← Back
BuildNYC
Two stories - detached, small or mid-size
38 FIEDLER AVENUE
STATEN ISLAND · BIN 5014695
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
1,236 sfGross Floor Area
1Units
Rent Stabilized0 Active Violations
Two stories - detached, small or mid-size · 2,430 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarPlumbing waste line installation2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Allen Shinfeld, P.E108/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Project Entry103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Crown PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Allen Shinfeld, P.E1305108/30/2022
Building Lifecycle
12/27/2022
Signed off — Alteration
Relocate boiler, HWH and gas meter as per plan. no change of use, egress or occupancy under this application.
S07994756-I1
12/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/06/2022
Permit issued — Plumbing
S07994756-I1-PL
24 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCrown Plumbing09/06/2022
BISOTISSUEDAmergy Solar12/08/2022
BISPLISSUEDS & L Plumbing03/01/2018
BISOTISSUEDKTC Design Group10/20/2017
1 project · most recent 12/09/2022
FiledStatusContractorScope
12/09/2022CompleteI.P. Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
40 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account