← Back
One family attached or semi-detached
384 5 STREET
BROOKLYN · BIN 3021414
💬 Discuss this project
1901Year Built
2Stories
A5Building Class
R6BZoning
2,473 sfGross Floor Area
1Units
One family attached or semi-detached · 1,567 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof28p · 2 filings · 20 docs
Floor 229p · 4 filings · 20 docs
Floor 125p · 2 filings · 20 docs
Cellar32p · 3 filings · 20 docs
Basement23p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/03/2021$2.2M—— → —$900/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOWERBIRD ARCHITECT, PLLC606/08/2023
GASBARRO STRUCTURAL ENGINEERING306/15/2022
ANTHONY GENNARO, PE205/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BMB BUILDER INCGeneral Contractor507/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR ARCHITECT P.C.1171706/08/2023
GASBARRO STRUCTURAL ENGIN5919306/15/2022
NORMAN C. LOK818205/27/2022
Building Lifecycle
All (125)Filed (11)Permit Issued (7)Signed Off (5)Inspection (8)Objection (64)Special Inspection (30)
10/16/2023
Signed off — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN #B00576901-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00588643-I1
10/03/2023
Signed off — Alteration
Propose sprinkler scope of work filed in conjunction with Alt-CO # B00576901-I1.
B00588775-I1
08/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/10/2023
Signed off — Alteration
Propose structural scope of work with rear horizontal extension on basement and 1st floor, including partial demo and temporary shoring work filed in conjunction with Alt-CO # B00576901-I1.
B00588763-I1
08/10/2023
Signed off — Alteration
Propose Foundation scope of work to convert existing two-family to one-family house with horizontal enlargement filed in conjunction with Alt-CO # B00576901-I1.
B00588772-I1
08/07/2023
Signed off — Alteration
Propose 8' tall temporary construction fence in rear yard with no gates or openings filed in conjunction with Alt-CO # B00576901-I1
B00652895-I1
06/13/2023
Objection raised — Scope
06/13/2023
Objection resolved — Addressed
06/13/2023
Objection raised — Scope
06/13/2023
Objection resolved — Addressed
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
06/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
06/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ANGEL ROJAS
06/08/2023
Filed — Alteration CO
PROPOSE TO CONVERT EXISTING 2-FAMILY TO 1-FAMILY HOUSE WITH GENERAL CONSTRUCTION & MECHANICAL WORKS ON ALL FLS, REAR HORIZONTAL ENLARGEMENT AT BAS & 1ST FL AS SHOWN ON PLANS. ALL OTHER RELATED WORK TYPES FILED UNDER DOB NOW SEPARATELY. OBTAIN NEW C OF O.
B00576901-P3
06/08/2023
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN #B00576901-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00588643-P1
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
06/01/2023
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
06/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
06/01/2023
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
06/01/2023
Special inspection requirement — Final
ANGEL ROJAS
06/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
06/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
ANGEL ROJAS
06/01/2023
Special inspection requirement — Insulation placement and R values
ANGEL ROJAS
06/01/2023
Special inspection requirement — Air barrier - visual inspection
ANGEL ROJAS
06/01/2023
Special inspection requirement — Fenestration areas
ANGEL ROJAS
06/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
ANGEL ROJAS
06/01/2023
Special inspection requirement — Shutoff dampers
ANGEL ROJAS
06/01/2023
Special inspection requirement — Interior lighting power
ANGEL ROJAS
06/01/2023
Special inspection requirement — Fenestration air leakage
ANGEL ROJAS
06/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ANGEL ROJAS
04/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/05/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/03/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/24/2023
Permit issued — Mechanical Systems
B00576901-I1-GC-CX
08/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2022
Objection raised — Admin
07/18/2022
Objection resolved — Addressed
07/10/2022
Objection resolved — Addressed
06/23/2022
Permit issued — Sprinklers
B00588775-I1-EW-SP
06/22/2022
Objection raised — Inspections
06/22/2022
Objection raised — Scope
06/22/2022
Objection resolved — Addressed
06/15/2022
Filed — Alteration
Propose structural scope of work with rear horizontal extension on basement and 1st floor, including partial demo and temporary shoring work filed in conjunction with Alt-CO # B00576901-I1.
B00588763-P1
06/09/2022
Special inspection requirement — Masonry
Thomas Gasbarro
06/09/2022
Special inspection requirement — Concrete - Cast-In-Place
Thomas Gasbarro
06/09/2022
Special inspection requirement — Post-installed Anchors
Thomas Gasbarro
06/09/2022
Special inspection requirement — Structural Cold-Formed Steel
Thomas Gasbarro
06/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Gasbarro
06/09/2022
Special inspection requirement — Structural Steel - Details
Thomas Gasbarro
06/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Gasbarro
06/09/2022
Special inspection requirement — Final
Thomas Gasbarro
05/27/2022
Filed — Alteration
Propose sprinkler scope of work filed in conjunction with Alt-CO # B00576901-I1.
