Two stories - detached, small or mid-size
3862 SEDGWICK AVENUE
BRONX · BIN 2015230
💬 Discuss this project
1901Year Built
2.75Stories
A1Building Class
R6AZoning
2,678 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: 3862 SEDGWICK LLC · 8,750 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction80p · 2 filings · 20 docs
Floor 7Under Construction50p · 1 filing · 20 docs
Floor 6Under Construction99p · 1 filing · 20 docs
Floor 5Under Construction96p · 1 filing · 20 docs
Floor 4Under Construction98p · 1 filing · 20 docs
Floor 3Under Construction98p · 1 filing · 20 docs
Floor 2Under Construction101p · 2 filings · 20 docs
Floor 1Under Construction100p · 2 filings · 20 docs
CellarUnder Construction100p · 1 filing · 20 docs
Sub-BasementUnder Construction28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRAVERTINE109/29/2026
SEDGWICK AVENUE HOLDING3707/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES803/21/2026
EXPEDITE DEM603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE DEVELOPMENTGeneral Contractor1007/08/2026
DYNAMIC HOISTING SCAFF INGeneral Contractor609/10/2026
PRECISE CONSTRUCTION CONRGeneral Contractor207/08/2026
METFLOW FIRE CONTROL LLCFire Protection107/08/2026
ACCORD POWER INCGeneral Contractor109/29/2026
CREATIVE PLUMBING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H & O ENGINEERING, DPC5595104/09/2025
BLUE LIGHT CONSULTING &AM9394703/06/2025
Building Lifecycle
All (98)Filed (15)Permit Issued (21)Signed Off (1)Inspection (6)Objection (22)Special Inspection (30)Tax Incentive (3)
06/01/2027
485-x construction completed
09/28/2026
Permit issued — Solar
X01465397-I1-SL
09/09/2026
Permit issued — Sidewalk Shed
X01131311-S8-SH
06/26/2026
Permit issued — Mechanical Systems
X01131311-S3-MS
06/25/2026
Permit issued — General Construction
X01131311-I1-GC
06/25/2026
Permit issued — Construction Fence
X01131311-S7-FN
06/11/2026
Permit issued — Sidewalk Shed
X01131311-S8-SH
04/28/2026
Permit issued — Sprinklers
X01131311-S5-EW-SP
04/20/2026
Permit issued — Protection and Mechanical Methods
X01131311-Z1-PMM
04/17/2026
Filed — New Building
Applicaiton filed for temporary construction fence in conjunction with NB X01131311-I1
X01131311-Z1
04/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2026
Permit issued — Protection and Mechanical Methods
X01131311-S9-PMM
04/03/2026
Permit issued — Supported Scaffold
X01300332-I1-SF
04/02/2026
Filed — Alteration
Installation of a temporary supported scaffold and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01300332-I1
04/02/2026
Filed — New Building
Applicaiton filed for temporary construction fence in conjunction with NB X01131311-I1
X01131311-S9
03/20/2026
Permit issued — Sidewalk Shed
X01131311-S8-SH
03/19/2026
Filed — New Building
Applicaiton filed for temporary construction fence in conjunction with NB X01131311-I1
X01131311-S8
03/05/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/06/2026
Permit issued — Plumbing
X01131311-S4-PL
12/26/2025
Permit issued — Mechanical Systems
X01131311-S3-MS
12/26/2025
Permit issued — General Construction
X01131311-I1-GC
12/24/2025
Permit issued — Foundation
X01131311-S1-FO
12/24/2025
Permit issued — Structural
X01131311-S2-ST
12/24/2025
485-x registration filed
12/24/2025
485-x construction commenced
12/22/2025
Permit issued — Support of Excavation
X01131311-S6-SE
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2025
Permit issued — Construction Fence
X01131311-S7-FN
10/20/2025
Filed — New Building
Applicaiton filed for temporary construction fence in conjunction with NB X01131311-I1
X01131311-S7
10/14/2025
Signed off — Full Demolition
mechanical equipment will assist with demolition, and equipment will be placed on grade.
X01204459-I1
09/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2025
Permit issued — Full Demolition
X01204459-I1-FD
09/15/2025
Permit issued — Protection and Mechanical Methods
X01204459-S1-PMM
09/09/2025
Permit issued — Construction Fence
X01204459-S2-FN
08/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
04/24/2025
Special inspection requirement — Protection of exposed foundation insulation
Feng Li
04/24/2025
Special inspection requirement — Air barrier — testing
Feng Li
04/22/2025
Filed — Full Demolition
mechanical equipment will assist with demolition, and equipment will be placed on grade.
