← Back
Elevator cooperative
38 GRAMERCY PARK NORTH
MANHATTAN · BIN 1017956
💬 Discuss this project
1930Year Built
5Stories
D4Building Class
R9AZoning
21,339 sfGross Floor Area
38Units
Rent Stabilized0 Open Violations
Elevator cooperative · Owner of record: GRAMERCY 252 OWNER LLC · 5,135 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction72p · 6 filings · 20 docs
Bulkhead3p · 2 filings · 19 docs
Floor 22Under Construction2p · 2 filings · 20 docs
Floor 21Under Construction2p · 2 filings · 20 docs
Floor 20Under Construction21p · 2 filings · 20 docs
Floor 19Under Construction22p · 2 filings · 20 docs
Floor 18Under Construction47p · 2 filings · 20 docs
Floor 17Under Construction43p · 2 filings · 20 docs
Floor 16Under Construction42p · 2 filings · 20 docs
Floor 15Under Construction47p · 2 filings · 20 docs
Floor 14Under Construction43p · 2 filings · 20 docs
Floor 13Under Construction43p · 2 filings · 20 docs
Floor 12Under Construction49p · 2 filings · 20 docs
Floor 11Under Construction99p · 2 filings · 20 docs
Floor 10Under Construction98p · 2 filings · 20 docs
Floor 9Under Construction100p · 2 filings · 20 docs
Floor 8Under Construction101p · 1 filing · 20 docs
Floor 7Under Construction100p · 1 filing · 20 docs
Floor 6Under Construction100p · 1 filing · 20 docs
Floor 5Under Construction104p · 3 filings · 20 docs
Floor 4Under Construction100p · 3 filings · 20 docs
Floor 3Under Construction102p · 3 filings · 20 docs
Floor 2Under Construction102p · 3 filings · 20 docs
Floor 1Under Construction113p · 3 filings · 20 docs
CellarUnder Construction71p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEGION INVESTMENT GROUP6009/21/2026
MONCON INC609/13/2026
SKYLINE SCAFFOLDING GROUP707/08/2026
38 GRAMERCY PARK2004/09/2026
PLATINUM SERVICES NY504/09/2026
VILES CONTRACTING203/22/2026
38 GRAMERCY PARK INC ANDR103/22/2026
JOVIL CONTRACTING203/22/2026
RJS ELECTRICAL CONTRACTING CORP.103/22/2026
C O A MICHAEL TYLER REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING1503/21/2026
NORTHEAST SERVICE INTERIORS203/21/2026
RIZZO GROUP203/21/2026
JAM CONSULTANTS, INC.203/21/2026
Rigid Structural Design, LLC1003/21/2026
A1 EXPEDITING SERVICE203/21/2026
OUTHERE SPACE103/21/2026
EXPEDITE DEM203/21/2026
ZEN CONSTRUCTION CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITANIUM CONSTRUCTION SERGeneral Contractor807/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor708/16/2026
INTERSYSTEM INSTALLATIONGeneral Contractor604/09/2026
MONCON INCGeneral Contractor508/04/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor407/08/2026
KG SPRINKLER CORPFire Protection307/08/2026
Z.W. PLBG & HTG CORPPlumbing207/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor204/09/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor207/08/2026
SNG BRICK AND STONE INCGeneral Contractor208/26/2026
DONATO PLUMBING GROUP INCPlumbing207/08/2026
POLER CONTRACTING INCGeneral Contractor104/09/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
JEPOL CONSTRUCTION INCGeneral Contractor104/09/2026
DA SILVA, JAMESElectrical103/21/2026
MAGUIRE, SHAWNElectrical103/21/2026
MANZUR FLORES, JORGEElectrical103/21/2026
MICHAEL MINIEROElectrical103/21/2026
QUINTANA, DAVIDElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
RJS ELECTRICAL CONTNG CORElectrical103/22/2026
VICTOR, ALLANElectrical103/21/2026
WEISS, NORMANElectrical103/21/2026
CHETRAM, RISHIRAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIBERT ENGINEERING, PC223107/17/2026
DOMANI INSPECTION SERVICE8431707/14/2026
SESI CONSULTING ENGINEERS414606/05/2026
SHAHRISH SHUVO ENGINEERIN8524103/19/2025
HENSON ARCHITECTURE, PLLC973203/28/2022
AK CONSULTING SERVICES, I6198210/09/2020
MUNYC ARCHITECTURE PLLC5224111/08/2019
Building Lifecycle
All (274)Filed (55)Permit Issued (48)Signed Off (13)Violation (35)Inspection (18)Objection (75)Special Inspection (30)
08/21/2026
Objection resolved — Resolved
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Metering
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Final
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/14/2026
Permit issued — Sidewalk Shed
M01332516-S1-SH
08/13/2026
Objection resolved — Resolved
