← Back
BuildNYC
City residence, one family
385 14TH STREET
BROOKLYN · Park Slope · BIN 3026514
💬 Discuss this project
1885Year Built
3Stories
A4Building Class
R6BZoning
—Gross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
City residence, one family · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFlat roof tilt rack voltaic system installationUnder Construction18p · 3 filings · 20 docs
Floor 318p · 1 filing · 16 docs
Floor 2CASA BRING-MITCHELL structural work37p · 3 filings · 20 docs
Floor 1CASA BRING-MITCHELL structural work31p · 3 filings · 20 docs
CellarCASA BRING-MITCHELL structural work30p · 3 filings · 20 docs
Sub-BasementFlat roof tilt rack voltaic system installationUnder Construction1 filing · 7 docs
Site & exteriorFlat roof tilt rack voltaic system installationUnder Construction1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
387 14th St Realty403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM Engineering109/23/2026
David Cunningham Architecture Plann502/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Euda ConstructionGeneral Contractor407/08/2026
Brooklyn SolarworksGeneral Contractor109/30/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E Build Evergreen I9342109/23/2026
HRF Services5616302/14/2023
Building Lifecycle
All (51)Filed (6)Permit Issued (4)Signed Off (2)Violation (4)Inspection (4)Objection (24)Special Inspection (7)
09/29/2026
Permit issued — Solar
B01450464-I1-SL
09/23/2026
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01450464-I1
09/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
09/23/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/24/2026
Special inspection requirement — Final
NARESH MAHANGU
04/11/2023
Signed off — Alteration
PROPOSE STRUCTURAL, PARTIAL DEMO, TEMPORARY SHORING WORK AS PER PLAN FILED IN CONJUNCTION WITH ALT-CO B00547741 FOR CONVERSION OF 2-FAMILY TO 1-FAMILY HOUSE.
B00551138-I1
02/23/2023
Signed off — Alteration
PROPOSE MINOR PLUMBING WORKS WITHIN LIMITED AREAS AS PER PLAN FILED IN CONUNCTION WITH ALT-CO B00547741-I1 FOR CONVERSION OF 2-FAMILY TO 1-FAMILY HOUSE.
B00551079-I1
02/15/2023
Objection resolved — Addressed
02/14/2023
Filed — Alteration CO
PROPOSE TO CONVERT EXISTING TWO FAMILY HOUSE TO A SINGLE FAMILY HOUSE WITH INTERIOR FINISH WORK, PARTITION, PARTIAL DEMOLITION WORKS WITHIN LIMITED AREAS AS SHOWN PER PLAN. PLUMBING, STRUCTURAL, FOUNDATION FILED SEPARATELY UNDER DOB NOW. OBTAIN NEW C OF O
B00547741-P1
02/14/2023
Objection raised — Scope
02/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/22/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/11/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Other
06/29/2022
Filed — Alteration
PROPOSE MINOR PLUMBING WORKS WITHIN LIMITED AREAS AS PER PLAN FILED IN CONUNCTION WITH ALT-CO B00547741-I1 FOR CONVERSION OF 2-FAMILY TO 1-FAMILY HOUSE.
B00551079-P1
09/28/2021
Permit issued — Plumbing
B00551079-I1-PL
09/27/2021
Permit issued — General Construction
B00547741-I1-GC
09/27/2021
Permit issued — Structural
B00551138-I1-ST
08/05/2021
Objection resolved — Addressed
08/03/2021
Objection resolved — Addressed
08/03/2021
Objection resolved — Addressed
08/03/2021
Objection resolved — Addressed
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection resolved — Addressed
07/16/2021
Objection raised — Inspections
07/16/2021
Objection raised — Other
07/16/2021
Objection raised — Admin
07/16/2021
Objection raised — Admin
07/16/2021
Objection raised — Scope
07/16/2021
Objection raised — Zoning
07/16/2021
Objection raised — Zoning
07/16/2021
Objection raised — Scope
07/16/2021
Objection resolved — Addressed
07/16/2021
Objection raised — Fire_Protection
07/16/2021
Objection raised — Scope
07/16/2021
Objection resolved — Addressed
07/13/2021
Filed — Alteration
PROPOSE STRUCTURAL, PARTIAL DEMO, TEMPORARY SHORING WORK AS PER PLAN FILED IN CONJUNCTION WITH ALT-CO B00547741 FOR CONVERSION OF 2-FAMILY TO 1-FAMILY HOUSE.
B00551138-I1
07/13/2021
Filed — Alteration
PROPOSE MINOR PLUMBING WORKS WITHIN LIMITED AREAS AS PER PLAN FILED IN CONUNCTION WITH ALT-CO B00547741-I1 FOR CONVERSION OF 2-FAMILY TO 1-FAMILY HOUSE.
