← Back
One family attached or semi-detached
38 EXETER STREET
BROOKLYN · BIN 3245932
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R3-1Zoning
1,342 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 3,600 sf lot · 0.37 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar7p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/30/2024$1.4M—Private party → Private party$1,006/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOUGLAS KOCHER, RA511/13/2025
AME SERVICES INC101/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AME SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & K CREATIVE CONSTRUCT*General Contractor407/08/2026
SIGNORE & SONS PLBG CORPPlumbing207/08/2026
Building Lifecycle
All (49)Filed (6)Permit Issued (6)Signed Off (3)Violation (1)Inspection (3)Special Inspection (30)
05/19/2026
Signed off — Alteration
Renovation of Existing J-3 Residential Dwelling. No change in use, occupancy ,or means of egress. New Installation and Modification of Gas and Water and Sanitary
B01049339-I1
05/19/2026
Signed off — Alteration
Renovation of Existing J-3 Residential Dwelling. No change in use, occupancy ,or means of egress. New Installation and Modification of Gas and Water and Sanitary
B01049339-S1
03/15/2026
Signed off — Alteration
B01170347-I1
01/02/2026
Permit issued — General Construction
B01049339-I1-GC
11/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Douglas Kocher
11/26/2025
Special inspection requirement — Fenestration areas
Douglas Kocher
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
11/26/2025
Special inspection requirement — Interior lighting power
Douglas Kocher
11/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Douglas Kocher
11/26/2025
Special inspection requirement — Fenestration air leakage
Douglas Kocher
11/26/2025
Special inspection requirement — Maintenance information
Douglas Kocher
11/26/2025
Special inspection requirement — Ventilation and air distribution system
Douglas Kocher
11/26/2025
Special inspection requirement — Metering
Douglas Kocher
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANZ SEBORGA
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
11/26/2025
Special inspection requirement — Air barrier - visual inspection
Douglas Kocher
11/26/2025
Special inspection requirement — Insulation placement and R values
Douglas Kocher
11/26/2025
Special inspection requirement — Final
Douglas Kocher
11/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
11/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
11/17/2025
Special inspection requirement — Maintenance information
FRANZ SEBORGA
11/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANZ SEBORGA
11/13/2025
Filed — Alteration
Renovation of Existing J-3 Residential Dwelling. No change in use, occupancy ,or means of egress. New Installation and Modification of Gas and Water and Sanitary
B01049339-P6
11/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Douglas Kocher
11/13/2025
Special inspection requirement — Interior lighting power
Douglas Kocher
11/13/2025
Special inspection requirement — Ventilation and air distribution system
Douglas Kocher
11/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANZ SEBORGA
11/13/2025
Special inspection requirement — Insulation placement and R values
Douglas Kocher
11/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Douglas Kocher
11/13/2025
Special inspection requirement — Metering
Douglas Kocher
11/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
11/13/2025
Special inspection requirement — Fenestration air leakage
Douglas Kocher
11/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
11/13/2025
Special inspection requirement — Maintenance information
Douglas Kocher
11/06/2025
Filed — Alteration
Renovation of Existing J-3 Residential Dwelling. No change in use, occupancy ,or means of egress. New Installation and Modification of Gas and Water and Sanitary
B01049339-P3
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/27/2025
Permit issued — Plumbing
B01049339-S1-PL
06/11/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2025
Filed — Alteration
Renovation of Existing J-3 Residential Dwelling. No change in use, occupancy ,or means of egress. New Installation and Modification of Gas and Water and Sanitary
B01049339-P1
01/30/2025
Permit issued — Plumbing
B01049339-S1-PL
01/24/2025
Permit issued — Construction Fence
B01170347-I1-FN
01/23/2025
Filed — Alteration
B01170347-I1
01/21/2025
Permit issued — General Construction
B01049339-I1-GC
01/16/2025
Permit issued — General Construction
B01049339-I1-GC
09/19/2024
Filed — Alteration
Renovation of Existing J-3 Residential Dwelling. No change in use, occupancy ,or means of egress. New Installation and Modification of Gas and Water and Sanitary
B01049339-I1
09/19/2024
Filed — Alteration
Renovation of Existing J-3 Residential Dwelling. No change in use, occupancy ,or means of egress. New Installation and Modification of Gas and Water and Sanitary
B01049339-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offA & K CREATIVE CONSTRUCT*01/02/2026
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP08/27/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP01/30/2025
DOB NOWConstruction FenceSigned-offA & K CREATIVE CONSTRUCT*01/24/2025
DOB NOWGeneral ConstructionSigned-offA & K CREATIVE CONSTRUCT*01/21/2025
DOB NOWGeneral ConstructionSigned-offA & K CREATIVE CONSTRUCT*01/16/2025
1 project · most recent 11/13/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/13/2025Signed-offSIGNORE & SONS PLBG CORPGas, Water/Sanitary
2 projects · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026CompleteLENS ELECTRIC, INC1 meters, 1 new_meters
03/25/2024CompleteHI VOLTAGE ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
11/26/2025Energy Code Compliance InspectionsDouglas Kocherprogress
11/26/2025Fenestration areasDouglas Kocherenergy_progress
11/26/2025HVAC-R and service water piping design and insulationFRANZ SEBORGAenergy_progress
11/26/2025Interior lighting powerDouglas Kocherenergy_progress
11/26/2025Fenestration and door U-factor and product ratingsDouglas Kocherenergy_progress
11/26/2025Fenestration air leakageDouglas Kocherenergy_progress
11/26/2025Maintenance informationDouglas Kocherenergy_progress
11/26/2025Ventilation and air distribution systemDouglas Kocherenergy_progress
11/26/2025MeteringDouglas Kocherenergy_progress
11/26/2025HVAC-R and service water heating system controlsFRANZ SEBORGAenergy_progress
11/26/2025HVAC-R and service water heating equipmentFRANZ SEBORGAenergy_progress
11/26/2025Air barrier - visual inspectionDouglas Kocherenergy_progress
11/26/2025Insulation placement and R valuesDouglas Kocherenergy_progress
11/26/2025FinalDouglas Kocherprogress
11/17/2025HVAC-R and service water piping design and insulationFRANZ SEBORGAenergy_progress
11/17/2025Energy Code Compliance InspectionsFRANZ SEBORGAprogress
11/17/2025HVAC-R and service water heating equipmentFRANZ SEBORGAenergy_progress
11/17/2025Maintenance informationFRANZ SEBORGAenergy_progress
11/17/2025HVAC-R and service water heating system controlsFRANZ SEBORGAenergy_progress
11/13/2025Energy Code Compliance InspectionsDouglas Kocherprogress
11/13/2025Interior lighting powerDouglas Kocherenergy_progress
11/13/2025Ventilation and air distribution systemDouglas Kocherenergy_progress
11/13/2025HVAC-R and service water heating system controlsFRANZ SEBORGAenergy_progress
11/13/2025Insulation placement and R valuesDouglas Kocherenergy_progress
11/13/2025Fenestration and door U-factor and product ratingsDouglas Kocherenergy_progress
Latest 25 of 38.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026B01170347-I1Request digital key ↗
08/19/2026B01049339-S1Request digital key ↗
08/19/2026B01049339-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature34
09/01/2026B01049339-S1Open ↗
09/01/2026B01049339-S1Open ↗
09/01/2026B01049339-S1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026B01170347-I1Open ↗
08/19/2026B01049339-I1Open ↗
08/19/2026B01049339-S1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026B01049339-I1Open ↗
08/19/2026B01049339-S1Open ↗
08/19/2026B01049339-P1Open ↗
Showing 3 of 5 on file for this type