08/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2026
Objection raised — Other
08/03/2026
Filed — New Building
Underpinning as per plans
M00951038-Z3
08/03/2026
Permit issued — Protection and Mechanical Methods
M00951038-Z3-PMM
08/03/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
08/03/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
07/30/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/28/2026
Permit issued — Suspended Scaffold
M01429231-I1-SC
07/27/2026
Objection raised — Other
07/27/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2026
Objection raised — Other
07/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY EASY SCALE PLATFORM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01429231-I1
07/15/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
M01332516-P2
07/14/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
M01332516-P3
07/14/2026
Filed — New Building
Underpinning as per plans
M00951038-P5
07/14/2026
Objection resolved — Resolved
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Open
07/13/2026
Permit issued — Supported Scaffold
M01377420-I1-SF
07/10/2026
Objection raised — Other
07/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01377420-I1
07/06/2026
Filed — New Building
Underpinning as per plans
M00951038-A5
07/06/2026
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
07/06/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/26/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
M01332516-P1
06/26/2026
Objection resolved — Addressed
06/25/2026
Objection raised — Other
06/24/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
06/24/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/23/2026
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
06/18/2026
Permit issued — Protection and Mechanical Methods
M01332516-S4-PMM
06/18/2026
Permit issued — Protection and Mechanical Methods
M01332516-S3-PMM
06/18/2026
Permit issued — Protection and Mechanical Methods
M01332516-S6-PMM
06/18/2026
Permit issued — Protection and Mechanical Methods
M01332516-S5-PMM
06/17/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
M01332516-S4
Latest 60 of 274 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP08/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONCON INC08/03/2026
DOB NOWSuspended ScaffoldPermit IssuedSNG BRICK AND STONE INC07/28/2026
DOB NOWSupported ScaffoldPermit IssuedSNG BRICK AND STONE INC07/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP06/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP06/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP06/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP06/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONCON INC06/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONCON INC06/16/2026
DOB NOWSprinklersPermit IssuedKG SPRINKLER CORP06/01/2026
DOB NOWSprinklersPermit IssuedKG SPRINKLER CORP06/01/2026
DOB NOWStandpipePermit IssuedKG SPRINKLER CORP05/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONCON INC05/27/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP05/20/2026
DOB NOWMechanical SystemsPermit IssuedTITANIUM CONSTRUCTION SER05/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP05/18/2026
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC05/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONCON INC05/15/2026
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER04/13/2026
DOB NOWStructuralPermit IssuedTITANIUM CONSTRUCTION SER04/13/2026
DOB NOWSupport of ExcavationPermit IssuedTITANIUM CONSTRUCTION SER04/07/2026
DOB NOWFoundationPermit IssuedTITANIUM CONSTRUCTION SER02/09/2026
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC01/25/2026
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP12/15/2025
DOB NOWSupport of ExcavationPermit IssuedTITANIUM CONSTRUCTION SER12/12/2025
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER11/17/2025
DOB NOWFull DemolitionSigned-offNORTHEAST SPECIALIST GROUP09/02/2025
DOB NOWFull DemolitionSigned-offNORTHEAST SPECIALIST GROUP08/04/2025
DOB NOWConstruction FenceSigned-offNORTHEAST SPECIALIST GROUP07/30/2025
