3800 BAYCHESTER AVENUE · Eastchester-Edenwald-Baychester · BIN 2066190
💬 Discuss this project
1959Year Built
3Stories
W1Building Class
R4Zoning
219,285 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 8 unresolved · 6 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 675,539 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 2 filings · 20 docs
Floor 3Under Construction14p · 2 filings · 20 docs
Floor 2Under Construction15p · 2 filings · 20 docs
Floor 1Under Construction18p · 2 filings · 20 docs
CellarUnder Construction35p · 1 filing · 20 docs
Sub-BasementUnder Construction28p · 1 filing · 20 docs
Site & exteriorUnder Construction69p · 6 filings · 20 docs
Filed — no permit issued51p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY SCHOOL CONSTRUCTION AUTHORITY2203/21/2026
SCHOOL CONSTRUCTION AUTHORITY1203/21/2026
NYC SCHOOL CONSTRUCTION AUTHORIT1103/21/2026
NEW YORK CITY PUBLIC SCHOOL608/29/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION103/21/2026
DEPARTMENT OF EDUCATION DSF103/21/2026
NY SCHOOL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RA3003/21/2026
AK CONSULTING SERVICES1203/21/2026
NELLIGAN WHITE ARCHITECTS1403/21/2026
ACE EXPEDITING & CONSULTING SERVICE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRO-METAL CONSTRUCTIONGeneral Contractor3007/11/2026
ROCON CORPGeneral Contractor2107/31/2026
PRIME CONTRACTORS, INCGeneral Contractor1204/09/2026
CHAPMAN & EVANS INCGeneral Contractor610/01/2026
ROCON CORPPlumbing507/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
ARORA CONSTRUCTION INCGeneral Contractor209/19/2026
SORTINO JOSEPHElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
SALVATORE ROMANOElectrical103/21/2026
ON GUK TSEElectrical103/21/2026
NEW PHASE ELEC'L CONTR'SElectrical103/22/2026
JOSHUA ANDERSONElectrical103/21/2026
L.L.G. PLBG & HTG INCPlumbing106/28/2026
HEXAGON CONST & ELECL GRPElectrical103/22/2026
DEMETRIOS ANDRIANOPOULOSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106506/03/2026
TWIN PEAKS INC.3171001/14/2026
JPC LOGISTICS DBA JPCL EN351405/12/2025
FUTURE TECH CONSULTANTS O5891204/21/2025
SOCOTEC ENGINEERING4983102/23/2022
Building Lifecycle
All (259)Filed (51)Permit Issued (64)Signed Off (2)Violation (60)Inspection (9)Objection (43)Special Inspection (30)
09/30/2026
Permit issued — Mechanical Systems
X00708420-S2-MS
09/18/2026
Permit issued — General Construction
X01082355-I1-GC
08/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/31/2026
Objection resolved — Resolved
07/30/2026
Permit issued — Mechanical Systems
X00683312-S1-MS
07/30/2026
Permit issued — General Construction
X00683312-S2-GC
07/27/2026
Signed off — Alteration
Filing Construction Fence Application in conjunction with DOB # X00683312, There is no change in Use, Occupancy or Egress.
X00877679-I1
07/27/2026
Signed off — Alteration
Filing Construction Fence Application in conjunction with DOB # X00683312, There is no change in Use, Occupancy or Egress.
X00877679-S1
07/20/2026
Objection raised — Other
07/10/2026
Filed — Alteration
FILE MECHANICAL WORK TO INSTALL (2)SPLIT HVAC UNITS AT ROOF ABOVE 3 STORY FOR PUBLIC SCHOOL X142. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01151770-I1
07/10/2026
Permit issued — Sidewalk Shed
X00879874-I1-SH
06/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/23/2026
Permit issued — Protection and Mechanical Methods
X00976733-I1-PMM
06/23/2026
Permit issued — Structural
X00708420-S3-ST
06/23/2026
Permit issued — Construction Fence
X00879878-I1-FN
06/23/2026
Permit issued — General Construction
X00708420-I1-GC
06/09/2026
Permit issued — General Construction
X00877679-S2-GC-CX
06/08/2026
Objection resolved — Addressed
06/05/2026
Objection raised — Other
06/03/2026
Filed — Alteration
The structural scope of work: 1.Provide cast-in-place concrete slab for raised slab in boiler room. 2.Provide slab on grade for restoration due to trenching for sanitary pipe connection.
