← Back
Two stories - detached, small or mid-size
38-30 CLEARVIEW EXPRESSWAY
QUEENS · BIN 4137007
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2AZoning
2,571 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof1p · 1 filing · 11 docs
Floor 232p · 1 filing · 20 docs
Floor 131p · 1 filing · 20 docs
Cellar34p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW HENGDA CONSTRUCTION303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC606/19/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506406/19/2024
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/04/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/16/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/12/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
07/10/2024Maintenance informationXIAOHONG ZHAOenergy_progress
07/10/2024MasonryXIAOHONG ZHAOspecial
07/10/2024Chimneys and ventsXIAOHONG ZHAOspecial
07/10/2024Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
07/10/2024Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
07/10/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
07/10/2024Structural Stability – Alterations of existing buildingsXIAOHONG ZHAOspecial
07/10/2024Subgrade InspectionsXIAOHONG ZHAOspecial
07/10/2024Mechanical SystemsXIAOHONG ZHAOspecial
07/10/2024Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
07/10/2024Structural Steel - WeldingXIAOHONG ZHAOspecial
07/10/2024Structural Steel - DetailsXIAOHONG ZHAOspecial
07/10/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
07/10/2024Heating SystemsXIAOHONG ZHAOspecial
07/10/2024FinalXIAOHONG ZHAOprogress
07/10/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
07/10/2024Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
07/10/2024Structural Wood FrameXIAOHONG ZHAOprogress
07/10/2024Footing and FoundationXIAOHONG ZHAOprogress
07/10/2024Lighting controlsXIAOHONG ZHAOenergy_progress
07/10/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
07/10/2024Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
07/10/2024Permanent certificateXIAOHONG ZHAOenergy_progress
07/10/2024Interior lighting powerXIAOHONG ZHAOenergy_progress
07/10/2024Fenestration areasXIAOHONG ZHAOenergy_progress
Latest 25 of 86.
Nothing on file for this building.