← Back
BuildNYC
Elevator cooperative
3810 GREYSTONE AVENUE
BRONX · BIN 2084038
💬 Discuss this project
1939Year Built
6Stories
D4Building Class
R6Zoning
41,068 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized6 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 3810 Greystone Tenants · 10,000 sf lot · 4.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRobert E. Hill, INC.8p · 1 filing · 20 docs
Floor 5Robert E. Hill, INC.7p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1Unit 1067p · 3 filings · 14 docs
CellarRobert E. Hill, INC.10p · 1 filing · 8 docs
Site & exteriorRobert E. Hill, Inc.4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Robert E. Hill3707/08/2026
3810 Greystone Tenants1103/22/2026
Bronstein Properties807/08/2026
3810_Greystone Partnership303/21/2026
3810 Greystone Avenue Tenant103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Roman S. Mardarewich Architect303/09/2026
Dynamic Structures310/13/2025
Ospino Engineering410/08/2025
ZS Design Architect202/27/2025
Ashraf107/22/2024
Syed Engineering108/28/2019
Haider Engineering, P.E105/13/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AC Building Consultants403/21/2026
Haider Engineering, P.E103/21/2026
SKY Management Group603/21/2026
Municipal Building Consultants303/21/2026
Hierarch-E1003/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold404/08/2026
Kings Group NYScaffold407/08/2026
Sadhia Contracting GroupGeneral Contractor303/21/2026
BrenmacScaffold303/21/2026
Pofi ConstructionGeneral Contractor206/28/2026
Kingfisher General Contracting*General Contractor107/08/2026
Goldman ElectricElectrical103/21/2026
WTC Plumbing & HeatingPlumbing107/08/2026
Ket ElectricElectrical103/22/2026
Ket ElectricElectrical103/21/2026
RJ Electrical ContractorsElectrical103/22/2026
GP Enterprises of Westch*General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting1688310/13/2025
A&B World Consulting5704107/02/2025
George J. Xerakias, PE1658107/26/2024
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
09/22/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
X01249288-S1-MS
07/21/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01041180-I1-GC
07/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
196 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPofi Construction06/09/2026
DOB NOWSuspended ScaffoldSigned-offPofi Construction04/07/2026
DOB NOWMechanical SystemsPermit IssuedGP Enterprises of Westch*03/24/2026
DOB NOWPlumbingSigned-offWTC Plumbing & Heating02/05/2026
DOB NOWGeneral ConstructionSigned-offKingfisher General Contracting*09/02/2025
DOB NOWGeneral ConstructionPermit IssuedPofi Construction07/21/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding07/17/2025
DOB NOWGeneral ConstructionSigned-offSadhia Contracting Group05/28/2025
DOB NOWSuspended ScaffoldSigned-offPofi Construction04/16/2025
DOB NOWSuspended ScaffoldSigned-offPofi Construction03/27/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding07/22/2024
DOB NOWGeneral ConstructionPermit IssuedPofi Construction07/05/2024
DOB NOWSidewalk ShedSigned-offKings Group NY09/23/2019
DOB NOWSidewalk ShedSigned-offKings Group NY08/30/2019
DOB NOWSidewalk ShedPermit IssuedBrenmac05/15/2019
BISOTISSUEDRomo Construction05/21/2019
BISOTISSUEDAdelphi Restoration06/08/2012
BISEQISSUEDEverest Scaffolding05/08/2012
BISPLISSUEDAlklem Plumbing02/28/2012
BISFSISSUEDMarlande Heating02/28/2012
BISEQISSUEDSpring Scaffolding01/07/2005
BISEQISSUEDSpring Scaffolding01/09/2004
1 project · most recent 03/09/2026
Ventilation Systems
FiledStatusContractorScope
03/09/2026Permit IssuedGP Enterprises of Westch*Ventilation Systems
1 project · most recent 03/09/2026
FiledStatusContractorScope
03/09/2026———
1 project · most recent 03/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/09/2026Signed-offWTC Plumbing & HeatingGas, Water/Sanitary
5 projects · most recent 05/16/2025
General Wiring
FiledStatusContractorScope
05/16/2025CompleteKet ElectricGeneral Wiring
02/26/2025CompleteE.T. Electrical Contracting CoGeneral Wiring
08/26/2024CompleteBorowide Elect'l Contractors—
08/28/2019CompleteRichard Neu—
04/22/2019CompleteRJ Electrical Contractors—
1 project · most recent 07/22/2024
Sidewalk Shed
FiledStatusContractorScope
07/22/2024Signed-offAndamio ScaffoldingSidewalk Shed
1 project · most recent 10/13/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/13/2025Signed-offPofi ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/28/2026Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
03/27/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/27/2025Tenant Protection Plan Compliance—special
10/27/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
10/27/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
10/27/2025Air barrier - visual inspectionHans Arntsenenergy_progress
10/27/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
10/27/2025FinalHans Arntsenprogress
10/06/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
09/23/2025Tenant Protection Plan Compliance—special
09/23/2025Air barrier - visual inspectionHans Arntsenenergy_progress
09/23/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
09/23/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
09/23/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/23/2025FinalHans Arntsenprogress
07/01/2025FinalROMAN MARDAREWICHprogress
07/01/2025Mechanical SystemsAlexander Bomsteinspecial
05/15/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/06/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
02/27/2025FinalDONALD SCHWETERprogress
01/02/2025Final—progress
08/23/2019FinalRAFI HAMIDprogress
168 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account