← Back
Limited service hotel, often national chain
38-30 28 STREET
QUEENS · BIN 4436770
💬 Discuss this project
1957Year Built
8Stories
H3Building Class
M1-2/R5BZoning
15,613 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Limited service hotel, often national chain · Owner of record: 38-30 28TH STREET LL · 2,451 sf lot · 6.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 1 filing · 16 docs
Floor 1Under Construction5p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
38-30 28TH STREET1706/28/2026
38-30 28TH STREET LL303/22/2026
KAFKA CONSTRUCTION1303/22/2026
38-30 28 ST LLC103/22/2026
KAFKA CONST INC103/22/2026
38-30 28 ST LL103/22/2026
KAFRA CONST INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FABIAN CRUZ PE PLLC203/27/2025
NDKAZALAS ARCHITECTURE P.C.103/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NDKAZALAS ARCHITECTURE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAPAS CONSTRUCTION CORPFire Protection107/08/2026
DEMEF CONSTRUCTION CORPGeneral Contractor106/28/2026
ZAPAS CONSTRUCTION, CORPGeneral Contractor104/09/2026
ZAPAS CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495303/27/2025
Building Lifecycle
All (66)Filed (3)Permit Issued (4)Violation (43)Inspection (7)Objection (4)Special Inspection (5)
08/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/03/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
05/22/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
05/08/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_NOV, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
11/18/2025
Permit issued — Mechanical Systems
Q01133372-S3-MS
11/18/2025
Permit issued — Plumbing
Q01133372-S2-PL
11/14/2025
Permit issued — General Construction
Q01133372-I1-GC
11/12/2025
Permit issued — Plumbing
Q01133372-S2-EW-SP
05/22/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
04/22/2025
Violation issued (FDNY_ORDER, closed)
04/10/2025
Objection raised — Scope
04/10/2025
Objection raised — Scope
03/27/2025
Filed — Alteration CO
INSTALLATION OF BATHROOM EXHAUST IN CONJUNCTION WITH Q01133372-I1.
Q01133372-S3
03/27/2025
Filed — Alteration CO
INSTALLATION OF BATHROOM EXHAUST IN CONJUNCTION WITH Q01133372-I1.
Q01133372-S2
03/26/2025
Special inspection requirement — Mechanical Systems
Rajasekhar Sakhamuri
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
03/26/2025
Special inspection requirement — Heating Systems
Rajasekhar Sakhamuri
03/26/2025
Special inspection requirement — Final
Rajasekhar Sakhamuri
03/26/2025
Special inspection requirement — Sprinkler Systems
Rajasekhar Sakhamuri
03/25/2025
Filed — Alteration CO
INSTALLATION OF BATHROOM EXHAUST IN CONJUNCTION WITH Q01133372-I1.
Q01133372-I1
12/12/2024
Violation issued (ECB, closed)
Construction
08/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/01/2024
Violation issued (FDNY_NOV, closed)
03/27/2014
Violation issued (ECB, closed)
Elevators
03/09/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2010
Violation issued (ECB, closed)
Unknown
09/22/2010
Violation issued (ECB, closed)
Unknown
09/22/2010
Violation issued (ECB, closed)
Unknown
09/22/2010
Violation issued (ECB, closed)
Unknown
09/22/2010
Violation issued (ECB, closed)
Unknown
09/22/2010
Violation issued (ECB, closed)
Unknown
07/06/2010
Violation issued (ECB, closed)
Unknown
07/06/2010
Violation issued (ECB, closed)
Unknown
07/06/2010
Violation issued (ECB, closed)
Unknown
07/06/2010
Violation issued (ECB, closed)
Unknown
07/02/2010
Violation issued (ECB, closed)
Construction
06/09/2010
Violation issued (ECB, closed)
Unknown
05/21/2010
Violation issued (ECB, closed)
Construction
03/23/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2010
Violation issued (ECB, closed)
Construction
02/06/2010
Violation issued (ECB, closed)
Construction
01/26/2010
Violation issued (ECB, closed)
Construction
01/26/2010
Violation issued (ECB, closed)
Construction
01/26/2010
Violation issued (ECB, closed)
Construction
12/08/2009
Violation issued (ECB, closed)
Construction
12/08/2009
Violation issued (ECB, closed)
Unknown
10/22/2009
Violation issued (ECB, closed)
Unknown
10/22/2009
Violation issued (ECB, closed)
Unknown
10/22/2009
Violation issued (ECB, closed)
