← Back
BuildNYC
One family attached or semi-detached
3815 LACONIA AVENUE
BRONX · BIN 2059651
💬 Discuss this project
1955Year Built
3Stories
A5Building Class
R5DZoning
—Gross Floor Area
1Units
0 Active Violations
One family attached or semi-detached · 1.04 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Basement and 1st floor gas piping and plumbing2p · 1 filing · 4 docs
BasementBasement and 1st floor gas piping and plumbing2p · 1 filing · 4 docs
Sub-BasementBasement and 1st floor gas piping and plumbing2p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JT Engineering111/04/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ips PlumbingPlumbing307/08/2026
Island ElectricElectrical103/21/2026
Venture Home SolarGeneral Contractor103/21/2026
Empower CESGeneral Contractor112/01/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JT Engineering7840111/04/2024
Building Lifecycle
01/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2024
Permit issued — Plumbing
X01130224-I1-PL
11/04/2024
Filed — Alteration
GAS RE-PIPING WITH EXISTING APPLIANCES TO REMAIN AND INSTALLATION OF A NEW GAS FURNACE AND GAS HOT WATER HEATER AS PER PLANS.
X01130224-I1
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jafet Tavarez
6 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offIps Plumbing11/18/2024
BISOTISSUEDEmpower CES12/01/2019
BISOTISSUEDVenture Home Solar03/11/2019
1 project · most recent 03/18/2020
FiledStatusContractorScope
03/18/2020CompleteIsland Electric—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/04/2024Fire-Resistant Penetrations and JointsJafet Tavarezspecial
40 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account