← Back
BuildNYC
Elevator apt, fireproof with stores
382 3RD AVENUE
MANHATTAN · Gramercy · BIN 1018180
💬 Discuss this project
1984Year Built
15Stories
D6Building Class
C2-8Zoning
30,800 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized2 Active Violations 1 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: Kalabi Realty Co · 2,962 sf lot · 10.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAbington Properties5p · 3 filings · 20 docs
Floor 1Abington Properties14p · 3 filings · 20 docs
CellarAbington Properties15p · 3 filings · 20 docs
Site & exteriorKLABI REALTY Co. LLC22p · 4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Abington Properties1904/09/2026
Kalabi Realty Co303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bayside Associates411/12/2025
Paul Perdek, Prof. Engineering108/06/2025
MSM Engineering Services203/17/2025
Always Fast Services102/21/2025
S Associates108/14/2024
Citiscape Consulting210/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J Building Consulting803/21/2026
Rigid Structural Design203/21/2026
Citiscape Consulting403/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AM&G Waterproofingspecialty_contractor203/21/2026
Andamio ScaffoldingScaffold204/09/2026
Intelogic ElectricElectrical103/21/2026
Citiscape DevelopmentGeneral Contractor107/08/2026
Kale ConstructionGeneral Contractor104/09/2026
AM&G WaterproofingScaffold104/09/2026
A & A Plumbing SystemsPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Safepipe PlumbingPlumbing107/08/2026
RPJ ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010411/12/2025
Urban Integrations7993103/20/2025
MJ Engineering & Design5546108/14/2024
S Architecture8913108/14/2024
Citiscape Consulting762210/18/2021
Building Lifecycle
All (142)Filed (12)Permit Issued (9)Signed Off (8)Facade (FISP) (16)Violation (35)Inspection (11)Objection (22)Special Inspection (29)
06/16/2026
Signed off — Alteration
Exterior repairs at Street Facing Facade and Courtyard Elevation including: lintel servicing, brick replacement, coping replacement, repointing and sealant replacement.
M01093694-I1
02/06/2026
Signed off — Alteration
PLUMBING WORK AT CELLAR AND 1ST FLOOR BEAUTY SALON OF EXISTING 15-STORY BUILDING. RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OF CERTIFICATE OF OCCUPANCY.
M01268532-I1
02/06/2026
Signed off — Alteration
PLUMBING WORK AT CELLAR AND 1ST FLOOR BEAUTY SALON OF EXISTING 15-STORY BUILDING. RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OF CERTIFICATE OF OCCUPANCY.
M01268532-S1
01/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/05/2026
Signed off — Alteration
M01183178-I1
12/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
12/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
12/21/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
12/16/2025
Signed off — Alteration
M01265935-I1
12/03/2025
Cycle 10 facade report signed — SAFE
12/01/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
11/19/2025
Special inspection requirement — Final
XIUCHENG LI
11/19/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
11/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
11/19/2025
Special inspection requirement — Maintenance information
XIUCHENG LI
11/19/2025
Special inspection requirement — Lighting controls
XIUCHENG LI
11/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
11/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
11/19/2025
Special inspection requirement — Interior lighting power
XIUCHENG LI
11/19/2025
Special inspection requirement — Mechanical Systems
XIUCHENG LI
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
11/17/2025
Violation issued (HPD, closed)
I
11/12/2025
Filed — Alteration
PLUMBING WORK AT CELLAR AND 1ST FLOOR BEAUTY SALON OF EXISTING 15-STORY BUILDING. RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OF CERTIFICATE OF OCCUPANCY.
M01268532-P2
11/12/2025
Filed — Alteration
PLUMBING WORK AT CELLAR AND 1ST FLOOR BEAUTY SALON OF EXISTING 15-STORY BUILDING. RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OF CERTIFICATE OF OCCUPANCY.
M01268532-P1
11/03/2025
Violation issued (ECB, closed)
Construction
10/30/2025
Cycle 10 facade report submitted
10/29/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01183179-I1
10/29/2025
Cycle 10 facade inspection completed
10/09/2025
Signed off — Alteration
M01194928-I1
10/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/22/2025
Permit issued — General Construction
M01268532-I1-GC-CX
09/19/2025
Permit issued — Plumbing
M01268532-S1-PL
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/08/2025
Objection raised — Scope
09/08/2025
Objection raised — Other
09/08/2025
Objection raised — Cost
09/08/2025
Objection raised — Admin
08/29/2025
Filed — Alteration
PLUMBING WORK AT CELLAR AND 1ST FLOOR BEAUTY SALON OF EXISTING 15-STORY BUILDING. RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OF CERTIFICATE OF OCCUPANCY.
M01268532-I1
08/29/2025
Filed — Alteration
PLUMBING WORK AT CELLAR AND 1ST FLOOR BEAUTY SALON OF EXISTING 15-STORY BUILDING. RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OF CERTIFICATE OF OCCUPANCY.
