← Back
Elevator cooperative
3840 CANNON PLACE
BRONX · BIN 2092475
💬 Discuss this project
1958Year Built
13Stories
D4Building Class
R6AZoning
170,350 sfGross Floor Area
171Units
LL97 CoveredRent Stabilized205 Open Violations ▸FISP: SWARMP
Elevator cooperative · 59,440 sf lot · 2.87 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK RESERVOIR HSG CORP103/22/2026
TO THE OWNER OF 3845 SEDG103/22/2026
PARK RESERVOIR HOUSING1103/22/2026
PARK RES HOUSING CP203/22/2026
STEEL SYSTEMS403/21/2026
S L GREEN REALTY203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SMEP DESIGN & CONSULTATION LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK PLBG-HTG-COOLINGPlumbing203/22/2026
REAZ MOHAMMEDElectrical103/21/2026
Building Lifecycle
All (78)Filed (1)Permit Issued (2)Signed Off (1)Facade (FISP) (12)Violation (60)Objection (2)
06/11/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01132423-I1
06/09/2026
Permit issued — Suspended Scaffold
X01132423-I1-SC
05/07/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
10/11/2025
Violation issued (HPD, open)
C
10/11/2025
Violation issued (HPD, open)
B
10/11/2025
Violation issued (HPD, open)
C
10/11/2025
Violation issued (HPD, open)
B
10/11/2025
Violation issued (HPD, open)
B
03/27/2025
Cycle 9 facade report signed — SWARMP
02/10/2025
Cycle 9 facade report submitted
01/28/2025
Cycle 9 facade inspection completed
12/20/2024
Permit issued — Suspended Scaffold
X01132423-I1-SC
12/17/2024
Objection raised — Other
12/17/2024
Objection resolved — Addressed
12/05/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01132423-I1
10/04/2024
Violation issued (HPD, open)
C
10/04/2024
Violation issued (HPD, open)
B
10/04/2024
Violation issued (HPD, open)
B
10/04/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, open)
A
07/10/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, open)
B
05/29/2024
Violation issued (HPD, open)
A
05/29/2024
Violation issued (HPD, open)
B
05/29/2024
Violation issued (HPD, open)
B
05/24/2024
Violation issued (HPD, open)
B
05/24/2024
Violation issued (HPD, open)
A
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, open)
C
06/30/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (HPD, open)
A
06/30/2023
Violation issued (HPD, closed)
C
01/23/2023
Violation issued (HPD, open)
B
01/23/2023
Violation issued (HPD, open)
A
01/23/2023
Violation issued (HPD, open)
B
01/03/2023
Violation issued (HPD, open)
A
01/03/2023
Violation issued (HPD, open)
B
01/03/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, closed)
I
08/09/2022
Violation issued (HPD, open)
A
08/09/2022
Violation issued (HPD, open)
A
08/04/2022
Violation issued (HPD, open)
B
08/04/2022
Violation issued (HPD, open)
B
03/08/2022
Violation issued (HPD, closed)
A
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/09/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM12/20/2024
BISOTISSUEDQUALITY BUILDING CONSTRUTION06/14/2017
BISEQISSUEDSTEEL SYSTEMS LLC12/29/2016
BISOTISSUEDQUALITY BUILDING CONSTRUTION09/02/2016
BISEQISSUEDSTEEL SYSTEMS LLC08/02/2016
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE09/06/2012
BISEQISSUEDSPRING SCAFFOLDING06/06/2002
BISEQISSUEDSPRING SCAFFOLDING06/06/2002
1 project · most recent 12/06/2023
General Wiring
FiledStatusContractorScope
12/06/2023CompleteTHE METRO GROUP ELECTRICGeneral Wiring
1 project · most recent 12/05/2024
FiledStatusContractorScope
12/05/2024Signed-offSTRUCTUAL PRESV SYSTEM—
Nothing on file for this building.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026X01132423-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
02/07/2018220519669Open ↗
12/27/2016240168055Open ↗
08/03/2016220519669Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
06/15/2017220519669Open ↗
12/27/2016240168055Open ↗
09/02/2016220519669Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/04/2018220519669Open ↗
06/06/2016220519669Open ↗
09/06/2012220221846Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/27/2016240168055Open ↗
08/01/2016240151161Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/27/2016240168055Open ↗
08/01/2016240151161Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/27/2016240168055Open ↗
08/01/2016240151161Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/06/2012220221846Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/06/2012220221846Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
12/27/2016240168055Open ↗
08/01/2016240151161Open ↗
06/06/2016220519669Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS INSPECTION REPORT1
08/30/2016220519669Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/16/2018220519669Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/04/2018220519669Open ↗
06/06/2016220519669Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
12/27/2016240168055Open ↗
08/01/2016240151161Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/04/2018220519669Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/27/2016240168055Open ↗
08/01/2016240151161Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/11/2018220519669Open ↗
04/04/2018220519669Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/06/2012220221846Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
04/04/2018220519669Open ↗
08/30/2016220519669Open ↗
06/06/2016220519669Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET2
12/27/2016240168055Open ↗
08/01/2016240151161Open ↗
▸BISBOROUGH INTAKE FORM2
04/04/2018220519669Open ↗
02/07/2018220519669Open ↗
▸BISEFILING COVER SHEET2
06/06/2016220519669Open ↗
09/06/2012220221846Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026X01132423-I1Open ↗