B00588775-P1
05/23/2022
Permit issued — Plumbing
B00588643-I1-PL
05/10/2022
Filed — Alteration CO
PROPOSE TO CONVERT EXISTING 2-FAMILY TO 1-FAMILY HOUSE WITH GENERAL CONSTRUCTION & MECHANICAL WORKS ON ALL FLS, REAR HORIZONTAL ENLARGEMENT AT BAS & 1ST FL AS SHOWN ON PLANS. ALL OTHER RELATED WORK TYPES FILED UNDER DOB NOW SEPARATELY. OBTAIN NEW C OF O.
B00576901-P1
05/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
05/04/2022
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
05/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBMB BUILDER INC03/24/2023
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN06/23/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/23/2022
DOB NOWGeneral ConstructionPermit IssuedBMB BUILDER INC02/14/2022
DOB NOWStructuralSigned-offBMB BUILDER INC02/14/2022
DOB NOWConstruction FenceSigned-offBMB BUILDER INC02/14/2022
DOB NOWFoundationSigned-offBMB BUILDER INC02/14/2022
1 project · most recent 06/08/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2023Permit IssuedBMB BUILDER INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-5C42NA3 42,000 BTU · Condensing Unit ×1
MXZ5C42NA3 42,000 BTU · Condensing Unit ×1
MXZ5C42NA2-U1 42,000 BTU · Condensing Unit ×1
PUZA36NKA7 36,000 BTU · Condensing Unit ×1
1 project · most recent 08/29/2022
General Wiring
FiledStatusContractorScope
08/29/2022CompleteAERO ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
06/12/2023Energy Code Compliance InspectionsANGEL ROJASprogress
06/12/2023Fire-Resistant Penetrations and JointsANGEL ROJASspecial
06/12/2023HVAC-R and service water piping design and insulationANGEL ROJASenergy_progress
06/01/2023Fire-Resistant Penetrations and JointsANGEL ROJASspecial
06/01/2023Mechanical SystemsANGEL ROJASspecial
06/01/2023Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
06/01/2023Energy Code Compliance InspectionsANGEL ROJASprogress
06/01/2023FinalANGEL ROJASprogress
06/01/2023Fire-Resistance Rated ConstructionANGEL ROJASprogress
06/01/2023HVAC-R and service water heating system controlsANGEL ROJASenergy_progress
06/01/2023Insulation placement and R valuesANGEL ROJASenergy_progress
06/01/2023Air barrier - visual inspectionANGEL ROJASenergy_progress
06/01/2023Fenestration areasANGEL ROJASenergy_progress
06/01/2023HVAC-R and service water heating equipmentANGEL ROJASenergy_progress
06/01/2023Shutoff dampersANGEL ROJASenergy_progress
06/01/2023Interior lighting powerANGEL ROJASenergy_progress
06/01/2023Fenestration air leakageANGEL ROJASenergy_progress
06/01/2023Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
06/09/2022MasonryThomas Gasbarrospecial
06/09/2022Concrete - Cast-In-PlaceThomas Gasbarrospecial
06/09/2022Post-installed AnchorsThomas Gasbarrospecial
06/09/2022Structural Cold-Formed SteelThomas Gasbarrospecial
06/09/2022Structural Stability – Alterations of existing buildingsThomas Gasbarrospecial
06/09/2022Structural Steel - DetailsThomas Gasbarrospecial
06/09/2022Structural Stability – Alterations of existing buildingsThomas Gasbarrospecial
Latest 25 of 51.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026B00588643-P1Request digital key ↗
08/31/2026B00652895-I1Request digital key ↗
08/29/2026B00588775-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00576901-P1Open ↗
08/13/2026B00576901-P3Open ↗
08/13/2026B00576901-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00576901-I1Open ↗
08/13/2026B00576901-P3Open ↗
08/13/2026B00576901-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00576901-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature30
09/29/2026B00588772-I1Open ↗
09/29/2026B00588772-I1Open ↗
09/29/2026B00588772-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/29/2026B00588772-I1Open ↗
09/29/2026B00588772-I1Open ↗
09/29/2026B00588772-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00652895-I1Open ↗
08/13/2026B00588775-P1Open ↗
08/13/2026B00588643-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B00576901-P3Open ↗
08/13/2026B00576901-P1Open ↗
08/13/2026B00576901-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00576901-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026B00588775-I1Open ↗
08/13/2026B00588763-I1Open ↗
08/13/2026B00588772-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWACP5/20/21 or V51
08/13/2026B00588643-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00588643-I1Open ↗
08/13/2026B00576901-I1Open ↗
▸Other Documents11
▸DOB NOWPlot Diagram4
08/13/2026B00576901-P3Open ↗
08/13/2026B00576901-P1Open ↗
08/13/2026B00588772-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00576901-P3Open ↗
08/13/2026B00576901-P1Open ↗
08/13/2026B00576901-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00576901-P3Open ↗
08/13/2026B00576901-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00576901-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00576901-I1Open ↗