Unknown
10/22/2009
Violation issued (ECB, closed)
Construction
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offZAPAS CONSTRUCTION, CORP11/18/2025
DOB NOWPlumbingSigned-offZAPAS CONSTRUCTION CORP11/18/2025
DOB NOWGeneral ConstructionPermit IssuedDEMEF CONSTRUCTION11/14/2025
DOB NOWPlumbingPermit IssuedZAPAS CONSTRUCTION CORP11/12/2025
BISFSISSUEDMICHAEL S. KAPLAN02/13/2020
BIS—ISSUEDKAFKA CONSTRUCTION INC06/06/2019
BISPLISSUEDPACIFIC PLBG&HTG CORP05/23/2019
BISSDISSUEDPACIFIC PLBG. & HTG. CORP05/23/2019
BISEQISSUEDKAFKA CONSTRUCTION INC05/09/2019
BISMHISSUEDKAFKA CONSTRUCTION INC05/09/2019
BISFSISSUEDRANSHAW PLBG & HTG LLC02/07/2019
BISPLISSUEDPACIFIC PLBG&HTG CORP05/16/2018
BISSDISSUEDPACIFIC PLBG. & HTG. CORP05/16/2018
BISMHISSUEDKAFKA CONSTRUCTION INC05/15/2018
BIS—ISSUEDKAFKA CONSTRUCTION INC04/23/2018
BISEQISSUEDKAFKA CONSTRUCTION INC04/23/2018
BISSDISSUEDARIANA CONTRACTING INC05/30/2017
BISEQISSUEDKAFKA CONSTRUCTION INC04/13/2017
BIS—ISSUEDKAFKA CONSTRUCTION INC04/13/2017
BIS—ISSUEDKAFKA CONSTRUCTION INC03/20/2017
BISPLISSUEDHYDROTAC SERVICES LLC02/10/2017
BISSDISSUEDARIANA CONTRACTING INC05/18/2016
BISEQISSUEDKAFKA CONSTRUCTION INC03/15/2016
BIS—ISSUEDKAFKA CONSTRUCTION INC02/23/2016
BISPLISSUEDHYDROTAC SERVICES LLC10/14/2015
BIS—ISSUEDKAFKA CONSTRUCTION INC03/11/2015
BISOTISSUEDKAFKA CONSTRUCTION INC03/09/2015
BISSDISSUEDHYDROTAC SERVICES LLC09/30/2014
BISPLISSUEDHYDROTAC SERVICES LLC09/30/2014
BISOTISSUEDKAFKA CONSTRUCTION INC02/13/2014
BIS—ISSUEDKAFKA CONSTRUCTION INC02/13/2014
BISPLISSUEDPYROSVESTIC MECH CORP01/02/2014
BISSDISSUEDPYROSVESTIC MECH CORP03/06/2013
BIS—ISSUEDKAFKA CONSTRUCTION INC02/15/2013
BISOTISSUEDKAFKA CONSTRUCTION INC02/15/2013
BISEQISSUEDKAFKA CONSTRUCTION INC02/15/2013
BISPLISSUEDPYROSVESTIC MECH CORP11/27/2012
BIS—ISSUEDKAFKA CONSTRUCTION INC05/02/2012
BISOTISSUEDKAFKA CONSTRUCTION INC04/30/2012
BISEQISSUEDKAFKA CONSTRUCTION INC03/21/2012
+ 14 more permits on file
1 project · most recent 03/27/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2025Signed-offZAPAS CONSTRUCTION, CORPVentilation Systems
Ventilation
Greenheck CSP-B110 86 CFM · Exhaust Fan ×1
1 project · most recent 03/27/2025
Sprinkler System
FiledStatusContractorScope
03/27/2025Permit IssuedZAPAS CONSTRUCTION CORPSprinkler System
1 project · most recent 03/27/2025
Water/Sanitary
FiledStatusContractorScope
03/27/2025Signed-offZAPAS CONSTRUCTION CORPWater/Sanitary
2 projects · most recent 12/01/2025
General Wiring
FiledStatusContractorScope
12/01/2025Permit IssuedAE ELECTRIC INCGeneral Wiring
02/19/2018CompleteAPOLLO ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/03/2026Fail-Final PL - UndergroundFailView ↗
05/22/2026Fail-Final PL - UndergroundFailView ↗
05/08/2026Fail-Final PL - UndergroundFailView ↗
08/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/26/2025Mechanical SystemsRajasekhar Sakhamurispecial
03/26/2025Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
03/26/2025Heating SystemsRajasekhar Sakhamurispecial
03/26/2025FinalRajasekhar Sakhamuriprogress
03/26/2025Sprinkler SystemsRajasekhar Sakhamurispecial
▾Documents — 245 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01133372-S2Request digital key ↗
08/20/2026Q01133372-I1Request digital key ↗
08/20/2026Q01133372-S3Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION34
07/20/2020402232534Open ↗
07/13/2020402232534Open ↗
05/19/2020421400326Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION27
02/14/2020421621515Open ↗
06/07/2019402232534Open ↗
05/13/2019421621515Open ↗
Showing 3 of 27 on file for this type
▸BISIntent to Revoke Approval/Permit1
02/12/2014402232534Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/10/2020410025814Open ↗
▸BISRescission of Intent to Revoke Approval/Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/26/2018402232534Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/02/2021410025814Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/02/2012420364233Open ↗
▸DOB NOWCPC Hotel Special Permit1
08/13/2026Q01133372-I1Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/08/2021402232534Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
03/10/2020402232534Open ↗
