← Back
All parking garages
38 WINANT PLACE
STATEN ISLAND · Tottenville-Charleston · BIN 5155283
💬 Discuss this project
2002Year Built
1Stories
G1Building Class
M1-1Zoning
7,331 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
All parking garages · 36,620 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Filed — no permit issued12p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN BUILD SI, INC.207/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING INC.403/21/2026
Building Lifecycle
All (32)Filed (2)Violation (5)Objection (4)Special Inspection (21)
08/17/2021
Objection raised — Scope
08/17/2021
Objection resolved — Resolved
08/13/2021
Objection raised — Scope
08/13/2021
Objection resolved — Resolved
07/30/2021
Filed — Alteration
PLUMBING WORK TO CONVERT PORTION OF EXISTING GARAGE TO ACCESSORY OFFICE SPACE
S00558027-S1
07/29/2021
Special inspection requirement — Maintenance information
07/29/2021
Special inspection requirement — Permanent certificate
07/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
07/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
07/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
07/28/2021
Special inspection requirement — Energy Code Compliance Inspections
07/26/2021
Filed — Alteration
PLUMBING WORK TO CONVERT PORTION OF EXISTING GARAGE TO ACCESSORY OFFICE SPACE
S00558027-I1
07/19/2021
Special inspection requirement — Duct leakage testing, insulation and design
07/19/2021
Special inspection requirement — Maintenance information
07/19/2021
Special inspection requirement — Structural Cold-Formed Steel
07/19/2021
Special inspection requirement — HVAC-R and service water heating system controls
07/19/2021
Special inspection requirement — Shutoff dampers
07/19/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
07/19/2021
Special inspection requirement — Permanent certificate
07/19/2021
Special inspection requirement — Interior lighting power
07/19/2021
Special inspection requirement — Heating Systems
07/19/2021
Special inspection requirement — Structural Steel - Details
07/19/2021
Special inspection requirement — Energy Code Compliance Inspections
07/19/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
07/19/2021
Special inspection requirement — HVAC-R and service water heating equipment
07/14/2021
Special inspection requirement — Final
07/14/2021
Special inspection requirement — Mechanical Systems
08/17/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/1992
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
09/08/1992
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
09/08/1992
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
09/08/1992
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDDUO PLUMBING & HTG CORP.10/18/2002
BIS—ISSUEDVAN TASSEL ENTERPRISES INC10/17/2002
1 project · most recent 07/30/2021
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2021——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Rheem RCFP-HM48 4 tons · Fan Coil Indoor ×1
Heating
Rheem R802T 80,000 BTU ×1
Ventilation
Panasonic FV-10VE2 100 CFM · Erv ×1
1 project · most recent 07/30/2021
Gas Water/Sanitary
FiledStatusContractorScope
07/30/2021——Gas, Water/Sanitary
1 project · most recent 07/30/2021
Steel
FiledStatusContractorScope
07/30/2021——Steel
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/29/2021Maintenance information—energy_progress
07/29/2021Permanent certificate—energy_progress
07/29/2021HVAC-R and service water piping design and insulation—energy_progress
07/29/2021HVAC-R and service water heating system controls—energy_progress
07/29/2021HVAC-R and service water heating equipment—energy_progress
07/28/2021Energy Code Compliance Inspections—progress
07/19/2021Duct leakage testing, insulation and design—energy_progress
07/19/2021Maintenance information—energy_progress
07/19/2021Structural Cold-Formed Steel—special
07/19/2021HVAC-R and service water heating system controls—energy_progress
07/19/2021Shutoff dampers—energy_progress
07/19/2021Fenestration and door U-factor and product ratings—energy_progress
07/19/2021Permanent certificate—energy_progress
07/19/2021Interior lighting power—energy_progress
07/19/2021Heating Systems—special
07/19/2021Structural Steel - Details—special
07/19/2021Energy Code Compliance Inspections—progress
07/19/2021HVAC-R and service water piping design and insulation—energy_progress
07/19/2021HVAC-R and service water heating equipment—energy_progress
07/14/2021Final—progress
07/14/2021Mechanical Systems—special
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026S00558027-S1Request digital key ↗
08/14/2026S00558027-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S00558027-I1Open ↗
08/13/2026S00558027-S1Open ↗