← Back
BuildNYC
Three families
3804 SHORE PARKWAY
BROOKLYN · BIN 3247898
💬 Discuss this project
1965Year Built
3Stories
C0Building Class
R4-1Zoning
3,562 sfGross Floor Area
3Units
Three families · 2,805 sf lot · 1.27 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Gas work scope change6p · 2 filings · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Miele Associates307/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Miele Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACS System AssociatesGeneral Contractor104/09/2026
Varsity Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
11/26/2025
Signed off — Alteration
Restore garage door, replace shower, install laundry equipment and remove bathroom at First Floor.
B01107015-I1
11/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2025
Signed off — Alteration
Replace existing shower with bathtub, install new washing machine and remove existing lavatory, water closet, shower and stove at first floor.
B01107043-I1
10/31/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVarsity Plumbing & Heating02/13/2025
DOB NOWGeneral ConstructionSigned-offACS System Associates01/22/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/31/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/09/2024Fenestration air leakageJoel Mieleenergy_progress
10/09/2024Fenestration and door U-factor and product ratingsJoel Mieleenergy_progress
10/09/2024Fenestration areasJoel Mieleenergy_progress
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account