Office with commercial, 1-6 stories
384 BROADWAY
MANHATTAN · BIN 1002318
💬 Discuss this project
1882Year Built
6Stories
O5Building Class
C6-2AZoning
43,300 sfGross Floor Area
7Units
LL97 Covered6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: FLORENTINE REALTY CORP · 7,604 sf lot · 5.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivilGeneral
Roof3p · 2 filings · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 111p · 2 filings · 20 docs
Mezzanine9p · 1 filing · 20 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OCTET REALTY2307/08/2026
T-MOBILE307/08/2026
TOPLINE NYC CONTRACTING403/22/2026
FLORENTINE REALTY CORP103/22/2026
384 BROADWAY REALTY CO103/22/2026
KAY BEE EXPORT CO INC203/22/2026
P.J.B. CONTRACTING INC103/21/2026
VOICESTREAM103/21/2026
EXPERT ENTERPRISES603/21/2026
PJB CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
JAM CONSULTANTS, INC.2403/21/2026
A1 EXPEDITING SERVICE403/21/2026
GC1 EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW CLASSIC RESTORATION LGeneral Contractor907/08/2026
YARKS NYC INCGeneral Contractor607/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor603/21/2026
Z J CONTRACTING & RESTORATIONGeneral Contractor303/21/2026
MURPHY, MICHAELElectrical103/21/2026
O'KANE JOHNElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
PLUMBING WORKS CORPFire Protection107/08/2026
HI-TECH C.P.M. CORPGeneral Contractor107/08/2026
TRISTRUX LLCGeneral Contractor107/08/2026
AMER, SALAHElectrical103/21/2026
WF PLUMBING AND HEATING LPlumbing107/08/2026
BIRNBAUM, ALANElectrical103/21/2026
JOHN O'KANEElectrical103/21/2026
MICHAEL MURPHYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JON LIBASCI3068803/20/2025
MEP INSPECTIONS, INC1102203/20/2025
CATALPA SPECIAL INSPECTIO2004208/07/2024
DOMINICK R. PILLA1300101/25/2024
KM CONSULTING NY, INC.5305108/31/2023
JOEL PHAGOO ,PE, PLLC2416109/23/2021
Building Lifecycle
All (174)Filed (17)Permit Issued (16)Signed Off (9)Violation (60)Inspection (7)Objection (40)Special Inspection (25)
06/27/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00594281-I1
06/27/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00594264-I1
04/16/2025
Signed off — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-S2
04/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
03/28/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
03/20/2025
Filed — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-P6
03/20/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
02/20/2025
Signed off — Alteration
Carrier: T-Mobile. Modification of an existing antenna site. Relocate (1) existing sector of antennas (consisting of 4 antennas) from rooftop to the existing water tank. Replace (3) antennas. Modifying existing stealth enclosure on the roof. All work is in conformance with TPPN #5/98. No change in use, egress or occupancy.
M00134833-I1
10/29/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE.
M00967868-I1
10/29/2024
Signed off — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-S4
09/27/2024
Signed off — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-S1
09/18/2024
Signed off — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-I1
09/17/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/16/2024
Special inspection requirement — Mechanical Systems
ERIC BERLENT
08/16/2024
Special inspection requirement — Final
ERIC BERLENT
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
08/12/2024
Objection raised — Admin
08/12/2024
Objection resolved — Addressed
08/07/2024
Filed — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-P5
08/01/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/24/2024
Special inspection requirement — Mechanical Systems
ERIC BERLENT
07/24/2024
Special inspection requirement — Final
ERIC BERLENT
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
07/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
jon libasci
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
07/11/2024
Objection resolved — Addressed
07/08/2024
Signed off — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-S3
03/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/29/2024
Objection raised — Other
02/29/2024
Objection resolved — Addressed
02/16/2024
Objection resolved — Addressed
02/15/2024
Objection raised — Mechanical
02/15/2024
Objection raised — C/O of existing property requi
02/06/2024
Permit issued — Structural
M00803290-S3-ST
02/06/2024
Permit issued — Mechanical Systems
M00803290-S4-MS
02/05/2024
Objection resolved — Addressed
02/02/2024
Objection raised — Other
01/25/2024
Filed — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-S4
01/25/2024
Filed — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-S3
01/25/2024
Filed — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-P3
01/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
12/22/2023
Permit issued — Sidewalk Shed
M00960925-I1-SH
12/20/2023
Filed — Alteration
Modification to existing mechanical systems related to fitout.
