← Back
Multi-story retail building (2+)
38 WESTCHESTER SQUARE
BRONX · BIN 2041871
💬 Discuss this project
1937Year Built
2Stories
K2Building Class
R6Zoning
4,858 sfGross Floor Area
4Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: MARCJACK LLC · 2,429 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof2p · 2 filings · 14 docs
Floor 27p · 2 filings · 20 docs
Floor 19p · 3 filings · 20 docs
Mezzanine7p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACHS MANAGMENT3407/08/2026
ADDAN REALTY ASSOC C O ACHS MGMT203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2022$5.9M—38 WESTCHESTER SQUARE LLC → MARCJACK LLC$1,218/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MURDOCH ENGINEERING405/09/2022
MJ ENGINEERING & DESIGN803/24/2022
FRENCH & PARRELLO ASSOCIATES502/22/2022
GENSLER109/22/2021
ASHRAF CORP107/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROJECT EXPEDITERS1203/21/2026
KAZAM CONSULTANTS803/21/2026
SOTIR ASSOCIATES303/21/2026
KD DESIGNS103/21/2026
4444 PPPP CORP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHIMENTI CONSTRUCTION COGeneral Contractor607/08/2026
MJM ASSOCIATES CONSTR LLCGeneral Contractor407/08/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
NATIONAL MAINTENANCEScaffold307/08/2026
NATIONAL MAINTENANCE INCGeneral Contractor107/08/2026
F.S. SITE CORPFire Protection107/08/2026
F.S. SITE CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN5546803/24/2022
JOSEPH MARTINES PE, PLLC1428602/22/2022
Building Lifecycle
All (106)Filed (19)Permit Issued (14)Signed Off (13)Violation (9)Inspection (13)Objection (8)Special Inspection (30)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/16/2022
Signed off — Alteration
Erect illuminated accessory business wall sign; copy reading "Bank of America with Logo"
X00724823-I1
05/10/2022
Permit issued — Sign
X00724823-I1-SG
05/09/2022
Filed — Alteration
Erect illuminated accessory business wall sign; copy reading "Bank of America with Logo"
X00724823-I1
04/13/2022
Signed off — Alteration
X00534996-I1
04/13/2022
Signed off — Alteration
ERECT ALUMINUM EXTERIOR FACADE PANEL ABOVE STOREFRONT OPENING
X00534985-I1
04/13/2022
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "LOGO"
X00535001-I1
04/08/2022
Special inspection requirement — Post-installed Anchors
Magdy Youssef
04/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
04/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Magdy Youssef
04/06/2022
Objection resolved — Addressed
03/28/2022
Objection raised — Other
03/24/2022
Filed — Alteration CO
FILING FOR A NEW CO TO CHANGE THE FACADE, EXIT, AND LIVE LOADS ON FLOORS
X00570743-P1
03/24/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
03/24/2022
Special inspection requirement — Post-installed Anchors
Magdy Youssef
03/24/2022
Special inspection requirement — Energy Code Compliance Inspections
Magdy Youssef
03/17/2022
Signed off — Alteration
New mechanical work for tenant fit out for Bank of America.
X00570462-I1
03/16/2022
Signed off — Alteration
Energy filing for Bank of America tenant fit out
X00591867-I1
03/15/2022
Signed off — Alteration
New plumbing work for Bank of America tenant fit out
X00570544-I1
03/11/2022
Signed off — Alteration
Tenant fit out for Bank of America
X00570399-I1
03/10/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/07/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00562217-I1
03/07/2022
Signed off — Alteration
Structural work for Bank of America tenant fit out. Work includes structural support for proposed ATMs.
X00570466-I1
02/22/2022
Signed off — Alteration
Replace existing defective primary 1 1/2 inch RPZ device as primary. Install new 1 1/2 inch double check valve assembly as secondary device for existing SP system water piping. Install fast response valve.
