← Back
BuildNYC
Elevator apt, semi-fireproof without stores
3831 CARPENTER AVENUE
BRONX · BIN 2057558
💬 Discuss this project
2022Year Built
6Stories
D1Building Class
R7-1Zoning
16,784 sfGross Floor Area
30Units
Rent Stabilized0 Active Violations
Elevator apt, semi-fireproof without stores · Owner of record: 3829 Carpenter Ave · 5,735 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofKgcj Development CORP34p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 8 docs
Floor 6Kgcj Development CORP32p · 1 filing · 20 docs
Floor 5Kgcj Development CORP32p · 1 filing · 20 docs
Floor 4Kgcj Development CORP38p · 1 filing · 20 docs
Floor 3Kgcj Development CORP46p · 2 filings · 20 docs
Floor 2Kgcj Development CORP47p · 2 filings · 20 docs
Floor 1Kgcj Development CORP60p · 4 filings · 20 docs
CellarKgcj Development CORP31p · 1 filing · 20 docs
Site & exteriorKgcj Development CORP26p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KGCJ Development5607/08/2026
3829 Carpenter Ave703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Node Architecture, Engineering, Cons1408/11/2023
Asr Engineering108/29/2022
Syed Engineering102/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Node Engineering Consulting2603/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Line ConstructionGeneral Contractor2207/08/2026
New Line ConstructionScaffold603/21/2026
Dennison ElectricGeneral Contractor503/22/2026
Kaj NY ConstructionScaffold107/08/2026
H20 LLCScaffold107/08/2026
ZKW EnterprisesScaffold107/08/2026
Go Pro Fire ProtectionFire Protection107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica1795708/11/2023
Node Architecture, Engineering6799808/11/2023
Pinto Studio6366107/14/2022
Building Lifecycle
04/30/2025
Elevator Category 1 inspection report filed
05/21/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X00691380-I1-GC
01/10/2024
Signed off — New Building
Curb Cut filed in Conjunction with NB Application #X00691380-I1
X00691380-S5
12/06/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00675323-I1
12/05/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X07993963-I1
90 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNew Line Construction11/13/2023
DOB NOWMechanical SystemsSigned-offNew Line Construction11/13/2023
DOB NOWGeneral ConstructionPermit IssuedNew Line Construction05/30/2023
DOB NOWGeneral ConstructionPermit IssuedNew Line Construction05/30/2023
DOB NOWGeneral ConstructionPermit IssuedNew Line Construction01/27/2023
DOB NOWCurb CutSigned-offNew Line Construction12/29/2022
DOB NOWMechanical SystemsSigned-offNew Line Construction12/20/2022
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing12/06/2022
DOB NOWSprinklersSigned-offGo Pro Fire Protection12/02/2022
DOB NOWStructuralSigned-offNew Line Construction11/02/2022
DOB NOWProtection and Mechanical MethodsSigned-offNew Line Construction11/02/2022
DOB NOWConstruction FenceSigned-offNew Line Construction11/02/2022
DOB NOWGeneral ConstructionPermit IssuedNew Line Construction09/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offNew Line Construction08/31/2022
DOB NOWSidewalk ShedSigned-offZKW Enterprises08/29/2022
DOB NOWStructuralSigned-offNew Line Construction08/08/2022
DOB NOWEarth WorkPermit IssuedNew Line Construction05/18/2022
DOB NOWSupport of ExcavationSigned-offNew Line Construction05/16/2022
DOB NOWSidewalk ShedSigned-offKaj NY Construction02/08/2022
DOB NOWConstruction FenceSigned-offH20 LLC12/09/2021
BIS—ISSUEDVinale Management & Consulting01/24/2022
1 project · most recent 08/11/2023
Air Conditioning Systems
FiledStatusContractorScope
08/11/2023Permit IssuedNew Line ConstructionAir Conditioning Systems
1 project · most recent 08/11/2023
Sprinkler System
FiledStatusContractorScope
08/11/2023Signed-offGo Pro Fire ProtectionSprinkler System
1 project · most recent 08/11/2023
Storm Water/Sanitary
FiledStatusContractorScope
08/11/2023Signed-offInfiniti Esc PlumbingStorm, Water/Sanitary
3 projects · most recent 12/09/2023
General Wiring
FiledStatusContractorScope
12/09/2023CompleteDennison ElectricGeneral Wiring
02/07/2023CompleteJam Electrical—
11/22/2022CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/13/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/09/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
08/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/17/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/09/2023Pass-Final House ConnectionPassView ↗
12/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/13/2023Fire-Resistant Penetrations and JointsRadomir Delicspecial
08/13/2023Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
08/11/2023HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023FinalRadomir Delicprogress
08/11/2023Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
08/11/2023Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
08/11/2023FinalRadomir Delicprogress
08/11/2023Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
08/11/2023Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
08/10/2023Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
08/10/2023Fire-Resistant Penetrations and JointsRadomir Delicspecial
11/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
11/04/2022Fire-Resistant Penetrations and JointsRadomir Delicspecial
09/12/2022Exterior Insulation and Finish Systems (EIFS)Radomir Delicspecial
08/23/2022Protection of exposed foundation insulationRadomir Delicenergy_progress
08/23/2022Maintenance informationRadomir Delicenergy_progress
08/23/2022MeteringRadomir Delicenergy_progress
07/13/2022FinalRadomir Delicprogress
Latest 25 of 49.
123 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account