← Back
Transportation, public ownership
380 CONVENT AVENUE
MANHATTAN · BIN 1061380
💬 Discuss this project
0Year Built
—Stories
U7Building Class
R7AZoning
0 sfGross Floor Area
0Units
0 Open Violations
Transportation, public ownership · Owner of record: VERIZON NEW YORK INC. · 20,802 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalGeneralOther
Roof7p · 3 filings · 20 docs
Floor 41 filing · 2 docs
Floor 3
Floor 21p · 3 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON3707/08/2026
VERIZON WIRELESS607/08/2026
VERIZON COMMUNICATIONS LLC1103/22/2026
SPRING SCAFFOLDING LLC503/22/2026
NY TELEPHONE CO103/22/2026
BELL ATLANTIC RM 802103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor603/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
MASTEC NETWORK SOLUTIONS,General Contractor304/09/2026
ON-TRAC CONSTRUCTION ASSOGeneral Contractor303/21/2026
JAMES E FITZGERALD INCGeneral Contractor203/21/2026
EAGLE SCAFFOLDING SVCS INCGeneral Contractor203/21/2026
TRISTRUX LLCGeneral Contractor107/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor107/08/2026
SUGRUE CONTRACTING CORPGeneral Contractor107/08/2026
NAPPI, JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106204/08/2024
CROSSCHECK INSPECTION SER544505/30/2023
MERRITT ENGINEERING CONSU460103/21/2022
Building Lifecycle
All (80)Filed (12)Permit Issued (13)Signed Off (8)Violation (21)Special Inspection (26)
12/15/2025
Signed off — Alteration
Herewith filling Roof Replacement
M01035270-I1
12/10/2025
Special inspection requirement — Final
EUGENE BIFULCO
12/09/2025
Filed — Alteration
Herewith filling Roof Replacement
M01035270-P1
12/05/2025
Special inspection requirement — Final
EUGENE BIFULCO
12/05/2025
Special inspection requirement — Final
EUGENE BIFULCO
11/05/2025
Signed off — Alteration
M00718207-I1
03/18/2025
Permit issued — Antenna
M00718207-I1-AN
01/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01065092-I1
11/15/2024
Permit issued — General Construction
M01035270-I1-GC
10/22/2024
Filed — Alteration
Herewith filling Roof Replacement
M01035270-I1
10/07/2024
Permit issued — Antenna
M00718207-I1-AN
07/24/2024
Permit issued — Antenna
M00718207-I1-AN
06/24/2024
Permit issued — Protection and Mechanical Methods
M01065092-I1-PMM
06/21/2024
Filed — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01065092-I1
04/24/2024
Permit issued — Antenna
M00718207-I1-AN
04/08/2024
Filed — Alteration
M00718207-I1
06/22/2023
Signed off — Alteration
Proposed general construction and mechanical work .No change of occupancy, use, or egress.
M00771221-I1
05/30/2023
Filed — Alteration
Proposed general construction and mechanical work .No change of occupancy, use, or egress.
M00771221-P1
05/30/2023
Special inspection requirement — Maintenance information
EUGENE BIFULCO
05/30/2023
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
05/30/2023
Special inspection requirement — Final
EUGENE BIFULCO
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
05/30/2023
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
05/19/2023
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
05/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
05/19/2023
Special inspection requirement — Maintenance information
EUGENE BIFULCO
05/19/2023
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
05/19/2023
Special inspection requirement — Final
EUGENE BIFULCO
04/12/2023
Signed off — Alteration
Removal of walls, ductwork, light fixtures damaged from fire, To be replaced with new installation of fire rated partition, ductwork & light fixtures.
M00814507-I1
04/10/2023
Signed off — Alteration
M00812206-I1
02/24/2023
Permit issued — General Construction
M00814507-I1-GC
02/22/2023
Permit issued — Mechanical Systems
M00812206-I1-MS
02/21/2023
Filed — Alteration
Removal of walls, ductwork, light fixtures damaged from fire, To be replaced with new installation of fire rated partition, ductwork & light fixtures.
M00814507-I1
02/20/2023
Filed — Alteration
M00812206-I1
02/16/2023
Filed — Alteration
M00828496-I1
02/16/2023
Permit issued — Supported Scaffold
M00828496-I1-SF
02/13/2023
Signed off — Alteration
FACADE RESTORATION INCLUDING FAEBRICK/PARAPET REPLACEMENT, WINDOWS SILL AND LINTEL REPLACEMENT AND STONE PATCHING AS PERPLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00686765-I1
01/30/2023
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
01/30/2023
Special inspection requirement — Lighting controls
EUGENE BIFULCO
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
01/18/2023
Special inspection requirement — Final
EUGENE BIFULCO
01/18/2023
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
01/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
11/09/2022
Signed off — Alteration
M00731766-I1
08/05/2022
Permit issued — Mechanical Systems
M00771221-I1-GC-CX
07/25/2022
Filed — Alteration
Proposed general construction and mechanical work .No change of occupancy, use, or egress.