X01038357-P1
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Permit issued — Plumbing
X00683312-S3-PL
04/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE CAFETERIA.
X01386852-I1
04/16/2026
Special inspection requirement — Maintenance information
Asma Hashmi
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
04/14/2026
Special inspection requirement — Final
Asma Hashmi
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/14/2026
Special inspection requirement — Mechanical Systems
04/14/2026
Special inspection requirement — Post-installed Anchors
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
04/08/2026
Permit issued — Sidewalk Shed
X00879874-I1-SH
04/04/2026
Violation issued (ECB, open)
Construction
04/04/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2026
Violation issued (ECB, open)
Construction
04/03/2026
Violation issued (ECB, open)
Construction
04/03/2026
Violation issued (ECB, open)
Construction
04/03/2026
Violation issued (ECB, open)
Construction
03/24/2026
Permit issued — Plumbing
X00708420-S1-PL
02/20/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
02/19/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Other
01/14/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR I.S. 529 AT 3750 BAYCHESTER AVENUE, BRONX IN CONJUNCTION WITH ALT# X00708420 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00879880-P1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2025
Permit issued — Mechanical Systems
X00708420-S2-MS
10/27/2025
Objection resolved — Addressed
10/20/2025
Permit issued — Plumbing
X01082355-S1-PL
10/20/2025
Objection raised — Other
10/16/2025
Filed — Alteration
Demolish piping, boiler appurt, boilers, boilers breaching, Prefab chimney, draft inducers, vacuum & condensate pumps. Install new boilers, burner control panels, duplex set of vacuum pumps, boiler feed water tank, controls, instrumentation & alarms.
X00683312-A7
10/14/2025
Permit issued — General Construction
X01082355-I1-GC
09/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
09/11/2025
Objection resolved — Addressed
09/05/2025
Violation issued (ECB, closed)
Construction
09/05/2025
Violation issued (ECB, open)
Construction
Latest 60 of 259 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCHAPMAN & EVANS INC09/30/2026
DOB NOWGeneral ConstructionPermit IssuedARORA CONSTRUCTION INC09/18/2026
DOB NOWMechanical SystemsPermit IssuedROCON CORP07/30/2026
DOB NOWGeneral ConstructionPermit IssuedROCON CORP07/30/2026
DOB NOWSidewalk ShedPermit IssuedPRO-METAL CONSTRUCTION07/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRO-METAL CONSTRUCTION06/23/2026
DOB NOWStructuralPermit IssuedPRO-METAL CONSTRUCTION06/23/2026
DOB NOWConstruction FencePermit IssuedPRO-METAL CONSTRUCTION06/23/2026
DOB NOWGeneral ConstructionPermit IssuedPRO-METAL CONSTRUCTION06/23/2026
DOB NOWGeneral ConstructionSigned-offROCON CORP06/09/2026
DOB NOWPlumbingPermit IssuedROCON CORP04/30/2026
DOB NOWSidewalk ShedPermit IssuedPRO-METAL CONSTRUCTION04/08/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/24/2026
DOB NOWMechanical SystemsPermit IssuedCHAPMAN EVANS10/30/2025
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC10/20/2025
DOB NOWGeneral ConstructionPermit IssuedARORA CONSTRUCTION INC10/14/2025
DOB NOWGeneral ConstructionPermit IssuedROCON CORP08/29/2025
DOB NOWMechanical SystemsPermit IssuedROCON CORP08/29/2025
DOB NOWSidewalk ShedPermit IssuedPRIME CONTRACTORS, INC07/09/2025
DOB NOWSupported ScaffoldPermit IssuedPRIME CONTRACTORS, INC07/09/2025
DOB NOWMechanical SystemsPermit IssuedCHAPMAN EVANS07/08/2025
DOB NOWMechanical SystemsSigned-offROCON CORP07/08/2025