X01204459-S1
04/09/2025
Filed — Full Demolition
mechanical equipment will assist with demolition, and equipment will be placed on grade.
X01204459-I1
04/09/2025
Filed — Full Demolition
mechanical equipment will assist with demolition, and equipment will be placed on grade.
X01204459-S2
04/02/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
04/02/2025
Special inspection requirement — Demolition
SANTIAGO HELMAN
03/13/2025
Objection resolved — Addressed
03/12/2025
Objection raised — Other
03/12/2025
Objection resolved — Addressed
03/11/2025
Objection raised — Structural
03/11/2025
Objection raised — Admin
03/11/2025
Objection raised — Structural
03/11/2025
Objection raised — Structural
03/11/2025
Objection raised — Structural
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedACCORD POWER INC09/28/2026
DOB NOWSidewalk ShedPermit IssuedDYNAMIC HOISTING SCAFF IN09/09/2026
DOB NOWMechanical SystemsPermit IssuedINNOVATIVE DEVELOPMENT06/26/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE DEVELOPMENT06/25/2026
DOB NOWConstruction FencePermit IssuedINNOVATIVE DEVELOPMENT06/25/2026
DOB NOWSidewalk ShedPermit IssuedDYNAMIC HOISTING SCAFF IN06/11/2026
DOB NOWSprinklersPermit IssuedMETFLOW FIRE CONTROL LLC04/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDYNAMIC HOISTING SCAFF IN04/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDYNAMIC HOISTING SCAFF IN04/03/2026
DOB NOWSupported ScaffoldPermit IssuedDYNAMIC HOISTING SCAFF IN04/03/2026
DOB NOWSidewalk ShedPermit IssuedDYNAMIC HOISTING SCAFF IN03/20/2026
DOB NOWPlumbingPermit IssuedAB PLUMBING INC01/06/2026
DOB NOWMechanical SystemsPermit IssuedINNOVATIVE DEVELOPMENT12/26/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE DEVELOPMENT12/26/2025
DOB NOWFoundationPermit IssuedINNOVATIVE DEVELOPMENT12/24/2025
DOB NOWStructuralPermit IssuedINNOVATIVE DEVELOPMENT12/24/2025
DOB NOWSupport of ExcavationPermit IssuedINNOVATIVE DEVELOPMENT12/22/2025
DOB NOWConstruction FencePermit IssuedINNOVATIVE DEVELOPMENT10/21/2025
DOB NOWFull DemolitionSigned-offPRECISE CONSTRUCTION CONR09/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRECISE CONSTRUCTION CONR09/15/2025
DOB NOWConstruction FenceSigned-offINNOVATIVE DEVELOPMENT09/09/2025
BISPLISSUEDL. GLASHOW, INC05/16/2019
1 project · most recent 04/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/17/2026Permit IssuedDYNAMIC HOISTING SCAFF INHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ZRNU363M2AA 36,200 BTU · Vrf Outdoor ×2
ARUM096BTE5 96,000 BTU · Vrf Outdoor ×1
KNSAP241A 22,000 BTU · Fan Coil Indoor ×1
KUSAP241A 22,000 BTU · Vrf Outdoor ×1
ZRUM036GSS0 36,000 BTU · Vrf Outdoor ×1
ZRUM060GSS0 60,000 BTU · Vrf Outdoor ×1
Captiveaire CAS-HVAC3-E, 602-18-12.5T-DOAS 149,400 BTU · Rooftop Unit ×1
Ventilation
Greenheck G-080-VG 330 CFM · Exhaust Fan ×2
G-090-VG 425 CFM · Exhaust Fan ×1
G-099-VG 810 CFM · Exhaust Fan ×1
1 project · most recent 04/17/2026
Sprinkler System
FiledStatusContractorScope
04/17/2026Permit IssuedMETFLOW FIRE CONTROL LLCSprinkler System
1 project · most recent 04/17/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/17/2026Permit IssuedMETFLOW MECHANICAL LLCStorm, Water/Sanitary
5 projects · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedACCORD POWER ELECTRIC LLC—
08/19/2026Permit IssuedTUXEDO ELEC'L CONTR'G INCGeneral Wiring
04/14/2026Permit IssuedMNE ELECTRIC INCGeneral Wiring
03/19/2026Permit IssuedNASH ELECTRIC SERVICES IN—
03/12/2026Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 04/17/2026
Concrete
FiledStatusContractorScope
04/17/2026Permit IssuedDYNAMIC HOISTING SCAFF INConcrete
3 projects · most recent 04/17/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
04/17/2026Permit IssuedDYNAMIC HOISTING SCAFF INFence, Sidewalk Shed
04/02/2026Permit IssuedDYNAMIC HOISTING SCAFF INScaffold
04/22/2025Signed-offPRECISE CONSTRUCTION CONRFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/05/2026Pass-Final PL - UndergroundPassView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
04/24/2025Protection of exposed foundation insulationFeng Lienergy_progress
04/24/2025Air barrier — testing Feng Lienergy_progress
04/02/2025Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
04/02/2025DemolitionSANTIAGO HELMANspecial
03/02/2025Maintenance informationFeng Lienergy_progress
03/02/2025Fire-Resistant Penetrations and JointsFeng Lispecial
03/02/2025Post-installed AnchorsFeng Lispecial
03/02/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFeng Lispecial
03/02/2025Fire-Resistant Penetrations and JointsFeng Lispecial
03/02/2025Post-installed AnchorsFeng Lispecial