X00579284-I1
02/22/2022
Filed — Alteration
Energy filing for Bank of America tenant fit out
X00591867-P1
02/17/2022
Special inspection requirement — Final
JOSEPH MARTINES
02/17/2022
Special inspection requirement — Interior lighting power
JOSEPH MARTINES
02/17/2022
Special inspection requirement — Lighting controls
JOSEPH MARTINES
02/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH MARTINES
02/17/2022
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH MARTINES
02/17/2022
Special inspection requirement — Maintenance information
JOSEPH MARTINES
02/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
02/15/2022
Filed — Alteration
Replace existing defective primary 1 1/2 inch RPZ device as primary. Install new 1 1/2 inch double check valve assembly as secondary device for existing SP system water piping. Install fast response valve.
X00579284-P2
02/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
02/11/2022
Signed off — Alteration
PROVIDE NEW AUTOMATIC SPRINKLER SYSTEM, ASSOCIATED SPRINKLER PIPING AND SPRINKLER HEADS ASSHOWN ON PLANS. PROVIDE BOOSTER PUMP TO SUPPLY FIRE WATER TO SPRINKLERS AT THE CELLER LEVEL
X00559376-I1
02/11/2022
Filed — Alteration
Replace existing defective primary 1 1/2 inch RPZ device as primary. Install new 1 1/2 inch double check valve assembly as secondary device for existing SP system water piping. Install fast response valve.
X00579284-P1
02/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
02/08/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/07/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2022
Filed — Alteration
PROVIDE NEW AUTOMATIC SPRINKLER SYSTEM, ASSOCIATED SPRINKLER PIPING AND SPRINKLER HEADS ASSHOWN ON PLANS. PROVIDE BOOSTER PUMP TO SUPPLY FIRE WATER TO SPRINKLERS AT THE CELLER LEVEL
X00559376-P1
02/02/2022
Special inspection requirement — Sprinkler Systems
Magdy Youssef
01/31/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/12/2022
Permit issued — General Construction
X00570743-I1-GC
01/03/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2021
Permit issued — General Construction
X00534985-I1-GC
10/26/2021
Permit issued — Plumbing
X00570544-I1-PL
10/22/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2021
Signed off — Alteration
partial removal of the mezzanine level and partition walls, reinforce the 1st floor slab
X00519072-I1
10/07/2021
Permit issued — General Construction
X00570399-I1-GC
10/04/2021
Permit issued — Structural
X00570466-I1-ST
10/04/2021
Permit issued — General Construction
X00591867-I1-GC
10/04/2021
Permit issued — Mechanical Systems
X00570462-I1-MS
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC05/10/2022
DOB NOWGeneral ConstructionPermit IssuedMJM ASSOCIATES CONSTR LLC01/12/2022
DOB NOWGeneral ConstructionSigned-offNATIONAL MAINTENANCE INC11/16/2021
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC10/26/2021
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO10/07/2021
DOB NOWStructuralSigned-offSCHIMENTI CONSTRUCTION CO10/04/2021
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO10/04/2021
DOB NOWMechanical SystemsSigned-offSCHIMENTI CONSTRUCTION CO10/04/2021
DOB NOWSprinklersSigned-offALAN J. BRUTOSKY PLBG CON09/27/2021
DOB NOWPlumbingSigned-offALAN J BRUTOSKY PLBR CONT09/27/2021
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC09/09/2021
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC09/09/2021
DOB NOWConstruction FenceSigned-offMJM ASSOCIATES CONSTR LLC07/22/2021
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC07/21/2021
BISOTISSUEDHD HVAC OF NY INC07/22/2016
BISEQISSUEDHD HVAC OF NY INC07/22/2016
BIS—ISSUEDLONG SHOT CRANE LLC05/15/2015
BISBLISSUEDJACK PICCINI, INC04/12/2001
BISOTISSUEDNEW LIFE CONSTRUCTION CORP03/03/2000
BISFSISSUEDFRED SCHILDWACHTER & SONS11/04/1998
BIS—ISSUEDBERGER SIGN FABRICATION INC07/24/1998
BISOTISSUEDDANAPKUNSUL INC.03/12/1996
5 projects · most recent 05/26/2022
General Wiring
FiledStatusContractorScope
05/26/2022CompleteNATIONAL MAINT. INC—
03/23/2022CompleteALLRAN ELECTRIC OF NY LLCGeneral Wiring
03/23/2022CancelledNATIONAL MAINT. INC—
10/05/2021CompleteOM ELECTRIC, INCGeneral Wiring
12/03/2020CompleteOM ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/09/2022Pass-Final CND-Occupancy InspectionPassView ↗
