Rent Stabilized7 Open Violations ▸FDNY Report ↗
Three families · 2,500 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 3Under Construction9p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED SCAFFOLDING INC.504/09/2026
CELTIC SYSTEMS CO NY503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2016$1.1M—— → —$468/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDREW KATZ ENGINEERS202/25/2026
SARAH JACOBY ARCHITECT, DPC401/19/2026
PAUL G. JONES, P.E.109/29/2025
EVODIA IBRAHIM109/11/2025
GASBARRO STRUCTURAL ENGINEERING107/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER703/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CELTIC SYSTEMS CO NY INCGeneral Contractor303/21/2026
PARK SLOPE PAINTING SERVIGeneral Contractor304/09/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor204/09/2026
ELMAC ELECTRIC INC.Electrical103/22/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087202/25/2026
GASBARRO STRUCTURAL ENGIN5919301/19/2026
SARAH JACOBY ARCHITECT5641201/19/2026
Building Lifecycle
All (13)Filed (9)Signed Off (4)
06/25/2026
Signed off — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-S3
06/24/2026
Signed off — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-S1
02/25/2026
Filed — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-P3
02/12/2026
Signed off — Alteration
TEMPORARY INSTALLATION OF A SIDEWALK SHED AND PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
B01294416-I1
02/03/2026
Signed off — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-S2
01/19/2026
Filed — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-P2
12/11/2025
Filed — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-P1
09/29/2025
Filed — Alteration
TEMPORARY INSTALLATION OF A SIDEWALK SHED AND PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
B01294416-I1
09/11/2025
Filed — Alteration
B01275769-I1
07/23/2025
Filed — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-S3
07/23/2025
Filed — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-S1
07/23/2025
Filed — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-S2
02/24/2025
Filed — Alteration CO
Plumbing work filed in conjunction with the conversion from a 3 to a 2 family. At 3rd floor remove kitchen and renovate bathroom.
B01096547-I1
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.