← Back
BuildNYC
Elevator cooperative
3850 HUDSON MANOR TERRACE
BRONX · BIN 2091927
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R4Zoning
188,200 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized82 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · 68,625 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAkam Associates, INC.2p · 2 filings · 20 docs
Floor 5Unit 5BW4p · 1 filing · 8 docs
Floor 4Unit 4BE7p · 2 filings · 20 docs
Floor 3
Floor 2Heavy duty sidewalk shed installation1p · 1 filing · 6 docs
Floor 1Unit 1AE, Unit 1FW9p · 3 filings · 20 docs
Site & exteriorAkam Associates, INC.35p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hudson Manor Terrace3303/21/2026
L&P NY Construction103/22/2026
FS Residential103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Akam Associates203/21/2026
Niza Works of Architecture403/21/2026
Lombardo Building Consultants403/21/2026
Lloyd Noel Building Consultant103/21/2026
AE Design Solution203/21/2026
D D Expeditors203/21/2026
Quick Filing of NY103/21/2026
Quick Filing103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brend RestorationScaffold807/08/2026
DPH Plumbing & HeatingPlumbing407/08/2026
Your Building SolutionGeneral Contractor303/21/2026
Avarga ConstructionGeneral Contractor303/21/2026
Next Level Construction IGeneral Contractor303/21/2026
Amsterdam ElectricElectrical203/22/2026
Phoenix Sutton STRScaffold207/08/2026
Aleks & FGeneral Contractor203/21/2026
Inter RenovationGeneral Contractor207/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Whitestone PlumbingPlumbing107/08/2026
Elpo Electrical ContgElectrical103/22/2026
Throop Electric CoElectrical103/21/2026
Evs ElectricElectrical103/22/2026
WCK ElectricElectrical103/21/2026
Brend Restorationspecialty_contractor107/08/2026
L&P New York ConstructionGeneral Contractor107/08/2026
Alan E. RosenbergPlumbing107/08/2026
Kishan PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lingineering Consulting E5666205/21/2026
Colombo Architectural Stu4930405/14/2025
Amka & Associates8239202/13/2025
Niza Works of Architects6101411/12/2024
Autographic Co1579103/07/2023
Catalpa Special Inspectio2004103/07/2023
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 03/17/2026, status Swarmp
09/17/2026
Elevator Category 1 inspection report filed
07/30/2026
Co-op apartment 3EW sold for $215,000
06/08/2026
Signed off — Alteration
brick and lintel replacement as per plans submitted.
X00961982-I1
06/01/2026
Co-op apartment 6BE sold for $380,000
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH Plumbing & Heating01/20/2026
DOB NOWStructuralSigned-offInter Renovation07/16/2025
DOB NOWStructuralSigned-offAvarga Construction06/16/2025
DOB NOWGeneral ConstructionSigned-offBrend Restoration05/07/2025
DOB NOWSuspended ScaffoldPermit IssuedInter Renovation12/20/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating11/29/2024
DOB NOWGeneral ConstructionSigned-offL&P New York Construction11/22/2024
DOB NOWPlumbingSigned-offN and S Plumbing08/13/2024
DOB NOWGeneral ConstructionSigned-offNext Level Construction I08/08/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR05/03/2024
DOB NOWStructuralSigned-offInter Renovation01/24/2024
DOB NOWPlumbingSigned-offDPH Plumbing & Heating11/29/2023
DOB NOWSupported ScaffoldSigned-offBrend Restoration10/02/2023
DOB NOWSidewalk ShedSigned-offBrend Restoration09/25/2023
DOB NOWSupported ScaffoldSigned-offBrend Restoration06/08/2023
DOB NOWSidewalk ShedSigned-offBrend Restoration06/08/2023
DOB NOWPlumbingSigned-offWhitestone Plumbing12/06/2022
DOB NOWGeneral ConstructionPermit IssuedYour Building Solution09/23/2021
DOB NOWPlumbingPermit IssuedAlan E. Rosenberg06/18/2021
