| Owner | Filings | Most Recent |
|---|---|---|
| Manhattan Bible Church | 3 | 03/21/2026 |
| Radson Development | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 07/30/2024 | $15.8M | — | Manhattan Bible Church → 3816 NINTH AVENUE HOUSING DEVELOPMENT FUND CO INC | $791/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| Simon Jiang | 7 | 06/17/2026 |
| Always Fast Services | 1 | 03/24/2026 |
| Dibari Engineering | 4 | 08/29/2025 |
| Rigid Structural Design | 1 | 04/08/2025 |
| MSM Engineering Services | 1 | 02/28/2025 |
| Eskw/A | 4 | 01/24/2025 |
| Volume Space Consulting | 1 | 01/17/2025 |
| Syed Engineering | 1 | 03/17/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| W J Professional Expediting | 16 | 03/21/2026 |
| Commercial Capital USA | 2 | 03/21/2026 |
| Green Studio | 2 | 03/21/2026 |
| Rigid Structural Design | 2 | 03/21/2026 |
| BSGNY | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Topline NYC Contracting | Scaffold | 3 | 03/21/2026 |
| CS Bridge | Scaffold | 2 | 03/21/2026 |
| Nash Electric Services | Electrical | 1 | 03/22/2026 |
| J & G Construction Services | Scaffold | 1 | 04/09/2026 |
| Real Builders | Scaffold | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| American Construction Tes | 9731 | 2 | 06/11/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | J & G Construction Services | 10/20/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | J & G Construction Services | 04/02/2026 |
| DOB NOW | Construction Fence | Permit Issued | Real Builders | 03/18/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | CS Bridge | 05/15/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Topline NYC Contracting | 03/17/2021 |
| BIS | — | ISSUED | FRY Assciates Architecture | 09/06/2018 |
| BIS | PL | ISSUED | Precision Plumbing Services | 06/24/2016 |
| BIS | PL | ISSUED | Reyvin Plumbing & Heating | 11/20/2008 |
| BIS | — | ISSUED | Belair Design Group | 09/28/2007 |
| BIS | FP | ISSUED | Active Fire Extinguisher | 11/09/2006 |
| BIS | OT | ISSUED | Blue Mail Design Builders | 03/06/2000 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/29/2025 | — | — | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Ephoca SK92LS 7,800 BTU · Ptac ×181 __Junk__ ARNU243MAA4 27,300 BTU · Vrf Indoor ×4 ARUN024GSS4 25,454 BTU · Vrf Outdoor ×4 LSN120HSV5 13,600 BTU · Heat Pump Outdoor ×4 ARNU363MAA4 41,953 BTU · Vrf Indoor ×3 ARUN038GSS4 40,496 BTU · Vrf Outdoor ×3 ARNU483M3A4 56,000 BTU · Vrf Indoor ×2 ARUN048GSS4 50,856 BTU · Vrf Outdoor ×2 LSN240HSV3 27,600 BTU · Heat Pump Outdoor ×1 Heating Berko 2515NW 4,260 BTU · Electric Heater ×1 BKOC-2513W 2,558 BTU · Electric Heater ×1 CUH-93505 17,065 BTU · Electric Heater ×1 FRC-4024 10,235 BTU · Electric Heater ×1 HUH-524TA018 6,396 BTU · Electric Heater ×1 SRA1512DS 2,560 BTU · Electric Heater ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2026 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/29/2025 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/15/2026 | Permit Issued | Hivolts Electrical | 1 meters, 1 new_meters |
| 03/23/2026 | Permit Issued | Richard Neu | — |
| 10/24/2025 | Permit Issued | Mechanical Construction Systems | General Wiring |
| 03/30/2025 | Permit Issued | Nash Electric Services | — |
| 03/18/2021 | Permit Issued | Richard Neu | — |
| 04/08/2020 | Complete | E-J Electric Installation Co | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/29/2025 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2026 | Permit Issued | Real Builders | Fence |
| 03/24/2026 | Permit Issued | J & G Construction Services | Sidewalk Shed |
| 03/17/2021 | Permit Issued | Topline NYC Contracting | Sidewalk Shed |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/11/2026 | Sprinkler Systems | EDWIN HOPKINS | special |
| 03/09/2026 | Sprinkler Systems | — | special |
| 03/02/2026 | Sprinkler Systems | — | special |
| 08/27/2025 | Demolition | EDWIN HOPKINS | special |
| 08/27/2025 | Structural Stability – Alterations of existing Buildings | EDWIN HOPKINS | special |
| 03/31/2025 | Maintenance information | — | energy_progress |
| 03/31/2025 | Ventilation and air distribution system | — | energy_progress |
| 03/31/2025 | Duct leakage testing, insulation and design | — | energy_progress |
| 01/21/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 12/24/2024 | Energy Code Compliance Inspections | — | progress |
| 12/24/2024 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 12/24/2024 | HVAC-R and service water heating equipment | — | energy_progress |
| 12/24/2024 | HVAC-R and service water heating system controls | — | energy_progress |
| 12/24/2024 | Maintenance information | — | energy_progress |
| 12/24/2024 | Mechanical Systems | — | special |
| 12/24/2024 | Final | — | progress |
| 12/24/2024 | Energy Code Compliance Inspections | — | progress |
| 12/24/2024 | HVAC-R and service water heating equipment | — | energy_progress |
| 12/24/2024 | HVAC-R and service water heating system controls | — | energy_progress |
| 12/24/2024 | Shutoff dampers | — | energy_progress |
| 12/24/2024 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 12/24/2024 | Sprinkler Systems | — | special |
| 12/24/2024 | Standpipe Systems | — | special |
| 12/24/2024 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 12/24/2024 | Footing and Foundation | — | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| The Bridge | Residential | Floor 1 | Project M01402729 Project M01205977 Project M01155663 |