M01268532-S1
08/06/2025
Filed — Alteration
M01265935-I1
08/06/2025
Permit issued — Protection and Mechanical Methods
M01265935-I1-PMM
08/06/2025
Cycle 10 facade report submitted
08/06/2025
Cycle 10 facade inspection completed
08/06/2025
Cycle 10 facade report signed — UNSAFE
06/05/2025
Permit issued — General Construction
M01093694-I1-GC
04/24/2025
Violation issued (ECB, open)
Local Law
04/09/2025
Permit issued — Suspended Scaffold
M01194928-I1-SC
03/20/2025
Filed — Alteration
M01194928-I1
03/20/2025
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
03/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
03/20/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
03/17/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01183179-P1
03/02/2025
Objection resolved — Addressed
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKale Construction09/22/2025
DOB NOWPlumbingSigned-offBellerose Plumbing & Heating09/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offAM&G Waterproofing08/06/2025
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing06/05/2025
DOB NOWSuspended ScaffoldSigned-offAM&G Waterproofing04/09/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding02/24/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding02/21/2025
DOB NOWPlumbingSigned-offA & A Plumbing Systems12/02/2021
DOB NOWGeneral ConstructionPermit IssuedCitiscape Development11/28/2021
BISPLISSUEDNational Mechanical Services Plumbing02/02/2015
BISOTISSUEDNational Mechanical Services07/31/2014
BISOTISSUEDNational Mechanical Services10/04/2013
BISPLISSUEDNational Mechanical Services Plumbing10/04/2013
BISEQISSUEDB H & B Construction03/06/2013
BISEQISSUEDB H & B Construction02/01/2013
BISEQISSUEDB H & B Construction09/09/2011
BISEQISSUEDV.P. Construction11/24/2006
BISOTISSUEDV.P. Construction11/24/2006
BISEQISSUEDRockledge Scaffold11/01/2005
3 projects · most recent 09/19/2025
General Wiring
FiledStatusContractorScope
09/19/2025Permit IssuedIntelogic ElectricGeneral Wiring
02/21/2025CompleteBorowide Elect'l Contractors—
03/21/2022CompleteArc Power Electrical ContsGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/26/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/19/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
04/06/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/21/2025Tenant Protection Plan ComplianceXIUCHENG LIspecial
12/21/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
12/21/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
11/19/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
11/19/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
11/19/2025FinalXIUCHENG LIprogress
11/19/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
11/19/2025HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
11/19/2025Maintenance informationXIUCHENG LIenergy_progress
11/19/2025Lighting controlsXIUCHENG LIenergy_progress
11/19/2025HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
11/19/2025HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
11/19/2025Interior lighting powerXIUCHENG LIenergy_progress
11/19/2025Mechanical SystemsXIUCHENG LIspecial
11/19/2025Tenant Protection Plan ComplianceXIUCHENG LIspecial
03/20/2025Post-installed AnchorsDANNY TRUJILLOspecial
03/20/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
03/20/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
10/18/2021HVAC-R and service water heating equipmentJoe Liebermanenergy_progress
10/18/2021Fire-Resistant Penetrations and JointsJoe Liebermanspecial
10/18/2021Energy Code Compliance InspectionsJoe Liebermanprogress
10/18/2021Maintenance informationJoe Liebermanenergy_progress
10/18/2021HVAC-R and service water heating system controlsJoe Liebermanenergy_progress
10/18/2021HVAC-R and service water piping design and insulationJoe Liebermanenergy_progress
10/06/2021Fire-Resistant Penetrations and JointsJoe Liebermanspecial
Latest 25 of 29.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/03/2026M00604711-I1Request digital key ↗
08/24/2026M01183178-I1Request digital key ↗
08/24/2026M01183179-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
10/08/2013121610060Open ↗
10/08/2013121610060Open ↗
10/08/2013121610060Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/17/2020120818687Open ↗
07/31/2020104274330Open ↗
07/17/2020104274330Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature12
10/05/2026M01268532-S1Open ↗
08/28/2026M00604711-I1Open ↗
08/28/2026M00604711-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00604694-I1Open ↗
08/24/2026M01183179-I1Open ↗
08/22/2026M01265935-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/05/2026M01268532-S1Open ↗
08/28/2026M00604711-I1Open ↗
08/25/2026M01194928-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/24/2015121610060Open ↗
04/24/2015121610060Open ↗
05/09/2013121610060Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/22/2011120818687Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/22/2011120818687Open ↗
▸Trade Schedules & Equipment4
▸BISBOILERS - SUPPORTING DOCUMENTATION1
03/31/2015121610060Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
03/31/2015121610060Open ↗
▸BISSCHEDULE B - PLUMBING1
05/09/2013121610060Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/09/2013121610060Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/09/2013121610060Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026M01268532-S1Open ↗
08/20/2026M01268532-I1Open ↗
08/20/2026M01268532-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/09/2013121610060Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00604694-I1Open ↗
08/13/2026M00604711-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/24/2015121610060Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/09/2013121610060Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/17/2020104274330Open ↗
07/17/2020104274330Open ↗
07/17/2020104274330Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/09/2013121610060Open ↗
09/22/2011120818687Open ↗
▸BISSHED LETTER1
03/11/2013120818687Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/24/2015121610060Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/24/2015121610060Open ↗
05/09/2013121610060Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
05/09/2013121610060Open ↗
▸BISeFiling Job Application Cover Sheet1
09/22/2011120818687Open ↗
▸BISADDITIONAL INFORMATION1
10/07/2014121610060Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/17/2020104274330Open ↗
▸BISRESTRICTION: DEED1
08/18/2020120818687Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01194928-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01194928-I1Open ↗