38 MOUNTVIEW AVENUE
STATEN ISLAND · Westerleigh-Castleton Corners · BIN 5175743
💬 Discuss this project
2022Year Built
2Stories
A5Building Class
R3-1Zoning
1,160 sfGross Floor Area
1Units
One family attached or semi-detached · 2,170 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Attic5p · 1 filing · 9 docs
Floor 222p · 2 filings · 20 docs
Floor 122p · 3 filings · 20 docs
Cellar6p · 1 filing · 9 docs
Basement15p · 1 filing · 20 docs
Site & exterior5p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
34 MOUNTAINVIEW1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS602/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C P DESIGN CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAE DEVELOPMENT CORPGeneral Contractor307/08/2026
M. EARLY PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324502/06/2023
A TECH ENGINEERING NYC, P6738201/27/2023
Building Lifecycle
All (44)Filed (6)Permit Issued (3)Signed Off (2)Inspection (5)Special Inspection (28)
03/08/2023
Signed off — Alteration
application filed to install plumbing / gas fired fixtures and sprinklers in conjunction with new building application # S00743071-I1
S00743091-I1
03/08/2023
Signed off — Alteration
S00743100-I1
03/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/07/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/06/2023
Filed — New Building
application filed to construct a basement and two (2) story frame ( 3 story total building ) - one (1) family - semi-attached home with two (2) on-site parking spaces
S00743071-P2
02/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
02/02/2023
Special inspection requirement — Maintenance information
Richard Dailey
02/02/2023
Special inspection requirement — Shutoff dampers
Richard Dailey
02/02/2023
Special inspection requirement — Lighting in dwelling units
Richard Dailey
02/02/2023
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
02/02/2023
Special inspection requirement — Heating Systems
Richard Dailey
02/02/2023
Special inspection requirement — Mechanical Systems
Richard Dailey
02/02/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
02/02/2023
Special inspection requirement — Subgrade Inspections
Richard Dailey
02/02/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
02/02/2023
Special inspection requirement — Final
Richard Dailey
02/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
Richard Dailey
02/02/2023
Special inspection requirement — Footing and Foundation
Richard Dailey
02/02/2023
Special inspection requirement — Structural Wood Frame
Richard Dailey
02/02/2023
Special inspection requirement — Insulation placement and R values
Richard Dailey
02/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
Richard Dailey
02/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
Richard Dailey
02/02/2023
Special inspection requirement — Fenestration areas
Richard Dailey
02/02/2023
Special inspection requirement — Permanent certificate
Richard Dailey
02/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
02/02/2023
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
02/02/2023
Special inspection requirement — Air barrier — testing
Richard Dailey
02/02/2023
Special inspection requirement — Fenestration air leakage
Richard Dailey
01/27/2023
Filed — Alteration
application filed to install plumbing / gas fired fixtures and sprinklers in conjunction with new building application # S00743071-I1
S00743091-P1
01/27/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
01/27/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
01/27/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
01/03/2023
Filed — New Building
application filed to construct a basement and two (2) story frame ( 3 story total building ) - one (1) family - semi-attached home with two (2) on-site parking spaces
S00743071-P1
12/05/2022
Permit issued — Curb Cut
S00743100-I1-CC
11/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/07/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/19/2022
Permit issued — Mechanical Systems
S00743071-I1-GC-CX
07/21/2022
Permit issued — Plumbing
S00743091-I1-PL
07/07/2022
Filed — New Building
application filed to construct a basement and two (2) story frame ( 3 story total building ) - one (1) family - semi-attached home with two (2) on-site parking spaces
S00743071-I1
07/05/2022
Filed — Alteration
application filed to install plumbing / gas fired fixtures and sprinklers in conjunction with new building application # S00743071-I1
S00743091-I1
06/02/2022
Filed — Alteration
S00743100-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDAE DEVELOPMENT CORP12/05/2022