02/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/03/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
04/08/2022Post-installed AnchorsMagdy Youssefspecial
04/08/2022Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
04/08/2022Energy Code Compliance InspectionsMagdy Youssefprogress
03/24/2022Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
03/24/2022Post-installed AnchorsMagdy Youssefspecial
03/24/2022Energy Code Compliance InspectionsMagdy Youssefprogress
02/17/2022FinalJOSEPH MARTINESprogress
02/17/2022Interior lighting powerJOSEPH MARTINESenergy_progress
02/17/2022Lighting controlsJOSEPH MARTINESenergy_progress
02/17/2022Fire-Resistant Penetrations and JointsJOSEPH MARTINESspecial
02/17/2022Energy Code Compliance InspectionsJOSEPH MARTINESprogress
02/17/2022Maintenance informationJOSEPH MARTINESenergy_progress
02/16/2022Fire-Resistant Penetrations and JointsMagdy Youssefspecial
02/15/2022Fire-Resistant Penetrations and JointsMagdy Youssefspecial
02/11/2022Fire-Resistant Penetrations and JointsMagdy Youssefspecial
02/02/2022Sprinkler SystemsMagdy Youssefspecial
09/15/2021Fire-Resistant Penetrations and JointsJOSEPH MARTINESspecial
09/15/2021Energy Code Compliance InspectionsJOSEPH MARTINESprogress
09/15/2021Maintenance informationJOSEPH MARTINESenergy_progress
09/13/2021Insulation placement and R valuesJOSEPH MARTINESenergy_progress
09/13/2021Post-installed AnchorsJOSEPH MARTINESspecial
09/13/2021Structural Stability – Alterations of existing buildingsJOSEPH MARTINESspecial
09/13/2021Structural Steel - High Strength BoltingJOSEPH MARTINESspecial
09/13/2021Structural Steel - WeldingJOSEPH MARTINESspecial
09/13/2021Fire-Resistant Penetrations and JointsJOSEPH MARTINESspecial
Latest 25 of 38.
▾Documents — 128 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/25/2026X00519072-I1Request digital key ↗
08/25/2026X00562217-I1Request digital key ↗
08/25/2026X00559376-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
07/22/2016220542633Open ↗
07/22/2016220542633Open ↗
05/16/2015220457976Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
07/22/2016220542633Open ↗
05/16/2015220457976Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00570743-I1Open ↗
▸Seals & Professional Certifications64
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026X00570466-I1Open ↗
09/23/2026X00570466-I1Open ↗
09/23/2026X00570466-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026X00570466-I1Open ↗
09/02/2026X00534985-I1Open ↗
08/28/2026X00570743-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/25/2026X00519072-I1Open ↗
08/25/2026X00562217-I1Open ↗
08/25/2026X00559376-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/22/2016220542633Open ↗
11/13/2015220457976Open ↗
05/16/2015220457976Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/22/2016220542633Open ↗
05/16/2015220457976Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/22/2016220542633Open ↗
05/16/2015220457976Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026X00570743-I1Open ↗
08/13/2026X00570743-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00570743-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00570743-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/25/2026X00519072-I1Open ↗
08/25/2026X00559376-I1Open ↗
08/25/2026X00559376-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/22/2016220542633Open ↗
05/16/2015220457976Open ↗
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026X00591867-I1Open ↗
08/13/2026X00570462-I1Open ↗
08/13/2026X00570544-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/22/2016220542633Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/23/2015220457976Open ↗
11/13/2015220457976Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
07/22/2016220542633Open ↗
11/13/2015220457976Open ↗
05/16/2015220457976Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00570743-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026X00570743-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/22/2016220542633Open ↗
05/16/2015220457976Open ↗
▸Other Documents2
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00570743-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00570743-I1Open ↗