▸BISVERIFY TAX LOT1
05/19/2021402232534Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/19/2021402232534Open ↗
▸Seals & Professional Certifications39
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
04/27/2020421621515Open ↗
04/27/2020421621515Open ↗
03/14/2020420124984Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q01133372-S2Open ↗
08/29/2026Q01133372-S3Open ↗
08/29/2026Q01133372-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01133372-I1Open ↗
08/20/2026Q01133372-S3Open ↗
08/20/2026Q01133372-S2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/15/2016440295976Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/15/2016440295976Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/15/2016440295976Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026Q01133372-S3Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
01/18/2019420124984Open ↗
01/16/2019420124984Open ↗
01/15/2019420124984Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
01/25/2021421400326Open ↗
12/04/2019402232534Open ↗
11/18/2019402232534Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL3
03/24/2020402232534Open ↗
03/24/2020402232534Open ↗
02/12/2020402232534Open ↗
▸BISSCHEDULE B - PLUMBING2
08/18/2012402232534Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/12/2018421621515Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01133372-I1Open ↗
▸Environmental & Asbestos9
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
05/02/2012420550282Open ↗
06/07/2011420364233Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01133372-I1Open ↗
08/20/2026Q01133372-S2Open ↗
08/20/2026Q01133372-S3Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/15/2018421621515Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/20/2020421621515Open ↗
02/13/2020421621515Open ↗
02/13/2020421621515Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/20/2020421621515Open ↗
02/13/2020421621515Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/30/2012420550282Open ↗
▸Inspections & Test Reports2
▸BISBPP: FIELD INSPECTION1
02/02/2021410025814Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/15/2016440295976Open ↗
▸Approvals, Objections & Sign-offs46
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
02/12/2021421400326Open ↗
12/15/2020402232534Open ↗
05/19/2020402232534Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
05/19/2020402232534Open ↗
05/19/2020402232534Open ↗
05/19/2020402232534Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
07/20/2020402232534Open ↗
07/13/2020402232534Open ↗
03/09/2020402232534Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/30/2012420550282Open ↗
Showing 1 of 4 on file for this type
▸BISSUPERSEDING LETTER4
05/31/2018420124984Open ↗
05/31/2018402232534Open ↗
05/31/2018402232534Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
02/15/2021410025814Open ↗
02/02/2021410025814Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT11
02/12/2021421400326Open ↗
03/14/2020420124984Open ↗
02/20/2020421621515Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
02/18/2014420550282Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
02/02/2021410025814Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/18/2015420550282Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/30/2019402232534Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/19/2021402232534Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION11
11/05/2020410025814Open ↗
10/20/2020410025814Open ↗
05/18/2020402232534Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
04/12/2018421621515Open ↗
03/01/2017421400326Open ↗
07/21/2016421349240Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
05/19/2020402232534Open ↗
05/19/2020421400326Open ↗
04/27/2020421621515Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/15/2016440295976Open ↗
▸Other Documents5
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
02/02/2021410025814Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/18/2019402232534Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/15/2021410025814Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/02/2021410025814Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/27/2016420124984Open ↗