DOB10/31/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB10/31/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB10/31/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB07/23/2018FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR GAS PIPING THAT HAVE BEEN ALTERED BUT HAVE NOT BEEN TESTED.*PHOTOS TAKEN*REM:PERFORM TEST$12K due
ECB07/23/2018GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BYDOB.AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR GAS BEING SUPPLIED TO THE BUILDING WITHOUT DOB AUTHORIZATION.REM:FILE FOR REQUIRED PER$25K due
ECB06/13/2018WORK WITHOUT A PERMIT.AT TIME OF MY INSPECTION I OBSERVED WORK PERFORMED UNDER EWN #15858 PIPING REMOVED RE-DOPED AND RE-INSTALLED PLUS 2 NEW GAS VALVES INSTALLED NO LAA WAS FILED FOR WITHIN 5 DAYS AS REQURIED$8K due
One family attached or semi-detached · 1,479 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.