M00803290-P4
12/13/2023
Permit issued — Construction Fence
M00967868-I1-FN
12/11/2023
Objection resolved — Addressed
12/11/2023
Objection resolved — Addressed
12/11/2023
Objection resolved — Addressed
12/04/2023
Objection raised — Structural
12/04/2023
Objection raised — Inspections
12/04/2023
Objection resolved — Addressed
12/04/2023
Objection raised — Structural
12/04/2023
Objection resolved — Addressed
12/04/2023
Objection raised — Structural
12/04/2023
Objection resolved — Addressed
12/04/2023
Objection raised — Structural
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNEW CLASSIC RESTORATION L02/06/2024
DOB NOWMechanical SystemsSigned-offNEW CLASSIC RESTORATION L02/06/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING12/22/2023
DOB NOWConstruction FenceSigned-offNEW CLASSIC RESTORATION L12/13/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING11/14/2023
DOB NOWAntennaSigned-offTRISTRUX LLC11/02/2023
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L10/24/2023
DOB NOWSprinklersSigned-offBLUEWATER P&H, INC08/28/2023
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L08/14/2023
DOB NOWGeneral ConstructionSigned-offNEW CLASSIC RESTORATION L05/12/2023
DOB NOWGeneral ConstructionSigned-offHI-TECH C.P.M. CORP03/01/2023
DOB NOWGeneral ConstructionPermit IssuedZ J CONTRACTING & RESTORA01/26/2023
DOB NOWSupported ScaffoldSigned-offYARKS NYC INC02/23/2022
DOB NOWSidewalk ShedSigned-offYARKS NYC INC02/23/2022
DOB NOWSidewalk ShedSigned-offYARKS NYC INC09/24/2021
DOB NOWSupported ScaffoldSigned-offYARKS NYC INC09/24/2021
BISPLISSUEDF.S. SITE CORP10/05/2016
BISOTISSUEDTMG CONSTRUCTION CORP08/15/2016
BISOTISSUEDTMG CONSTRUCTION CORP08/08/2016
BISPLISSUEDF.S. SITE CORP05/11/2016
BISOTISSUEDTMG CONSTRUCTION CORP03/31/2016
BISOTISSUEDTMG CONSTRUCTION CORP03/21/2014
BISEQISSUEDS S BRIDGING & SCAFFOLDIN04/19/2012
BISEQISSUEDS S BRIDGING & SCAFFOLDIN04/18/2012
BISEQISSUEDEXPERT ENTERPRISES INC03/20/2012
BISEQISSUEDEXPERT ENTERPRISES INC03/20/2012
BISEQISSUEDP.J.B. CONTRACTING CORP12/07/2011
BISOTISSUEDTOP 8 CONSTRUCTION CORP11/16/2011
BISSPISSUEDCASE PLUMBING LLC06/18/2010
BISOTISSUEDH INTERIOR DESIGN CONSTRUCTION06/11/2010
BISSPISSUEDAMKAY PLBG AND HTG INC05/20/2010
BIS—ISSUEDH INTERIOR DESIGN CONSTRUCTION04/23/2010
BISOTISSUEDHSU & ASSOC INC09/18/2007
BIS—ISSUEDHSU & ASSOCIATES INC.06/01/2005
BISOTISSUEDL & W DEVELOPMENT INC05/27/2004
BISOTISSUEDCHARTER COMM INC10/08/2003
BISEQISSUEDL AND W DEVL INC04/24/2003
BISOTISSUEDL W DEVE. INC.04/24/2003
BISSPISSUEDAVON PLBG & HTG INC08/18/2000
BISPLISSUEDAVON PLBG & HTG INC06/15/2000
+ 5 more permits on file
3 projects · most recent 05/07/2025
General Wiring
FiledStatusContractorScope
05/07/2025Permit IssuedLENLITE ELEC'L CONTR'S IN5 meters, 1 new_meters
05/20/2024CompleteLENLITE ELEC'L CONTR'S INGeneral Wiring
09/22/2021Permit IssuedRICHARD NEU—
1 project · most recent 11/14/2023
Sidewalk Shed
FiledStatusContractorScope
11/14/2023Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/01/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/28/2025Fire-Resistant Penetrations and Jointsjon libascispecial
03/28/2025Sprinkler SystemsNicolas Crosettospecial
03/20/2025Sprinkler SystemsNicolas Crosettospecial
03/20/2025Fire-Resistant Penetrations and Jointsjon libascispecial
08/16/2024Mechanical SystemsERIC BERLENTspecial
08/16/2024FinalERIC BERLENTprogress
08/16/2024Fire-Resistant Penetrations and Jointsjon libascispecial
07/24/2024Mechanical SystemsERIC BERLENTspecial
07/24/2024FinalERIC BERLENTprogress
07/24/2024Fire-Resistant Penetrations and Jointsjon libascispecial
07/18/2024Fire-Resistance Rated Constructionjon libasciprogress
07/18/2024Fire-Resistant Penetrations and Jointsjon libascispecial
01/02/2024Fire-Resistant Penetrations and Jointsjon libascispecial
11/07/2023Structural Steel - High Strength BoltingDominick Pillaspecial
11/07/2023Structural Steel - DetailsDominick Pillaspecial
11/07/2023Structural Steel - WeldingDominick Pillaspecial
10/30/2023FinalDominick Pillaprogress
10/19/2023Fire-Resistant Penetrations and Jointsjon libascispecial
10/19/2023Fire-Resistance Rated Constructionjon libasciprogress
06/13/2023Fire-Resistance Rated Construction—progress
06/13/2023Fire-Resistant Penetrations and Joints—special
03/28/2023Fire-Resistance Rated Construction—progress
03/28/2023Fire-Resistant Penetrations and Joints—special
09/23/2021Post-installed AnchorsJOEL PHAGOOspecial