M00771221-I1
05/06/2022
Filed — Alteration
M00731766-I1
05/06/2022
Permit issued — Sidewalk Shed
M00731766-I1-SH
03/29/2022
Permit issued — General Construction
M00686765-I1-GC
03/21/2022
Filed — Alteration
FACADE RESTORATION INCLUDING FAEBRICK/PARAPET REPLACEMENT, WINDOWS SILL AND LINTEL REPLACEMENT AND STONE PATCHING AS PERPLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00686765-I1
02/24/2022
Special inspection requirement — Masonry
Christopher Krepcio
02/24/2022
Special inspection requirement — Final
Christopher Krepcio
11/02/2020
Permit issued — Mechanical Systems
M00340989-I1-MS
10/30/2020
Filed — Alteration
Replacement of HVAC Units and associated ducts and piping on Second Floor. New Dry cooler on 1st Floor Roof
M00340989-I1
10/27/2020
Special inspection requirement — HVAC and service water heating equipment
EUGENE BIFULCO
10/27/2020
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
10/27/2020
Special inspection requirement — HVAC insulation and sealing
EUGENE BIFULCO
04/08/2020
Special inspection requirement — Final
EUGENE BIFULCO
04/08/2020
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offMASTEC NETWORK SOLUTIONS,03/18/2025
DOB NOWGeneral ConstructionSigned-offJAMES E FITZGERALD INC11/15/2024
DOB NOWAntennaSigned-offMASTEC NETWORK SOLUTIONS,10/07/2024
DOB NOWAntennaSigned-offMASTEC NETWORK SOLUTIONS,07/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offEAGLE SCAFFOLDING SVCS IN06/24/2024
DOB NOWAntennaSigned-offTRISTRUX LLC04/24/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP02/24/2023
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP02/22/2023
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC02/16/2023
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP08/05/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/06/2022
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO03/29/2022
DOB NOWMechanical SystemsSigned-offSUGRUE CONTRACTING CORP11/02/2020
BISMHISSUEDJAMES E FITZGERALD INC10/05/2018
BISOTISSUEDJAMES E FITZGERALD INC08/09/2018
BISOTISSUEDSUGRUE CONTRACTING CORP12/11/2017
BISPLISSUEDTRADELINE PLUMBING INC06/09/2017
BISMHISSUEDSUGRUE CONTRACTING CORP05/03/2017
BISOTISSUEDSUGRUE CONTRACTING CORP01/11/2017
BISMHISSUEDGDO CONTRACTING CORP10/28/2016
BISPLISSUEDTRADELINE PLUMBING INC07/17/2013
BISOTISSUEDSUGRUE CONTRACTING CORP05/07/2013
BISOTISSUEDSUGRUE CONTRACTING CORP05/07/2013
BISPLISSUEDTRADELINE PLUMBING INC07/03/2012
BISOTISSUEDSUGRUE CONTRACTING CORP05/21/2012
BISOTISSUEDSUGRUE CONTRACTING CORP05/21/2012
BISMHISSUEDMH KANE01/06/2005
BISOTISSUEDMH KANE01/06/2005
BISMHISSUEDTISHMAN CONSTRUCTION CORP03/10/2004
BISOTISSUEDTISHMAN CONSTRUCTION CORP04/21/2003
BISMHISSUEDTISHMAN CONSTRUCTION CORP04/21/2003
BISMHISSUEDSUGRUE CONTRACTING CORP04/19/2002
BISOTISSUEDSUGRUE CONTRACTING CORP04/19/2002
BISOTISSUEDTISHMAN CONSTRUCTION CORP04/09/2002
BISMHISSUEDTISHMAN CONSTRUCTION CORP03/29/2002
BISOTISSUEDTISHMAN CONSTRUCTION CORP03/29/2002
BISPLISSUEDM AND A PLBG11/02/2001
BISFSISSUEDAL EASTMOND SONS INC07/11/2001
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.07/10/2001
BISOTISSUEDTISHMAN CONSTRUCTION CORP02/28/2001
+ 11 more permits on file
1 project · most recent 10/30/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/30/2020Signed-offSUGRUE CONTRACTING CORPAir Conditioning Systems
Cooling
Climateworx PFU065W2KGSMXXXXXBWX 9,000 CFM · Fan Coil Indoor ×1
Guntner S-GFW 090.2/2-M(4)-F6/01/8P.M 369,478 BTU · Cooling Tower ×1
5 projects · most recent 06/06/2025
General Wiring
FiledStatusContractorScope
06/06/2025Permit IssuedRNH ELECTRIC COMPANY INCGeneral Wiring
09/28/2022CompletePINTO & TEGER ELEC. CORP.General Wiring
05/03/2022CompleteTOP SHELF ELECTRIC CORP—
03/25/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
10/09/2018Permit IssuedJAMES F. VOLPE ELEC'LGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/10/2025FinalEUGENE BIFULCOprogress
12/05/2025FinalEUGENE BIFULCOprogress
12/05/2025FinalEUGENE BIFULCOprogress
05/30/2023Maintenance informationEUGENE BIFULCOenergy_progress
05/30/2023Mechanical SystemsEUGENE BIFULCOspecial
05/30/2023FinalEUGENE BIFULCOprogress
05/30/2023HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
05/30/2023Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
05/19/2023Mechanical SystemsEUGENE BIFULCOspecial
05/19/2023HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
05/19/2023Maintenance informationEUGENE BIFULCOenergy_progress
05/19/2023Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
05/19/2023FinalEUGENE BIFULCOprogress
01/30/2023Interior lighting powerEUGENE BIFULCOenergy_progress
01/30/2023Lighting controlsEUGENE BIFULCOenergy_progress
01/18/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
01/18/2023FinalEUGENE BIFULCOprogress
