← Back
BuildNYC
Factory, industrial, semi-fireproof
3825 54TH STREET
QUEENS · Woodside · BIN 4027615
💬 Discuss this project
1952Year Built
1Stories
F4Building Class
M1-1Zoning
11,187 sfGross Floor Area
1Units
0 Active Violations
Factory, industrial, semi-fireproof · Owner of record: JTJ Capital · 11,250 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRemoved gas service, meter, piping, and boiler1p · 1 filing · 6 docs
CellarRemoved gas service, meter, piping, and boiler5p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JTJ Capital403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stracar Engineering205/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stracar Engineering P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arista Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
All (26)Filed (2)Permit Issued (1)Signed Off (1)Violation (21)Inspection (1)
12/11/2024
Signed off — Alteration
FILING FOR REMOVED GAS SERVICE, GAS METER, GAS PIPING, AND GAS BOILER, SUPERSEDED BY DOB APPLICATION #410063504.
Q00845584-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/25/2023
Filed — Alteration
FILING FOR REMOVED GAS SERVICE, GAS METER, GAS PIPING, AND GAS BOILER, SUPERSEDED BY DOB APPLICATION #410063504.
Q00845584-P1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/14/2023
Permit issued — Plumbing
Q00845584-I1-PL
03/29/2023
Filed — Alteration
FILING FOR REMOVED GAS SERVICE, GAS METER, GAS PIPING, AND GAS BOILER, SUPERSEDED BY DOB APPLICATION #410063504.
Q00845584-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/1991
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offArista Plumbing & Heating04/14/2023
BISPLISSUEDArista Plumbing & Heating04/18/2024
BISPLISSUEDMaccarone Plumbing05/27/2009
BISPLISSUEDMaccarone Plumbing03/18/2008
BISMHISSUEDClover Mechanical02/21/2008
BISBLISSUEDSpeedway Plumbing12/18/1998
BISPLISSUEDSpeedway Plumbing12/18/1998
BISMHISSUEDRJL Machine05/24/1991
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q00845584-P1Request digital key ↗
08/25/2026Q00845584-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
11/17/2023410063504Open ↗
10/11/2023410063504Open ↗
10/06/2023410063504Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
06/30/2025410063504Open ↗
05/27/2009410063504Open ↗
03/18/2008410063504Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q00845584-P1Open ↗
08/25/2026Q00845584-I1Open ↗
▸BISPC FULL REPORT1
02/12/2008410063504Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/12/2008410063504Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/12/2008410063504Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/12/2008410063504Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/31/2025410063504Open ↗
07/07/2025410063504Open ↗
05/21/2025410063504Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
07/31/2025410063504Open ↗
05/21/2025410063504Open ↗
▸BISSCHEDULE B - PLUMBING1
09/27/2023410063504Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026Q00845584-P1Open ↗
08/25/2026Q00845584-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/12/2008410063504Open ↗
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
12/16/2024410063504Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/08/2025410063504Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/07/2008410063504Open ↗
▸BISSUPERSEDING LETTER1
06/30/2025410063504Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
03/18/2008410063504Open ↗
02/21/2008410063504Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/14/2025410063504Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
07/14/2025410063504Open ↗
▸Other Documents1
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
12/16/2024410063504Open ↗