Public elementary, junior or senior high
P.S. 119 Amersfort
3801 AVENUE K · BIN 3215816
💬 Discuss this project
1931Year Built
3Stories
W1Building Class
R4Zoning
39,853 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 44,000 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof4p · 2 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2907/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPT OF EDUCATION P.S.K11303/22/2026
DOE P.S. 119403/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
P.S. 119 DOE803/22/2026
DOE 040203/22/2026
D.O.E. 0203/22/2026
D.O.E 04103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEPHEN B JACOBS GROUP808/26/2024
AME SERVICES INC302/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STEPHEN B JACOBS GROUP1603/21/2026
AME SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KVP CONSTRUCTION CORPGeneral Contractor507/08/2026
ROMA SCAFFOLDING INCGeneral Contractor407/08/2026
FORSYTHE P&H CORPPlumbing207/08/2026
CHAYUT, ALLENElectrical103/21/2026
COONEY, RONANElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
A & S ELECTRIC INC.Electrical103/22/2026
LUPINSKI, MAREKElectrical103/21/2026
MARTANY TILE CORPElectrical103/21/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
BORRELLI, RAFFAELEElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317408/26/2024
FUTURE TECH CONSULTANTS O589101/26/2023
Building Lifecycle
All (119)Filed (11)Permit Issued (7)Signed Off (5)Violation (60)Inspection (2)Objection (12)Special Inspection (22)
07/10/2025
Violation issued (FDNY_ORDER, closed)
01/24/2025
Violation issued (FDNY_ORDER, closed)
10/10/2024
Signed off — Alteration
Replacement of roof drains and associated piping.
B00676427-I1
10/10/2024
Signed off — Alteration
Replacement of roof drains and associated piping.
B00676427-S1
10/08/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/11/2024
Signed off — Alteration
Filing for the installation of temporary fence on behalf of contractor
B00774353-I1
08/26/2024
Filed — Alteration
Replacement of roof drains and associated piping.
B00676427-P7
08/26/2024
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
08/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
08/26/2024
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
08/26/2024
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
08/26/2024
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
08/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
04/11/2024
Permit issued — Plumbing
B00676427-S1-PL
04/11/2024
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
04/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
04/11/2024
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
04/11/2024
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
04/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
04/09/2024
Objection resolved — Addressed
04/04/2024
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
04/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
04/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2023
Permit issued — General Construction
B00676427-I1-GC
11/17/2023
Signed off — Alteration
Filing for the installation of pipe scaffolding on behalf of contractor
B00774360-I1
11/17/2023
Signed off — Alteration
B00774365-I1
11/15/2023
Violation issued (FDNY_NOV, closed)
11/15/2023
Objection raised — Other
11/09/2023
Filed — Alteration
Replacement of roof drains and associated piping.
B00676427-P4
11/09/2023
Filed — Alteration
Replacement of roof drains and associated piping.
B00676427-P5
11/08/2023
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
11/08/2023
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
11/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
05/10/2023
Permit issued — Plumbing
B00676427-S1-PL
05/04/2023
Filed — Alteration
Replacement of roof drains and associated piping.
B00676427-P3
03/08/2023
Violation issued (ECB, closed)
Construction
03/08/2023
Violation issued (ECB, closed)
Construction
03/07/2023
Permit issued — General Construction
B00676427-I1-GC
03/01/2023
Permit issued — Supported Scaffold
B00774360-I1-SF
03/01/2023
Permit issued — Sidewalk Shed
B00774365-I1-SH
02/09/2023
Permit issued — Construction Fence
B00774353-I1-FN
02/09/2023
Objection raised — Other
02/09/2023
Objection resolved — Addressed
02/03/2023
Filed — Alteration
Filing for the installation of temporary fence on behalf of contractor
B00774353-I1
02/03/2023
Filed — Alteration
B00774365-I1
02/02/2023
Filed — Alteration
Filing for the installation of pipe scaffolding on behalf of contractor
B00774360-I1
01/26/2023
Filed — Alteration
Replacement of roof drains and associated piping.
B00676427-P1
01/26/2023
Filed — Alteration
Replacement of roof drains and associated piping.