DOB NOWGeneral ConstructionPermit IssuedPRO-METAL CONSTRUCTION06/24/2025
DOB NOWStructuralPermit IssuedPRO-METAL CONSTRUCTION06/24/2025
DOB NOWConstruction FencePermit IssuedPRO-METAL CONSTRUCTION06/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRO-METAL CONSTRUCTION06/24/2025
DOB NOWConstruction FenceSigned-offROCON CORP05/27/2025
DOB NOWPlumbingPermit IssuedROCON CORP04/28/2025
DOB NOWPlumbingPermit IssuedROCON CORP04/25/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING04/03/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/12/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRO-METAL CONSTRUCTION02/28/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRO-METAL CONSTRUCTION02/06/2025
DOB NOWGeneral ConstructionPermit IssuedPRO-METAL CONSTRUCTION10/25/2024
DOB NOWConstruction FencePermit IssuedPRO-METAL CONSTRUCTION10/16/2024
DOB NOWStructuralPermit IssuedPRO-METAL CONSTRUCTION10/16/2024
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC10/10/2024
DOB NOWGeneral ConstructionPermit IssuedROCON CORP08/23/2024
DOB NOWPlumbingPermit IssuedROCON CORP08/20/2024
DOB NOWMechanical SystemsPermit IssuedROCON CORP08/20/2024
+ 60 more permits on file
6 projects · most recent 07/10/2026
Air Conditioning Systems Heating Systems Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2026——Air Conditioning Systems
Cooling
York YC120C00A2AAA6 120,000 BTU · Heat Pump Outdoor ×2
04/17/2026——Air Conditioning Systems
Cooling
Lg LG ZRNU363SRAA 35,000 BTU · Vrf Indoor ×8
LG ZRUM144DTE6 138,000 BTU · Vrf Outdoor ×2
10/16/2025Permit IssuedROCON CORPAssociated Ducts and Piping, Heating Systems
Heating
Burnham 3L-125 5,230 BTU · Boiler ×6
Ducts & Piping
— Ducts Ductwork ×2
05/12/2025——Air Conditioning Systems
Cooling
Fujitsu ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×9
AOU96RLAVL 96,000 BTU · Condensing Unit ×3
10/27/2023——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 38,000 BTU · Fan Coil Indoor ×9
AOU96RLAVL 108,000 BTU · Condensing Unit ×3
10/10/2023Signed-offROCON CORPHeating Systems
Heating
Rockmills MP4-212 8,946,000 BTU · Boiler ×2
3 projects · most recent 10/16/2025
Storm Water/Sanitary Gas
FiledStatusContractorScope
10/16/2025Permit IssuedROCON CORPGas, Storm, Water/Sanitary
12/31/2024——Water/Sanitary
06/06/2024Permit IssuedVARSITY PLBG AND HTG INCStorm
20 projects · most recent 07/13/2026
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedJAMCOB ELECTRIC LLCLighting
06/25/2026CompleteGEMINI ELECTRIC CO., INC.—
11/11/2025Permit IssuedHEXAGON CONST & ELECL GRPGeneral Wiring
10/14/2025Permit IssuedDORION NORTON ELECL CONTGeneral Wiring
04/09/2024Permit IssuedHI-RITE ELECTRIC CORPHVAC Wiring
03/04/2024CompleteGEMINI ELECTRIC CO., INC.—
09/11/2023Permit IssuedSTANCO SYSTEM ELEC'L CONT—
09/08/2023Permit IssuedJ & T GENERAL CORP DBAGeneral Wiring
06/29/2023Permit IssuedAUJLA ELECTRIC CORP—
06/09/2023CompleteHEXAGON CONST & ELECL GRP—
04/26/2023CompleteANCO ELECTL CONTCTNG INC—
01/27/2023CompleteCHARAN ELEC'L ENTERP'S IN—
12/21/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
11/29/2022CompleteGEMINI ELECTRIC CO., INC.—
07/15/2022CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 06/03/2026
Concrete Steel
FiledStatusContractorScope
06/03/2026——Concrete
06/06/2024Permit IssuedCHAPMAN & EVANS INCSteel, Concrete
3 projects · most recent 01/14/2026
Fence Scaffold
FiledStatusContractorScope
01/14/2026Permit IssuedPRIME CONTRACTORS, INCScaffold
10/10/2023Signed-offROCON CORPFence
06/19/2023Permit IssuedPRO-METAL CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/25/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/23/2025Fail-Final Boiler Equipment InspectionFailView ↗