01/18/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
01/18/2023Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
02/24/2022MasonryChristopher Krepciospecial
02/24/2022FinalChristopher Krepcioprogress
10/27/2020HVAC and service water heating equipment EUGENE BIFULCOenergy_progress
10/27/2020Energy Code Compliance InspectionsEUGENE BIFULCOprogress
10/27/2020HVAC insulation and sealing EUGENE BIFULCOenergy_progress
04/08/2020FinalEUGENE BIFULCOprogress
Latest 25 of 26.
▾Documents — 221 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
09/02/2026M00686765-I1Request digital key ↗
09/02/2026M00731766-I1Request digital key ↗
09/02/2026M00771221-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00340989-I1Request digital key ↗
▸Applications & Permits33
▸BISWORK PERMIT APPLICATION17
07/25/2019122864150Open ↗
08/09/2018123410442Open ↗
08/09/2018123410442Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
11/20/2020140982202Open ↗
04/03/2018123410442Open ↗
02/01/2018122864150Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications63
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
07/25/2019122864150Open ↗
04/08/2019123410442Open ↗
04/08/2019123410442Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026M00814507-I1Open ↗
08/29/2026M00814507-I1Open ↗
08/29/2026M00340989-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00731766-I1Open ↗
09/02/2026M00771221-I1Open ↗
09/02/2026M00771221-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M00814507-I1Open ↗
08/29/2026M00340989-I1Open ↗
08/25/2026M00686765-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/03/2018123410442Open ↗
05/25/2017122917996Open ↗
01/03/2017122983030Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/20/2020140982202Open ↗
04/03/2018123410442Open ↗
01/03/2017122983030Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/20/2020140982202Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/20/2020140982202Open ↗
▸BISProfessional and Owner Certification (POC3)1
11/02/2016122917996Open ↗
▸BISPC FULL REPORT1
11/28/2007110024795Open ↗
▸Trade Schedules & Equipment21
▸BISEQUIPMENT USE PERMITS11
10/13/2020122937144Open ↗
04/08/2019123410442Open ↗
04/08/2019123410442Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
10/13/2020122937144Open ↗
04/08/2019123410442Open ↗
12/01/2017122983030Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
08/05/2013121028253Open ↗
01/28/2013121028253Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/06/2018122864150Open ↗
▸BISSCHEDULE B - PLUMBING1
05/07/2012121028253Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/06/2018123410442Open ↗
12/12/2017122937144Open ↗
01/03/2017122983030Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00771221-I1Open ↗
09/02/2026M00771221-P1Open ↗
08/31/2026M00812206-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M00340989-I1Open ↗
08/13/2026M01035270-I1Open ↗
08/13/2026M00686765-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/28/2007110024795Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/02/2012121028253Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
04/08/2019123410442Open ↗
04/08/2019123410442Open ↗
04/03/2018123410442Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/13/2020122937144Open ↗
04/08/2019123410442Open ↗
12/08/2017122983030Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/20/2020140982202Open ↗
10/13/2020122937144Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/07/2012121028253Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/20/2020140982202Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00771221-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00771221-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/20/2020140982202Open ↗
10/13/2020122937144Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
10/13/2020122937144Open ↗
04/08/2019123410442Open ↗
12/08/2017122983030Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/07/2012121028253Open ↗
11/28/2007110024795Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/02/2026M00731766-I1Open ↗
08/13/2026M01065092-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/21/2017122917996Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
11/20/2020140982202Open ↗
10/13/2020122937144Open ↗
04/03/2018123410442Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET9
04/03/2018123410442Open ↗
01/03/2017122983030Open ↗
11/09/2016122937144Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION6
07/25/2019122864150Open ↗
02/06/2019123410442Open ↗
12/21/2017122937144Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
04/08/2019123410442Open ↗
12/08/2017122983030Open ↗
12/08/2017122937144Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/20/2020140982202Open ↗