City residence, one family
382 SACKETT STREET
💬 Discuss this project
1920Year Built
3Stories
A4Building Class
R6BZoning
3,600 sfGross Floor Area
1Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
City residence, one family · 1,800 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof33p · 2 filings · 19 docs
Floor 352p · 5 filings · 20 docs
Floor 255p · 5 filings · 20 docs
Floor 152p · 5 filings · 20 docs
Cellar58p · 5 filings · 20 docs
Basement13p · 1 filing · 20 docs
Sub-Basement40p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2022$3.3M—Private party → Private party$908/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NAVA702/05/2025
DAGHER ENGINEERING PLLC404/19/2024
STRATFORD ENGINEERING104/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICK FILING OF NY INC1203/21/2026
QUICK FILING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RED OAK RENOVATIONS CORPGeneral Contractor803/21/2026
ORBIT SPRINKLER CORPFire Protection207/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRATFORD ENGINEERING997402/05/2025
DAGHER ENGINEERING2441404/19/2024
Building Lifecycle
All (103)Filed (12)Permit Issued (8)Signed Off (5)Violation (11)Inspection (7)Objection (30)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
02/10/2025
Signed off — Alteration CO
CONVERT EXISTING 3 FAMILY BUILDING IN TO 1 FAMILY. INTERIOR RENOVATIONS WITH FINISHES AS PER PLANS. EXTERIOR WORK AT REAR. ELECTRICAL INCLUDED.
B00687824-I1
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xianzhang Chen
02/06/2025
Special inspection requirement — Fenestration air leakage
DAVID RUFF
02/06/2025
Special inspection requirement — Lighting in dwelling units
DAVID RUFF
02/06/2025
Special inspection requirement — Fenestration areas
DAVID RUFF
02/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DAVID RUFF
02/06/2025
Special inspection requirement — Insulation placement and R values
DAVID RUFF
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
DAVID RUFF
02/05/2025
Filed — Alteration CO
CONVERT EXISTING 3 FAMILY BUILDING IN TO 1 FAMILY. INTERIOR RENOVATIONS WITH FINISHES AS PER PLANS. EXTERIOR WORK AT REAR. ELECTRICAL INCLUDED.
B00687824-P2
02/04/2025
Special inspection requirement — Fenestration areas
DAVID RUFF
02/04/2025
Special inspection requirement — Lighting in dwelling units
DAVID RUFF
02/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DAVID RUFF
02/04/2025
Special inspection requirement — Insulation placement and R values
DAVID RUFF
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xianzhang Chen
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
DAVID RUFF
02/04/2025
Special inspection requirement — Fenestration air leakage
DAVID RUFF
11/29/2024
Violation issued (HPD, open)
I
05/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/16/2024
Signed off — Alteration
B00696589-I1
05/10/2024
Signed off — Alteration
sprinkler work in cel,, bas,001,002,003 fl as per plans submitted. In conjunction with application#B00687824-I1.No change in Use, Occupancy or Egress.
B00753805-I1
05/10/2024
Permit issued — Mechanical Systems
B00696589-I1-MS
05/08/2024
Signed off — Alteration
new plumbing work in conjunction of alt1#B00687824-I1
B00716990-I1
05/03/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
DAVID RUFF
05/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DAVID RUFF
05/01/2024
Special inspection requirement — Maintenance information
DAVID RUFF
05/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
DAVID RUFF
05/01/2024
Special inspection requirement — Mechanical Systems
Josephine Zurica
05/01/2024
Special inspection requirement — Final
Josephine Zurica
04/29/2024
Permit issued — Sprinklers
B00753805-I1-EW-SP
04/19/2024
Filed — Alteration
B00696589-P1
04/19/2024
Objection resolved — Addressed
04/19/2024
Objection resolved — Addressed
04/19/2024
Objection resolved — Addressed
04/19/2024
Objection resolved — Addressed
04/17/2024
Objection resolved — Addressed
04/11/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
11/03/2023
Objection raised — Admin
10/31/2023
Filed — Alteration
sprinkler work in cel,, bas,001,002,003 fl as per plans submitted. In conjunction with application#B00687824-I1.No change in Use, Occupancy or Egress.