DOB NOWGeneral ConstructionPermit IssuedAleks & F05/18/2021
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR09/06/2019
BISOTISSUEDInter Renovation04/26/2022
BISOTISSUEDInter Renovation01/21/2021
BISOTISSUEDInter Renovation06/03/2020
BISOTISSUEDInter Renovation02/11/2020
BISPLISSUEDBent Mechanical06/04/2018
BIS—ISSUEDAyn Maintenance-Renovation04/23/2018
BISPLISSUEDTrue North Mechanical01/16/2018
BIS—ISSUEDAyn Maintenance-Renovation12/29/2017
BISPLISSUEDAlan E. Rosenberg12/14/2016
BISOTISSUEDFrancemex12/12/2016
BISOTISSUEDRight Price General Construction01/08/2016
BISPLISSUEDQBK Plumbing & Heating01/07/2016
BISPLISSUEDOrion Plumbing & Heating10/07/2015
BISPLISSUEDOrion Plumbing & Heating10/07/2015
BISOTISSUEDGak Construction09/24/2015
BISOTISSUEDGak Construction09/24/2015
BISOTISSUEDElite Innovative & Design09/03/2015
BISPLISSUEDHudson Plumbing and Heating Co12/09/2014
BISOTISSUEDSTD Enterprises09/19/2014
+ 25 more permits on file
1 project · most recent 05/25/2021
Water/Sanitary
FiledStatusContractorScope
05/25/2021Permit IssuedAlan E. RosenbergWater/Sanitary
18 projects · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026CompleteLerco ElectricGeneral Wiring
02/06/2026CompleteCross Brothers Electric—
02/06/2026CompleteCross Brothers Electric—
07/09/2025CompleteA.C. Morgan ElectricGeneral Wiring
10/29/2024CompleteEvs ElectricGeneral Wiring
10/10/2024CompleteDNR ElectricGeneral Wiring
08/23/2024CompleteEmpire Lic Electrical ContractorsGeneral Wiring
07/24/2024CompleteMase ElectricGeneral Wiring
05/04/2024Permit IssuedRichard Neu—
04/30/2024CompleteElpo Electrical Contg—
10/02/2023CompleteTop Shelf Electric—
06/19/2023CompleteE & M Electrical NYGeneral Wiring
05/18/2023CompleteTop Shelf Electric—
01/23/2023Permit IssuedAmsterdam ElectricGeneral Wiring
12/01/2022CompleteK.N.C. ElectricGeneral Wiring
1 project · most recent 05/21/2026
Masonry
FiledStatusContractorScope
05/21/2026Signed-offInter RenovationMasonry
1 project · most recent 01/20/2020
Sidewalk Shed
FiledStatusContractorScope
01/20/2020Permit IssuedPhoenix Sutton STRSidewalk Shed
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
05/22/2026Structural Stability – Alterations of existing buildingsChingyuan Linspecial
05/22/2026FinalChingyuan Linprogress
05/22/2026MasonryChingyuan Linspecial
05/22/2026Tenant Protection Plan ComplianceChingyuan Linspecial
04/15/2025FinalChingyuan Linprogress
04/15/2025MasonryChingyuan Linspecial
04/15/2025Structural Stability – Alterations of existing buildingsChingyuan Linspecial
04/15/2025Tenant Protection Plan ComplianceChingyuan Linspecial
04/03/2025Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
02/11/2025Structural Steel - High Strength BoltingAHMAD KHANZADAspecial
02/11/2025Structural Steel - DetailsAHMAD KHANZADAspecial
12/16/2024Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
12/16/2024Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
12/16/2024FinalAHMAD KHANZADAprogress
11/14/2024FinalNicolas Zapataprogress
11/14/2024Energy Code Compliance InspectionsNicolas Zapataprogress
11/14/2024Interior lighting powerNicolas Zapataenergy_progress
11/14/2024Lighting in dwelling unitsNicolas Zapataenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsNicolas Zapataspecial
11/14/2024Energy Code Compliance InspectionsNicolas Zapataprogress
11/14/2024Fire-Resistant Penetrations and JointsNicolas Zapataspecial
10/23/2024Energy Code Compliance InspectionsNicolas Zapataprogress
10/23/2024Fire-Resistant Penetrations and JointsNicolas Zapataspecial
09/20/2024Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
09/15/2024FinalYahaira Volquez Colomboprogress
Latest 25 of 33.
411 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account