DOB NOWMechanical SystemsPermit IssuedDAE DEVELOPMENT CORP08/19/2022
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP07/21/2022
1 project · most recent 02/06/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/06/2023Permit IssuedDAE DEVELOPMENT CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Rheem GSX130481BH / Rheem RCF4821STAMCA 58,000 BTU · Condensing Unit ×1
Heating
Rheem Model No. R802TA100521MSA 64,000 BTU · Condensing Unit ×1
Ventilation
Broan ERV 130 B130E65RT 115 CFM · Erv ×1
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×1
1 project · most recent 09/23/2022
General Wiring
FiledStatusContractorScope
09/23/2022CompleteMANGI ELECTRICAL CORPGeneral Wiring
1 project · most recent 02/06/2023
Wood
FiledStatusContractorScope
02/06/2023Permit IssuedDAE DEVELOPMENT CORPWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
02/02/2023HVAC-R and service water piping design and insulationRichard Daileyenergy_progress
02/02/2023Maintenance informationRichard Daileyenergy_progress
02/02/2023Shutoff dampersRichard Daileyenergy_progress
02/02/2023Lighting in dwelling unitsRichard Daileyenergy_progress
02/02/2023Concrete - Cast-In-PlaceRichard Daileyspecial
02/02/2023Fire-Resistant Penetrations and JointsRichard Daileyspecial
02/02/2023Heating SystemsRichard Daileyspecial
02/02/2023Mechanical SystemsRichard Daileyspecial
02/02/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
02/02/2023Subgrade InspectionsRichard Daileyspecial
02/02/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/02/2023Energy Code Compliance InspectionsRichard Daileyprogress
02/02/2023FinalRichard Daileyprogress
02/02/2023Fire-Resistance Rated ConstructionRichard Daileyprogress
02/02/2023Footing and FoundationRichard Daileyprogress
02/02/2023Structural Wood FrameRichard Daileyprogress
02/02/2023Insulation placement and R valuesRichard Daileyenergy_progress
02/02/2023HVAC-R and service water heating equipmentRichard Daileyenergy_progress
02/02/2023HVAC-R and service water heating system controlsRichard Daileyenergy_progress
02/02/2023Fenestration areasRichard Daileyenergy_progress
02/02/2023Permanent certificateRichard Daileyenergy_progress
02/02/2023Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
02/02/2023Air barrier - visual inspectionRichard Daileyenergy_progress
02/02/2023Air barrier — testing Richard Daileyenergy_progress
02/02/2023Fenestration air leakageRichard Daileyenergy_progress
Latest 25 of 28.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00743100-I1Request digital key ↗
08/23/2026S00743091-P1Request digital key ↗
08/23/2026S00743091-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026S00743071-P1Open ↗
08/23/2026S00743071-I1Open ↗
08/13/2026S00743071-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026S00743071-I1Open ↗
08/23/2026S00743071-P1Open ↗
08/13/2026S00743071-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00743071-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026S00743091-I1Open ↗
08/23/2026S00743071-I1Open ↗
08/23/2026S00743071-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026S00743091-P1Open ↗
08/31/2026S00743091-P1Open ↗
08/31/2026S00743071-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026S00743071-P2Open ↗
08/31/2026S00743071-P2Open ↗
08/31/2026S00743071-P2Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026S00743071-P1Open ↗
08/23/2026S00743071-I1Open ↗
08/13/2026S00743071-P2Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/23/2026S00743071-P1Open ↗
08/23/2026S00743071-I1Open ↗
08/13/2026S00743071-P2Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00743071-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00743071-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00743071-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00743071-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT5
08/23/2026S00743091-I1Open ↗
08/23/2026S00743071-P1Open ↗
08/23/2026S00743071-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00743071-I1Open ↗
08/13/2026S00743091-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00743071-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/23/2026S00743071-P1Open ↗
08/23/2026S00743071-I1Open ↗
08/13/2026S00743071-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026S00743071-I1Open ↗
08/23/2026S00743071-P1Open ↗
08/13/2026S00743071-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026S00743071-I1Open ↗
08/23/2026S00743071-P1Open ↗
08/13/2026S00743071-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00743071-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00743071-I1Open ↗