES, LLC → LONG ISLAND CITY DEVELOPERS GROUP LLC$600/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J CALIENDO ARCHITECT1003/21/2026
SNR EXPEDITING DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNO EQUIPMENT AND DEVELOPGeneral Contractor407/08/2026
KE JU CONTRACTING CORPGeneral Contractor109/10/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor104/09/2026
PARKSITE CONSTRUCTION CORGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STROH ENGINEERING SERVICE3316111/07/2024
Building Lifecycle
All (81)Filed (16)Permit Issued (6)Signed Off (2)Violation (33)Objection (11)Special Inspection (13)
09/09/2026
Permit issued — Construction Fence
Q01116859-I1-FN
06/17/2026
Objection raised — Other
06/11/2026
Filed — Alteration
Herewith filed for an 8 ft plywood construction fence
Q01414528-I1
06/04/2026
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S9
06/02/2026
Special inspection requirement — Standpipe Systems
04/23/2026
Objection resolved — Resolved
04/17/2026
Objection raised — Admin
04/16/2026
Objection resolved — Open
04/16/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
03/26/2026
Objection raised — Other
03/20/2026
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S8
03/03/2026
Objection raised — Admin
03/02/2026
Objection raised — Admin
02/26/2026
Objection raised — Zoning
02/24/2026
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S5
02/18/2026
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S7
02/17/2026
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S6
02/13/2026
Special inspection requirement — Footing and Foundation
SAMER ABOU-GHAIDA
02/13/2026
Special inspection requirement — Final
SAMER ABOU-GHAIDA
02/11/2026
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S3
12/30/2025
Permit issued — Construction Fence
Q01116859-I1-FN
11/21/2025
Signed off — Full Demolition
Demolish 2 story Commercial Building.
Q01116709-I1
11/17/2025
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S2
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2025
Special inspection requirement — Demolition
PETER STROH
10/22/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
PETER STROH
10/16/2025
Special inspection requirement — Footing and Foundation
SAMER ABOU-GHAIDA
10/16/2025
Special inspection requirement — Final
SAMER ABOU-GHAIDA
10/16/2025
Special inspection requirement — Final
SAMER ABOU-GHAIDA
10/12/2025
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S1
10/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/11/2025
Special inspection requirement — Post-installed Anchors
09/29/2025
Filed — Full Demolition
Demolish 2 story Commercial Building.
Q01116709-P1
09/23/2025
Special inspection requirement — Demolition
PETER STROH
08/28/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01218057-I1
08/28/2025
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-S4
07/03/2025
Permit issued — Full Demolition
Q01116709-I1-FD
06/20/2025
Special inspection requirement — Standpipe Systems
06/20/2025
Special inspection requirement — Sprinkler Systems
06/17/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01218057-P1
06/04/2025
Objection raised — Other
05/21/2025
Filed — New Building
FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01228856-I1.
Q01228656-I1
05/01/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01218057-I1
05/01/2025
Permit issued — Sidewalk Shed
Q01218057-I1-SH
04/03/2025
Permit issued — Full Demolition
Q01116709-I1-FD
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/21/2025
Permit issued — Construction Fence
Q01116859-I1-FN
12/02/2024
Filed — Alteration
Q01116859-I1
11/24/2024
Violation issued (ECB, closed)
Construction
11/07/2024
Filed — Full Demolition
Demolish 2 story Commercial Building.