08/02/2021FinalMING WAI WONGprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Alexander Gray GalleryOfficeFloor 1, Mezzanine, Roof
Project M00803290 Alteration · LOC Issued · 01/12/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
09/03/2026M00568568-I1Request digital key ↗
09/03/2026M00594264-I1Request digital key ↗
09/03/2026M00594281-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026M00134833-I1Request digital key ↗
▸Applications & Permits33
▸BISWORK PERMIT APPLICATION13
08/23/2016122805296Open ↗
08/11/2016122805296Open ↗
05/12/2016122701460Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
02/08/2017122805296Open ↗
08/04/2016122805296Open ↗
03/23/2016122701460Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWLPC Approval/Permit7
08/30/2026M00803290-S4Open ↗
08/30/2026M00803290-I1Open ↗
08/13/2026M00134833-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
05/17/2017122805296Open ↗
05/17/2017122701460Open ↗
08/11/2016122805296Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00594264-I1Open ↗
09/03/2026M00594281-I1Open ↗
08/30/2026M00803290-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/30/2026M00803290-P5Open ↗
09/30/2026M00803290-P5Open ↗
09/26/2026M00594264-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
04/23/2012121051379Open ↗
04/20/2012121049962Open ↗
03/23/2012121015310Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
04/23/2012121051379Open ↗
04/20/2012121049962Open ↗
03/23/2012121015310Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/30/2026M00803290-P5Open ↗
09/23/2026M00803290-I1Open ↗
08/28/2026M00803290-S4Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/08/2017122805296Open ↗
08/04/2016122805296Open ↗
03/23/2016122701460Open ↗
▸BISSCHEDULE B - PLUMBING1
06/15/2010120379786Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/28/2010120379786Open ↗
▸Environmental & Asbestos24
▸DOB NOWOER: Notice to Proceed6
08/30/2026M00803290-I1Open ↗
08/13/2026M00568568-I1Open ↗
08/13/2026M00803290-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026M00803290-S4Open ↗
08/13/2026M00803290-S3Open ↗
08/13/2026M00803290-S2Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
04/23/2012121051379Open ↗
03/23/2012121015310Open ↗
03/23/2012121015310Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/09/2016122805296Open ↗
08/04/2016122805296Open ↗
03/23/2016122701460Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00134833-I1Open ↗
08/13/2026M00568568-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00803290-S3Open ↗
08/13/2026M00134833-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
03/28/2016122701460Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/17/2017122805296Open ↗
05/17/2017122701460Open ↗
08/11/2016122805296Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/17/2017122805296Open ↗
05/17/2017122701460Open ↗
04/30/2015121934121Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
03/27/2014121934121Open ↗
11/18/2011120828550Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/29/2011120828550Open ↗
▸Approvals, Objections & Sign-offs20
▸BISLANDMARKS APPROVAL7
05/17/2017122805296Open ↗
05/17/2017122701460Open ↗
03/27/2014121934121Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
04/23/2012121051379Open ↗
04/20/2012121049962Open ↗
03/23/2012121015310Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/17/2017122805296Open ↗
05/17/2017122701460Open ↗
04/30/2015121934121Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/29/2011120828550Open ↗
12/27/2011120828550Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
05/17/2017122805296Open ↗
05/17/2017122701460Open ↗
08/04/2016122805296Open ↗
Showing 3 of 11 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/15/2010120379786Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET10
08/04/2016122805296Open ↗
03/23/2016122701460Open ↗
03/27/2014121934121Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION4
05/27/2016122701460Open ↗
05/23/2016122701460Open ↗
04/25/2012121049962Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
09/28/2011120828550Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building4
08/30/2026M00803290-I1Open ↗
08/30/2026M00803290-P2Open ↗
08/14/2026M00803290-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/28/2017122805296Open ↗
03/28/2017122701460Open ↗
11/18/2011120828550Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
03/20/2014121934121Open ↗