03/02/2025HVAC-R and service water heating equipmentFeng Lienergy_progress
03/02/2025HVAC-R and service water piping design and insulationFeng Lienergy_progress
03/02/2025Electrical motors and elevatorsFeng Lienergy_progress
03/02/2025HVAC-R and service water heating system controlsFeng Lienergy_progress
03/02/2025Shutoff dampersFeng Lienergy_progress
03/02/2025Lighting controlsFeng Lienergy_progress
03/02/2025Exterior lighting powerFeng Lienergy_progress
03/02/2025MeteringFeng Lienergy_progress
03/02/2025Lighting in dwelling unitsFeng Lienergy_progress
03/02/2025Interior lighting powerFeng Lienergy_progress
02/27/2025Structural Steel - DetailsFeng Lispecial
02/27/2025Excavations - Sheeting, Shoring, and BracingFeng Lispecial
02/27/2025Structural Steel - WeldingFeng Lispecial
02/27/2025Subgrade InspectionsFeng Lispecial
02/27/2025Subsurface Conditions – Fill Placement & In-Place DensityFeng Lispecial
Latest 25 of 46.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/19/2026X01204459-I1Request digital key ↗
08/19/2026X01204459-S1Request digital key ↗
08/19/2026X01204459-S2Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
07/15/2025240362460Open ↗
07/13/2020240238426Open ↗
10/11/2018240238426Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/15/2025240362460Open ↗
▸BISWORK PERMIT APPLICATION1
05/16/2019240238426Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/15/2025240362460Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026X01131311-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X01131311-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026X01131311-I1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature24
09/06/2026X01131311-S3Open ↗
09/06/2026X01131311-S3Open ↗
09/06/2026X01131311-S3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/06/2026X01131311-S3Open ↗
09/06/2026X01131311-S3Open ↗
09/06/2026X01131311-S3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/19/2026X01204459-I1Open ↗
08/19/2026X01204459-S1Open ↗
08/19/2026X01204459-S2Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/15/2025240362460Open ↗
10/11/2018240238426Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/15/2025240362460Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING2
07/13/2020240238426Open ↗
10/11/2018240238426Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026X01131311-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01204459-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01204459-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01204459-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01204459-I1Open ↗
▸Safety & Tenant Protection5
▸BISBPP: STREET TREES SITE PLAN1
07/15/2025240362460Open ↗
▸BISSTREET TREE CHECKLIST1
07/15/2025240362460Open ↗
▸BISTenant Protection Plan and Notes1
10/11/2018240238426Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026X01131311-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/17/2026X01131311-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026X01204459-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01204459-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/02/2018240238426Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/18/2020240238426Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/02/2018240238426Open ↗
10/11/2018240238426Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026X01131311-S1Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026X01131311-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/18/2020240238426Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/18/2020240238426Open ↗
10/26/2018240238426Open ↗
10/11/2018240238426Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
09/11/2020240238426Open ↗
10/25/2019240238426Open ↗
10/26/2018240238426Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/15/2025240362460Open ↗
10/11/2018240238426Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/15/2025240362460Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification2
08/19/2026X01204459-I1Open ↗
08/17/2026X01131311-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/18/2020240238426Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/15/2025240362460Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/15/2025240362460Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026X01131311-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026X01131311-S6Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01204459-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01204459-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01204459-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026X01131311-I1Open ↗