Q01116709-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedKE JU CONTRACTING CORP09/09/2026
DOB NOWConstruction FencePermit IssuedPARKSITE CONSTRUCTION COR12/30/2025
DOB NOWFull DemolitionSigned-offDNO EQUIPMENT AND DEVELOP07/03/2025
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION05/01/2025
DOB NOWFull DemolitionSigned-offDNO EQUIPMENT AND DEVELOP04/03/2025
DOB NOWConstruction FencePermit IssuedDNO EQUIPMENT AND DEVELOP01/21/2025
DOB NOWFull DemolitionSigned-offDNO EQUIPMENT AND DEVELOP—
BISPLISSUEDDUMONT PLBG & HTG CORP09/21/2017
BISOTISSUEDALL AMERICAN BUILDING & DEVELOP06/19/2017
BISPLISSUEDTHE PLBG & HTG SPECIALIST04/11/2017
BISOTISSUEDALL AMERICAN BUILDING & DEVELOP04/07/2017
1 project · most recent 06/04/2026
Sprinkler System
FiledStatusContractorScope
06/04/2026——Sprinkler System
1 project · most recent 06/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/04/2026——Gas, Storm, Water/Sanitary
2 projects · most recent 05/01/2025
General Wiring
FiledStatusContractorScope
05/01/2025CompleteRICHARD NEU—
03/23/2020Permit IssuedL J ELEC'L SERV. INC.General Wiring
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026——4 scope_items
1 project · most recent 06/11/2026
Fence
FiledStatusContractorScope
06/11/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/02/2026Standpipe Systems—special
02/13/2026Footing and FoundationSAMER ABOU-GHAIDAprogress
02/13/2026FinalSAMER ABOU-GHAIDAprogress
10/22/2025DemolitionPETER STROHspecial
10/22/2025Structural Stability – Alterations of existing BuildingsPETER STROHspecial
10/16/2025Footing and FoundationSAMER ABOU-GHAIDAprogress
10/16/2025FinalSAMER ABOU-GHAIDAprogress
10/16/2025FinalSAMER ABOU-GHAIDAprogress
10/11/2025Fire-Resistant Penetrations and Joints—special
10/11/2025Post-installed Anchors—special
09/23/2025DemolitionPETER STROHspecial
06/20/2025Standpipe Systems—special
06/20/2025Sprinkler Systems—special
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/21/2026Q01116859-I1Request digital key ↗
08/20/2026Q01218057-I1Request digital key ↗
08/20/2026Q01218057-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION29
09/18/2025440825047Open ↗
10/21/2022421524256Open ↗
03/18/2021421524256Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION5
10/16/2017440383835Open ↗
04/11/2017440383835Open ↗
04/07/2017440383835Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/18/2025440825047Open ↗
02/12/2018440457122Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 12
08/16/2026Q01228656-S9Open ↗
08/16/2026Q01228656-S6Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/29/2019421524256Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/29/2019421524256Open ↗
▸BISZONING RESOLUTION DETERMINATION1
12/19/2017421524256Open ↗
▸BISZONING DIAGRAM1
03/29/2019421524256Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/29/2019421524256Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01228656-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 21
08/16/2026Q01228656-S9Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/21/2026Q01116859-I1Open ↗
08/20/2026Q01218057-P1Open ↗
08/20/2026Q01218057-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/18/2025440825047Open ↗
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
02/24/2017440383835Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
02/24/2017440383835Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q01116709-I1Open ↗
08/28/2026Q01116709-I1Open ↗
08/22/2026Q01116709-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
09/18/2025440825047Open ↗
01/24/2018440457122Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/18/2017421524256Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/05/2019440539552Open ↗
01/02/2018440383835Open ↗
11/28/2017440383835Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
04/05/2019440539552Open ↗
11/01/2018421524256Open ↗
02/24/2017440383835Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/14/2019440539696Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/03/2019440539552Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01116709-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q01116709-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01116709-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01116709-I1Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST3
09/18/2025440825047Open ↗
11/21/2018440457122Open ↗
07/18/2017421524256Open ↗
▸BISSTREET TREES SITE PLAN2
09/18/2018421524256Open ↗
01/24/2018440457122Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/18/2018421524256Open ↗
01/24/2018440457122Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/18/2017421524256Open ↗
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01228656-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026Q01228656-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWOER: Notice to Proceed7
08/16/2026Q01228656-S2Open ↗
08/16/2026Q01228656-S8Open ↗
08/16/2026Q01228656-S7Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
11/09/2018421524256Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
09/18/2018421524256Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026Q01116709-P1Open ↗
08/18/2026Q01116709-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
11/29/2017440383835Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01116709-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/09/2018421524256Open ↗
03/17/2017440383835Open ↗
02/24/2017440383835Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/14/2019440539696Open ↗
02/24/2017440383835Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/18/2017421524256Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
09/18/2018421524256Open ↗
Showing 3 of 10 on file for this type
▸BISDEP Hydrant Flow Test Letter1
05/03/2019440539552Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/18/2018421524256Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE7
03/21/2019421524256Open ↗
11/01/2018421524256Open ↗
04/04/2018421524256Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/18/2025440825047Open ↗
10/16/2017440383835Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
03/22/2019421524256Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/18/2017421524256Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/30/2019440539552Open ↗
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION19
05/30/2019440539552Open ↗
05/03/2019440539552Open ↗
04/01/2019440457122Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET7
11/21/2018421692163Open ↗
10/23/2018421524256Open ↗
07/19/2018421524256Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/18/2025440825047Open ↗
05/14/2019440539696Open ↗
04/05/2019440539552Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
12/26/2017440383835Open ↗
11/28/2017440383835Open ↗
▸Other Documents11
▸BISPLOT DIAGRAM3
12/19/2017421524256Open ↗
12/19/2017421524256Open ↗
07/18/2017421524256Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026Q01116709-I1Open ↗
08/18/2026Q01116709-P1Open ↗
08/16/2026Q01228656-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026Q01116709-P1Open ↗
08/13/2026Q01116709-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
04/01/2019440457122Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01116709-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01116709-I1Open ↗