08/28/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/16/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
04/16/2026Maintenance informationAsma Hashmienergy_progress
04/16/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
04/16/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
04/14/2026Fire-Resistant Penetrations and Joints—special
04/14/2026Energy Code Compliance InspectionsAsma Hashmiprogress
04/14/2026FinalAsma Hashmiprogress
04/14/2026Mechanical Systems—special
04/14/2026Post-installed Anchors—special
02/20/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
09/14/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/04/2025Post-installed AnchorsMIKHAIL ZEYGMANspecial
08/19/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/22/2025Heating SystemsNoel Tolentinospecial
04/22/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsNoel Tolentinospecial
04/21/2025Heating SystemsNoel Tolentinospecial
04/21/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsNoel Tolentinospecial
04/16/2025Post-installed AnchorsAsma Hashmispecial
04/16/2025FinalAsma Hashmiprogress
04/16/2025Mechanical SystemsAsma Hashmispecial
04/16/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
04/16/2025Energy Code Compliance InspectionsAsma Hashmiprogress
03/10/2025Heating SystemsNoel Tolentinospecial
03/10/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsNoel Tolentinospecial
12/30/2024Fire-Resistant Penetrations and JointsAsma Hashmispecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
I.S. 355 - Bronx Alliance Middle SchoolEducationSub-basement
Project X01386852 Alteration · Approved · 04/17/2026
I.S. 142EducationFloor 1
Project X01082355 Alteration · Permit Entire · 08/06/2024
I.s.529bronxEducation—
Project X00879880 Alteration · Permit Entire · 06/06/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 354 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch50
08/24/2026X00683312-S1Request digital key ↗
08/24/2026X00683312-A6Request digital key ↗
08/24/2026X00683312-S3Request digital key ↗
Showing 3 of 50 on file for this type
▸Seals & Professional Certifications126
▸DOB NOWDPL-1: Design Professional Seal & Signature50
08/24/2026X00683312-A3Open ↗
08/24/2026X00683312-P2Open ↗
08/24/2026X00683312-S2Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/23/2026X00683312-I1Open ↗
09/23/2026X00877679-S1Open ↗
09/01/2026X00683312-P7Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
09/01/2026X00683312-P7Open ↗
09/01/2026X00708420-P1Open ↗
09/01/2026X00708420-P1Open ↗
Showing 3 of 37 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026X01151770-I1Open ↗
Showing 1 of 4 on file for this type
▸Approvals, Objections & Sign-offs118
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter50
08/24/2026X00683312-A6Open ↗
08/24/2026X00683312-S2Open ↗
08/24/2026X00683312-A4Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)47
08/24/2026X00683312-S1Open ↗
08/24/2026X00683312-S2Open ↗
08/24/2026X00683312-S3Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDEP Variance (V5) letter11
08/16/2026X01038357-I1Open ↗
Showing 1 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)10
08/22/2026X00877679-I1Open ↗
08/22/2026X00877679-S2Open ↗
08/22/2026X00877679-S1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents50
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal46
08/24/2026X00683312-S3Open ↗
08/24/2026X00683312-A3Open ↗
08/24/2026X00683312-A2Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/22/2026X00877679-I1Open ↗
08/22/2026X00877679-S1Open ↗
08/22/2026X00877679-S2Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type