B00753805-P1
10/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Josephine Zurica
10/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Josephine Zurica
10/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Josephine Zurica
10/16/2023
Special inspection requirement — Maintenance information
Josephine Zurica
10/16/2023
Special inspection requirement — Sprinkler Systems
Josephine Zurica
10/16/2023
Special inspection requirement — Mechanical Systems
Josephine Zurica
10/16/2023
Special inspection requirement — Final
Josephine Zurica
08/09/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/03/2023
Filed — Alteration
new plumbing work in conjunction of alt1#B00687824-I1
B00716990-P3
07/31/2023
Objection raised — Fire_Protection
07/31/2023
Objection raised — Other
07/31/2023
Objection raised — Other
07/31/2023
Objection raised — Other
07/24/2023
Filed — Alteration CO
CONVERT EXISTING 3 FAMILY BUILDING IN TO 1 FAMILY. INTERIOR RENOVATIONS WITH FINISHES AS PER PLANS. EXTERIOR WORK AT REAR. ELECTRICAL INCLUDED.
B00687824-P1
07/10/2023
Permit issued — Plumbing
B00716990-I1-PL
07/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DAVID RUFF
07/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xianzhang Chen
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRED OAK RENOVATIONS CORP05/10/2024
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP04/29/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC07/10/2023
DOB NOWFoundationSigned-offRED OAK RENOVATIONS CORP04/19/2023
DOB NOWGeneral ConstructionPermit IssuedRED OAK RENOVATIONS CORP02/22/2023
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP11/23/2022
DOB NOWGeneral ConstructionPermit IssuedRED OAK RENOVATIONS CORP07/06/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/28/2022
1 project · most recent 08/01/2022
General Wiring
FiledStatusContractorScope
08/01/2022CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/03/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
02/06/2025Fire-Resistant Penetrations and JointsXianzhang Chenspecial
02/06/2025Fenestration air leakageDAVID RUFFenergy_progress
02/06/2025Lighting in dwelling unitsDAVID RUFFenergy_progress
02/06/2025Fenestration areasDAVID RUFFenergy_progress
02/06/2025Fenestration and door U-factor and product ratingsDAVID RUFFenergy_progress
02/06/2025Insulation placement and R valuesDAVID RUFFenergy_progress
02/06/2025Energy Code Compliance InspectionsDAVID RUFFprogress
02/04/2025Fenestration areasDAVID RUFFenergy_progress
02/04/2025Lighting in dwelling unitsDAVID RUFFenergy_progress
02/04/2025Fenestration and door U-factor and product ratingsDAVID RUFFenergy_progress
02/04/2025Insulation placement and R valuesDAVID RUFFenergy_progress
02/04/2025Fire-Resistant Penetrations and JointsXianzhang Chenspecial
02/04/2025Energy Code Compliance InspectionsDAVID RUFFprogress
02/04/2025Fenestration air leakageDAVID RUFFenergy_progress
05/01/2024HVAC-R and service water heating system controlsDAVID RUFFenergy_progress
05/01/2024HVAC-R and service water piping design and insulationDAVID RUFFenergy_progress
05/01/2024Maintenance informationDAVID RUFFenergy_progress
05/01/2024HVAC-R and service water heating equipmentDAVID RUFFenergy_progress
05/01/2024Mechanical SystemsJosephine Zuricaspecial
05/01/2024FinalJosephine Zuricaprogress
10/16/2023HVAC-R and service water heating system controlsJosephine Zuricaenergy_progress
10/16/2023HVAC-R and service water heating equipmentJosephine Zuricaenergy_progress
10/16/2023HVAC-R and service water piping design and insulationJosephine Zuricaenergy_progress
10/16/2023Maintenance informationJosephine Zuricaenergy_progress
10/16/2023Sprinkler SystemsJosephine Zuricaspecial
Latest 25 of 45.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/30/2026B00696589-P1Request digital key ↗
08/30/2026B00696589-I1Request digital key ↗
08/30/2026B00696967-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00687824-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026B00687824-I1Open ↗
09/23/2026B00687824-I1Open ↗
09/02/2026B00687824-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/30/2026B00696589-P1Open ↗
08/30/2026B00696589-I1Open ↗
08/30/2026B00716990-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B00687824-I1Open ↗
09/06/2026B00753805-P1Open ↗
09/02/2026B00687824-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026B00687824-I1Open ↗
08/13/2026B00687824-P1Open ↗
08/13/2026B00687824-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00687824-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00687824-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00687824-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/30/2026B00696589-I1Open ↗
08/30/2026B00716990-I1Open ↗
08/29/2026B00753805-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/30/2026B00696589-I1Open ↗
08/13/2026B00687824-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/13/2026B00687824-P2Open ↗
08/13/2026B00687824-P1Open ↗
08/13/2026B00687824-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00687824-I1Open ↗