Miscellaneous religious facility
3809 BRONXWOOD AVENUE
BRONX · BIN 2058559
💬 Discuss this project
1920Year Built
3Stories
M9Building Class
R5DZoning
18,386 sfGross Floor Area
5Units
Rent Stabilized22 Active Violations 13 unresolved · 9 paperwork only ▸
Miscellaneous religious facility · Owner of record: Gospel Assembley Church/Jesus Christ Apo Stolic · 10,606 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Gospel Assembly Church of Jesus3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Gospel Assembly Church of Jesus507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Errol McIntosh, R.A111/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting Service103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Envision Design & ConstructionGeneral Contractor407/08/2026
Building Lifecycle
All (12)Filed (1)Permit Issued (2)Violation (2)Special Inspection (7)
12/04/2023
Violation issued (ECB, open)
Unknown
12/10/2022
Permit issued — General Construction
X08024813-I1-GC
12/01/2022
Permit issued — General Construction
X08024813-I1-GC
11/17/2022
Violation issued (HPD, closed)
I
11/09/2022
Filed — Alteration
Rearrangement of partitions as shown on plans.
X08024813-I1
10/27/2022
Special inspection requirement — Energy Code Compliance Inspections
ERROL MCINTOSH
10/27/2022
Special inspection requirement — Fenestration air leakage
ERROL MCINTOSH
10/27/2022
Special inspection requirement — Air barrier - visual inspection
ERROL MCINTOSH
10/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ERROL MCINTOSH
10/27/2022
Special inspection requirement — Interior lighting power
ERROL MCINTOSH
10/27/2022
Special inspection requirement — Fenestration areas
ERROL MCINTOSH
10/27/2022
Special inspection requirement — Lighting controls
ERROL MCINTOSH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEnvision Design & Construction12/10/2022
DOB NOWGeneral ConstructionPermit IssuedEnvision Design & Construction12/01/2022
2 projects · most recent 01/19/2024
General Wiring
FiledStatusContractorScope
01/19/2024Permit IssuedTriple D Electric—
12/21/2022CompleteTriple D ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/27/2022Energy Code Compliance InspectionsERROL MCINTOSHprogress
10/27/2022Fenestration air leakageERROL MCINTOSHenergy_progress
10/27/2022Air barrier - visual inspectionERROL MCINTOSHenergy_progress
10/27/2022Fenestration and door U-factor and product ratingsERROL MCINTOSHenergy_progress
10/27/2022Interior lighting powerERROL MCINTOSHenergy_progress
10/27/2022Fenestration areasERROL MCINTOSHenergy_progress
10/27/2022Lighting controlsERROL MCINTOSHenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Gospel Assembly Church of JesusReligiousFloor 1
Project X08024813 Alteration · Permit Entire · 11/09/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026X08024813-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature7
09/21/2026X08024813-I1Open ↗
09/21/2026X08024813-I1Open ↗
09/21/2026X08024813-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X08024813-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X08024813-I1Open ↗