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP07/22/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP07/16/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC06/06/2025
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC06/06/2025
DOB NOWCurb CutSigned-offTITANIUM CONSTRUCTION SER06/03/2025
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP02/20/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/28/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/27/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/20/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION07/19/2022
+ 42 more permits on file
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Permit IssuedMONCON INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Aermec NYG0500XG 29 tons · Chiller ×36
Samsung AM048TXDCH/AA 48,000 BTU · Vrf Outdoor ×2
AM048TXMDCH/AA 48,000 BTU · Vrf Outdoor ×2
Ventilation
Aaon V3-ERB-89-0-26FC-12L:F34E-0EK-000-000-F000A0A-00-DBG0E0D00 6,540 CFM · Rooftop Unit ×8
1 project · most recent 08/03/2026
Sprinkler System
FiledStatusContractorScope
08/03/2026Permit IssuedKG SPRINKLER CORPSprinkler System
1 project · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Permit IssuedDONATO PLUMBING GROUP INCGas, Storm, Water/Sanitary
11 projects · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026Permit IssuedANTHONY G FERRY INC—
12/17/2025Permit IssuedDELCO ELECTRICAL CORP.General Wiring
12/17/2025Permit IssuedDELCO ELECTRICAL CORP.General Wiring
12/16/2025Permit IssuedDELCO ELECTRICAL CORP.—
12/16/2025Permit IssuedDELCO ELECTRICAL CORP.—
12/16/2025Permit IssuedDELCO ELECTRICAL CORP.—
06/09/2025Permit IssuedRICHARD NEU—
10/25/2022Permit IssuedSAFETECH ELECL CONTNG CORGeneral Wiring
10/02/2021CompleteSTEVEN FARKAS—
08/03/2021CompleteDONALD MCGEACHY, INC.General Wiring
09/12/2020CompleteRJS ELECTRICAL CONTNG CORGeneral Wiring
1 project · most recent 08/03/2026
Steel Concrete
FiledStatusContractorScope
08/03/2026Permit IssuedMONCON INCSteel, Concrete
3 projects · most recent 07/15/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
07/15/2026Permit IssuedROCKLEDGE SCAFFOLD CORPFence, Sidewalk Shed
07/09/2026Permit IssuedSNG BRICK AND STONE INCScaffold
06/05/2025Permit IssuedPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
1 project · most recent 07/17/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/17/2026Permit IssuedSNG BRICK AND STONE INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/03/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/30/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/16/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/26/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/29/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
07/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 134
DateRequirementInspectorRole
08/18/2026Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
08/18/2026Lighting controlsJOHN MCMONAGLEenergy_progress
08/18/2026MeteringJOHN MCMONAGLEenergy_progress
08/18/2026Shutoff dampersJOHN MCMONAGLEenergy_progress
08/18/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
08/18/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
08/18/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
08/18/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
08/18/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/18/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/18/2026FinalJOHN MCMONAGLEprogress
08/18/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
08/18/2026Emergency and Standby Power Systems (Generator)JOHN MCMONAGLEspecial
08/18/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/18/2026Mechanical SystemsJOHN MCMONAGLEspecial
08/18/2026Maintenance informationJOHN MCMONAGLEenergy_progress
08/18/2026Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
07/06/2026Standpipe SystemsJOHN MCMONAGLEspecial
07/06/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/06/2026Sprinkler SystemsJOHN MCMONAGLEspecial
06/23/2026Standpipe SystemsJOHN MCMONAGLEspecial
06/10/2026Standpipe SystemsJOHN MCMONAGLEspecial
06/01/2026Sprinkler SystemsJOHN MCMONAGLEspecial
06/01/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/01/2026Standpipe SystemsJOHN MCMONAGLEspecial
Latest 25 of 134.