B00676427-P2
01/25/2023
Special inspection requirement — Masonry
Michael Marchese
01/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
01/10/2023
Violation issued (FDNY_NOV, closed)
07/28/2022
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
04/22/2022
Objection resolved — Addressed
04/22/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Other
04/12/2022
Objection raised — Other
04/07/2022
Objection resolved — Addressed
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFORSYTHE P&H CORP04/11/2024
DOB NOWGeneral ConstructionSigned-offKVP CONSTRUCTION CORP12/05/2023
DOB NOWPlumbingSigned-offFORSYTHE P&H CORP05/10/2023
DOB NOWGeneral ConstructionSigned-offKVP CONSTRUCTION CORP03/07/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC03/01/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC03/01/2023
DOB NOWConstruction FenceSigned-offKVP CONSTRUCTION CORP02/09/2023
BISOTISSUEDMARIC MECHANICAL INC11/26/2019
BISEQISSUEDMARIC MECHANICAL INC05/11/2018
BISEQISSUEDMARIC MECHANICAL INC03/20/2018
BISOTISSUEDMARIC MECHANICAL INC03/20/2018
BISOTISSUEDMARIC MECHANICAL INC03/20/2018
BISMHISSUEDMARIC MECHANICAL INC03/20/2018
BISMHISSUEDMARIC MECHANICAL INC03/20/2018
BISOTISSUEDMARIC MECHANICAL INC03/20/2018
BISPLISSUEDFORSYTHE P&H CORP02/26/2018
BISEQISSUEDMARIC MECHANICAL INC02/26/2018
BISBLISSUEDFORSYTHE P&H CORP06/20/2017
BISFSISSUEDDOUGLAS SIMMONS05/01/2017
BISOTISSUEDMARIC MECHANICAL INC03/28/2017
BISMHISSUEDMARIC MECHANICAL INC03/28/2017
BISMHISSUEDMARIC MECHANICAL INC03/28/2017
BISOTISSUEDMARIC MECHANICAL INC03/28/2017
BISOTISSUEDMARIC MECHANICAL INC03/28/2017
BISEQISSUEDMARIC MECHANICAL INC03/23/2017
BISOTISSUEDMARIC MECHANICAL INC03/09/2017
BISOTISSUEDMARIC MECHANICAL INC03/09/2017
BISOTISSUEDMARIC MECHANICAL INC03/09/2017
BISMHISSUEDMARIC MECHANICAL INC03/09/2017
BISPLISSUEDFORSYTHE P&H CORP03/09/2017
BISMHISSUEDMARIC MECHANICAL INC02/27/2017
BISEQISSUEDMARIC MECHANICAL INC02/27/2017
BISOTISSUED2 SAAB CONSTRUCTION INC01/09/2017
BISOTISSUED2 SAAB CONSTRUCTION INC01/05/2017
BISOTISSUED2 SAAB CONSTRUCTION INC01/05/2017
BISOTISSUED2 SAAB CONSTRUCTION INC12/08/2016
BISOTISSUED2 SAAB CONSTRUCTION INC11/29/2016
BISOTISSUED2 SAAB CONSTRUCTION INC09/29/2016
BISOTISSUED2 SAAB CONSTRUCTION INC09/29/2016
BISPLISSUEDVITAL PLUMBING, INC01/27/2016
+ 13 more permits on file
9 projects · most recent 03/30/2026
Lighting General Wiring
FiledStatusContractorScope
03/30/2026CompleteCANDELA SYSTEMS CORP DBALighting
02/05/2026Permit IssuedPLUS ELECTRIC INCLighting
12/08/2025Permit IssuedALL BORO ELECTRIC CORPGeneral Wiring
04/27/2023CompleteHEXAGON CONST & ELECL GRPLighting
04/01/2023CompleteHYLAN DATACOM & ELECL LLC—
02/14/2023CompleteHYLAN DATACOM & ELECL LLC—
10/07/2020CompleteA & S ELECTRIC INC.—
08/29/2019CompleteA.T.J. ELECTRICAL CO.INC.—
09/27/2018CompleteCHARAN ELEC'L ENTERP'S IN—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/08/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/26/2024MasonryMIKHAIL ZEYGMANspecial
08/26/2024Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
08/26/2024Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
08/26/2024Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
08/26/2024Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
08/26/2024Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
04/11/2024MasonryMIKHAIL ZEYGMANspecial
04/11/2024Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
04/11/2024Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
04/11/2024Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
04/11/2024Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
04/11/2024Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
04/04/2024Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
04/04/2024Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
11/08/2023Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
11/08/2023MasonryMIKHAIL ZEYGMANspecial
11/08/2023Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
11/08/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
01/25/2023MasonryMichael Marchesespecial
01/25/2023Structural Stability – Alterations of existing buildings—special
01/25/2023Energy Code Compliance InspectionsMichael Marcheseprogress
07/28/2022Post-installed AnchorsMIKHAIL ZEYGMANspecial
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/31/2026B00676427-P2Request digital key ↗
08/31/2026B00676427-P3Request digital key ↗
08/31/2026B00676427-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00676427-P2Open ↗
08/31/2026B00676427-I1Open ↗
08/31/2026B00676427-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/25/2026B00676427-P7Open ↗
09/25/2026B00676427-P7Open ↗
09/25/2026B00676427-P7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/25/2026B00676427-P7Open ↗
09/25/2026B00676427-P7Open ↗
09/01/2026B00676427-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B00774365-I1Open ↗
08/13/2026B00774360-I1Open ↗
08/13/2026B00774353-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00676427-S1Open ↗
08/13/2026B00676427-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00676427-I1Open ↗
▸Approvals, Objections & Sign-offs29
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/31/2026B00676427-P2Open ↗
08/31/2026B00676427-P3Open ↗
08/31/2026B00676427-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/31/2026B00676427-P2Open ↗
08/31/2026B00676427-P1Open ↗
08/31/2026B00676427-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026B00774353-I1Open ↗
08/13/2026B00774360-I1Open ↗
08/13/2026B00774365-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B00676427-I1Open ↗
08/13/2026B00676427-S1Open ↗
▸Other Documents17
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal11
08/31/2026B00676427-P2Open ↗
08/31/2026B00676427-P1Open ↗
08/31/2026B00676427-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/31/2026B00676427-P1Open ↗
08/15/2026B00676427-I1Open ↗
08/15/2026B00676427-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026B00676427-S1Open ↗
08/13/2026B00676427-I1Open ↗