← Back
BuildNYC
Two stories - detached, small or mid-size
380 IONIA AVENUE
STATEN ISLAND · BIN 5080916
💬 Discuss this project
1966Year Built
2Stories
A1Building Class
R3XZoning
2,360 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte105/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jbi Construction Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. Construction GroupGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116105/24/2025
Building Lifecycle
10/30/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01227965-I1
05/29/2025
Permit issued — Solar
S01227965-I1-SL
05/24/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01227965-I1
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. Construction Group05/29/2025
1 project · most recent 05/06/2025
FiledStatusContractorScope
05/06/2025CompleteJSP Electl CNTNG—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/19/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/19/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/19/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
05/19/2025FinalVYACHESLAV NECHAYEVprogress
05/19/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account