▾Documents — 441 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch56
09/03/2026M00602294-I1Request digital key ↗
09/03/2026M00602292-I1Request digital key ↗
09/03/2026M00584670-I1Request digital key ↗
Showing 3 of 56 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00235344-I1Request digital key ↗
09/05/2026M00303572-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸Applications & Permits43
▸BISWORK PERMIT APPLICATION21
03/11/2020123842084Open ↗
12/09/2019123491239Open ↗
02/01/2016122464886Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
07/17/2024141025682Open ↗
08/06/2022120216621Open ↗
02/20/2020123842084Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWHPD - Permit Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications203
▸DOB NOWProgress Inspector Seal & Signature67
09/20/2026M00951038-P5Open ↗
09/20/2026M00951038-P5Open ↗
09/20/2026M00951038-P5Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature58
09/28/2026M00951038-S9Open ↗
09/28/2026M00951038-S9Open ↗
09/28/2026M00951038-S9Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature54
09/05/2026M00235344-I1Open ↗
09/05/2026M00303572-I1Open ↗
09/03/2026M00602294-I1Open ↗
Showing 3 of 54 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
03/10/2020123842084Open ↗
02/20/2020123842084Open ↗
10/25/2019123491239Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/03/2008110154877Open ↗
04/30/2008110151442Open ↗
▸BISPC FULL REPORT1
02/05/2008110078692Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/17/2024141025682Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/17/2024141025682Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/03/2008110154877Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/11/2016122464886Open ↗
11/03/2014122119260Open ↗
06/11/2014122030131Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
03/11/2015122119260Open ↗
01/22/2015122119260Open ↗
08/04/2010120216621Open ↗
▸BISSCHEDULE B - PLUMBING2
08/14/2010120409487Open ↗
12/11/2009120216621Open ↗
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWElectric Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTenant Protection Plan and Notes2
02/20/2020123842084Open ↗
10/25/2019123491239Open ↗
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
12/11/2009120216621Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/17/2024141025682Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00235344-I1Open ↗
09/05/2026M00303572-I1Open ↗
09/03/2026M00584670-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
07/13/2010120409487Open ↗
12/11/2009120216621Open ↗
05/03/2008110154877Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/20/2020123842084Open ↗
10/25/2019123491239Open ↗
11/03/2014122119260Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/05/2008110078692Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/20/2016122464886Open ↗
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/20/2020123842084Open ↗
10/25/2019123491239Open ↗
06/08/2017122464886Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/03/2021123491239Open ↗
10/05/2020123842084Open ↗
06/08/2017122464886Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/03/2021123491239Open ↗
10/05/2020123842084Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/03/2021123491239Open ↗
10/05/2020123842084Open ↗
10/05/2020123842084Open ↗
▸DOB NOWSOIL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs16
▸BISADMINISTRATIVE OBJECTIONS7
07/13/2010120409487Open ↗
12/11/2009120216621Open ↗
05/03/2008110154877Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/03/2021123491239Open ↗
10/05/2020123842084Open ↗
06/08/2017122464886Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/17/2024141025682Open ↗
▸BISCCD1-Construction Code Determination1
10/26/2010120216621Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/11/2009120216621Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
09/03/2021123491239Open ↗
10/05/2020123842084Open ↗
02/20/2020123842084Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET8
02/20/2020123842084Open ↗
10/25/2019123491239Open ↗
01/11/2016122464886Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION1
10/20/2010120216621Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/17/2024141025682Open ↗
▸Other Documents26
▸DOB NOWDHCR Document8
08/27/2026M01032122-I1Open ↗
08/16/2026M00951038-S1Open ↗
Showing 2 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/20/2010120216621Open ↗
10/20/2010120216621Open ↗
05/13/2010110154877Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026M01052677-I1Open ↗
08/16/2026M00951038-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSite Survey: Initial2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/06/2022120216621Open ↗
▸BISDHCR DOCUMENT1
07/17/2024141025682Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFull Demo: 10-Day Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type