B00551079-I1
07/12/2021
Filed — Alteration CO
PROPOSE TO CONVERT EXISTING TWO FAMILY HOUSE TO A SINGLE FAMILY HOUSE WITH INTERIOR FINISH WORK, PARTITION, PARTIAL DEMOLITION WORKS WITHIN LIMITED AREAS AS SHOWN PER PLAN. PLUMBING, STRUCTURAL, FOUNDATION FILED SEPARATELY UNDER DOB NOW. OBTAIN NEW C OF O
B00547741-I1
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/08/2013
Violation issued (ECB, closed)
Unknown
05/08/2013
Violation issued (ECB, closed)
Construction
05/08/2013
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedBrooklyn Solarworks09/29/2026
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG09/28/2021
DOB NOWGeneral ConstructionPermit IssuedEuda Construction09/27/2021
DOB NOWStructuralSigned-offEuda Construction09/27/2021
BISPLISSUEDOrbit Plumbing & Heating01/25/2021
BISPLISSUEDOrbit Plumbing & Heating09/26/2017
BISPLISSUEDDo Rite Mechanical06/04/2014
BISMHISSUEDCentury General Contracting03/11/2014
BISOTISSUEDCentury General Contracting03/05/2014
BISPLISSUEDMPC Plumbing & Heating06/07/2011
BISMHISSUEDGemstar Construction06/06/2011
BISOTISSUEDGemstar Construction06/06/2011
2 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedBrooklyn Solar Electric—
10/18/2021CompleteW 8 ElectricGeneral Wiring
1 project · most recent 09/23/2026
FiledStatusContractorScope
09/23/2026Permit IssuedBrooklyn Solarworks16 panels, 7.04 kw, 1,014 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/23/2026Structural Stability – Alterations of existing buildingsDanny Chenspecial
09/23/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/24/2026Fire-Resistant Penetrations and JointsDanny Chenspecial
08/24/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/24/2026FinalNARESH MAHANGUprogress
02/10/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/10/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
10/04/2026B01450464-I1Request digital key ↗
08/15/2026B00547741-P1Request digital key ↗
08/15/2026B00547741-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION12
01/04/2021320894449Open ↗
12/17/2020320894449Open ↗
11/17/2020320894449Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION9
01/27/2021320894449Open ↗
10/18/2017320894449Open ↗
10/16/2017320894449Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit6
10/01/2026B01450464-I1Open ↗
08/13/2026B00547741-I1Open ↗
08/13/2026B00547741-P1Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00547741-I1Open ↗
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/10/2014320894449Open ↗
01/23/2012320296826Open ↗
01/23/2012320296826Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/01/2026B01450464-I1Open ↗
08/13/2026B00551138-I1Open ↗
08/13/2026B00551079-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
10/01/2026B01450464-I1Open ↗
10/01/2026B01450464-I1Open ↗
09/01/2026B00547741-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/01/2026B01450464-I1Open ↗
09/01/2026B00547741-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/10/2014320894449Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/10/2014320894449Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE5
06/10/2015320894449Open ↗
03/23/2015320894449Open ↗
01/20/2012320296826Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/19/2014320894449Open ↗
07/18/2014320894449Open ↗
06/10/2014320894449Open ↗
▸BISSCHEDULE B - PLUMBING3
11/17/2020320894449Open ↗
11/09/2020320894449Open ↗
04/19/2011320296826Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B00547741-P1Open ↗
08/13/2026B00547741-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00547741-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
10/01/2026B01450464-I1Open ↗
08/13/2026B00547741-P1Open ↗
08/13/2026B00551079-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/19/2011320296826Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/26/2021320894449Open ↗
04/26/2021320894449Open ↗
04/08/2021320894449Open ↗
▸BISTECHNICAL REPORT: ENERGY2
01/23/2012320296826Open ↗
06/08/2011320296826Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/23/2012320296826Open ↗
12/02/2011320296826Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/10/2014320894449Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/08/2021320894449Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/26/2021320894449Open ↗
04/26/2021320894449Open ↗
04/26/2021320894449Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS2
06/10/2014320894449Open ↗
04/19/2011320296826Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/26/2021320894449Open ↗
01/23/2012320296826Open ↗
▸BISSUPERSEDING LETTER1
10/18/2017320894449Open ↗
▸BISLANDMARKS SIGNOFF1
04/08/2021320894449Open ↗
▸BISLANDMARKS APPROVAL1
06/10/2014320894449Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
11/09/2020320894449Open ↗
06/10/2014320894449Open ↗
01/23/2012320296826Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/08/2021320894449Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
02/18/2021320894449Open ↗
01/04/2021320894449Open ↗
12/02/2020320894449Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
04/19/2011320296826Open ↗
04/19/2011320296826Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026B00547741-I1Open ↗