DOB11/17/2023UNPERMITED ALTERATION WORK HAS POTENTIALY COMPROMISED FLOOR FRAMING & EGRESS. REMEDIAL WORK PERFORMED DOES NOT CONFORM WITH APPROVED PLANS POTENTIAL HAZARDS REMAIN. REMEDY: RETAIN RDP2PREPAR REVISD STABLZN PLAN.DON'T WRK CONTRARY TO SWO OR CSE APPROVAL.WRK UNDR PERMIT.SUBMT BY 12/1, END BY 12/31/23
DOB05/30/2023DOB VIOLATION ISSUED #033123CE10801JT, FAILURE TO COMPLY - UNPERMITTED INTERIOR RENOVATN WRK.FLOOR FRAMNG REMOVED CAUSING COMPROMISED EGRESS STAIRS.HAZARD TO THE PUBLIC.FULL STOP WORK ORDER&FULL VACATE REMEDY:RETAIN NYS LIC PE 2DEVELOP STABILZTN PLANS,RESTORE EGRESS,START WRK BY 7/1/23 TO SAFEGUARD&STABILZ,OBTAIN LPC APPROVALS
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB03/31/2023V-DOB VIOLATION - ACTIVE
DOB03/07/2023AT TIME OF INSPECTION OBSERVED INTERIOR FLOORS, STAIRWELL AND PARTITION WALLS ARE SEVERELY DAMAGED AND SECTION MISSING WITH PILED DEBRIS THROUGHOUT. ENTIRE INTERIOR STRUCTURAL STABILITY COMPROMISED.
DOB09/22/2021V-DOB VIOLATION - ACTIVE
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB03/18/1994V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
ECB05/11/2026NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE-TO-MAINTAIN VIOLATION #39080929P ISSUED 3/7/2023 FOR COMPROMISED INTERIOR STRUCTURE, STAIRWELL, PARTITION WALLS, MISSING SECTIONS, AND DEBRIS PILES WARRAHearing held — result not yet published
ECB05/11/2026NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39080945P ISSUED 3/7/2023 FOR DEMOLITION OF INTERIOR FLOORS, STAIRWELLS, AND PARTITION WAHearing held — result not yet published
ECB07/25/2023FAILURE TO COMPLY - UNPERMITTED INTERIOR RENOVATION WORK OBSERVED. AT THE TIME OF INSPECTION, FLOOR FRAMING HAS BEEN REMOVED AND THE EGRESS STAIRS HAVE BEEN COMPROMISED. DUE TO THE UNPERMITTED WORK, DOB VIO#359Nothing owed — awaiting certificate of correction
ECB03/07/2023AT TIME OF INSPECTION OBSERVED INTERIOR FLOORS, STAIRWELL AND PARTITION WALLS ARE SEVERELY DAMAGED AND SECTION MISSING WITH PILED DEBRIS THROUGHOUT. ENTIRE INTERIOR STRUCTURAL STABILITY COMPROMISED. A FULL VACANothing owed — awaiting certificate of correction
ECB03/07/2023AT TIME OF INSPECTION OBSERVED DEMOLITION DONE ON INTERIOR FLOORS, STAIRWELL AND PARTITION WALLS THROUGHOUT AND MISSING SECTION WITH HOLES. ALSO OBSERVED SECTION OF NEW WOOD JOISTS ERECTED STAIRWELL AREA AND PINothing owed — awaiting certificate of correction
ECB07/12/2005WORK WITHOUT A PERMIT.WORK NOTED:AT BASEMENT LEVEL TOTAL GUT REHAB OF BASE LEVEL WITH PARTITIONS ERECTED TO CHANGE LAYOUT:ALSO NOTE GAS,WATER & ELECTRIC SERVICE MOVED.REMEDY:STOP ALL WORK EXCEPT TO MAKE SAFENothing owed — awaiting certificate of correction