387 CLOVE ROAD
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5175350
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LYNHURST/CHESTNUT LLC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.404/16/2024
WILLIAM MONTAGUE ENGINEER403/12/2024
C&P DESIGN CONSULTANTS602/21/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICOLOSI BROS INCGeneral Contractor603/21/2026
FINE MECHANICAL CORPPlumbing207/08/2026
RIDGE ELECTRIC CORP.Electrical103/22/2026
MERCURY FIRE SUPP INCFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING56771204/16/2024
Building Lifecycle
All (71)Filed (14)Permit Issued (7)Signed Off (4)Inspection (12)Objection (4)Special Inspection (30)
05/06/2024
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Final
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Metering
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
05/06/2024
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
04/16/2024
Filed — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-P7
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Final
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
04/16/2024
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
04/11/2024
Signed off — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-S1
04/08/2024
Signed off — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-S2
04/03/2024
Signed off — Alteration
PROPOSED 10' COMBINED CURB CUT TO FILED IN CONJUNCTION WITH 387 GARAGE CLOVE ROAD NB#S00865847-I1, 391 GARAGE CLOVE ROAD NB#S00865849-I1, 391 CLOVE ROAD NB#S00616659-I1
S00732112-I1
04/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2024
Signed off — Alteration
residential sprinkler plans (PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF)
S00663868-I1
03/20/2024
Permit issued — Curb Cut
S00732112-I1-CC
03/12/2024
Filed — Alteration
PROPOSED 10' COMBINED CURB CUT TO FILED IN CONJUNCTION WITH 387 GARAGE CLOVE ROAD NB#S00865847-I1, 391 GARAGE CLOVE ROAD NB#S00865849-I1, 391 CLOVE ROAD NB#S00616659-I1
S00732112-P1
02/21/2024
Filed — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-P6
01/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2023
Filed — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-P5
09/05/2023
Permit issued — Plumbing
S00663868-I1-PL
08/23/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/11/2023
Permit issued — Plumbing
S87754772-S2-PL
07/26/2023
Filed — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-P4
07/17/2023
Permit issued — Sprinklers
S00663868-I1-EW-SP
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/02/2023
Filed — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-P2
07/01/2023
Filed — New Building
INSTALLATION OF NEW SPLIT-DX AC UNITS AND ASSOCIATED CONDENSER UNIT FOR COOLING & BOILER WITH BASEBOARD OFR HEATING FOR RESIDENTIAL HOUSE FIT-OUT. INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR SYSTEM VENTILATION.
S00616654-P3
06/05/2023
Objection resolved — Addressed
06/03/2023
Objection raised — Zoning
05/22/2023
Filed — Alteration
residential sprinkler plans (PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF)
S00663868-P1
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNICOLOSI BROS INC03/20/2024
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP09/05/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/11/2023
DOB NOWSprinklersSigned-offMERCURY FIRE SUPP INC07/17/2023
DOB NOWStructuralPermit IssuedNICOLOSI BROS INC04/28/2023
DOB NOWMechanical SystemsSigned-offNICOLOSI BROS INC04/28/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP04/28/2023
1 project · most recent 04/16/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2024Signed-offNICOLOSI BROS INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Comfort Aire MCG2430 & PA13N-030 28,000 BTU ×4
Toson GWH12AFCXB & GWH18AFDXE / TM24H5O 22,000 BTU · Split System ×2
Heating
Payne PG80ESA48090C 72,000 BTU · Furnace ×2
PG92SBS60080C 75,000 BTU · Furnace ×2
Ventilation
Fantech HERO 150H-EC 100 CFM · Erv ×2
SH 704 70 CFM · Erv ×2
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×1
1 project · most recent 04/16/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/16/2024Signed-offFINE MECHANICAL CORPGas, Storm, Water/Sanitary
1 project · most recent 08/01/2023
General Wiring
FiledStatusContractorScope
08/01/2023CompleteRIDGE ELECTRIC CORP.General Wiring
1 project · most recent 04/16/2024
Wood
FiledStatusContractorScope
04/16/2024Permit IssuedNICOLOSI BROS INCWood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
05/06/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
05/06/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
05/06/2024Subgrade InspectionsWILLIAM MONTAGUEspecial
05/06/2024Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
05/06/2024Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
05/06/2024Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
05/06/2024Structural Wood FrameWILLIAM MONTAGUEprogress
05/06/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
05/06/2024FinalWILLIAM MONTAGUEprogress
05/06/2024Footing and FoundationWILLIAM MONTAGUEprogress
05/06/2024Fenestration air leakageWILLIAM MONTAGUEenergy_progress
05/06/2024Fenestration areasWILLIAM MONTAGUEenergy_progress
05/06/2024Interior lighting powerWILLIAM MONTAGUEenergy_progress
05/06/2024Permanent certificateWILLIAM MONTAGUEenergy_progress
05/06/2024Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
05/06/2024Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
05/06/2024MeteringWILLIAM MONTAGUEenergy_progress
05/06/2024Air barrier — testing WILLIAM MONTAGUEenergy_progress
05/06/2024Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
05/06/2024Maintenance informationWILLIAM MONTAGUEenergy_progress
05/06/2024Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
04/16/2024Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
04/16/2024Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
04/16/2024Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
04/16/2024FinalWILLIAM MONTAGUEprogress
Latest 25 of 113.
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/24/2026S00663868-P1Request digital key ↗
08/24/2026S00663868-I1Request digital key ↗
08/23/2026S00616654-P3Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits7
▸BISBPP-5 - Authorization to the Department of Transportation5
11/04/2022540210332Open ↗
10/17/2022540210332Open ↗
10/17/2022540210332Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
05/04/2023540210332Open ↗
11/30/2021540210332Open ↗
▸Zoning, Tax Lot & Property Records20
▸DOB NOWRestrictive Declaration/Easement 110
08/13/2026S00616654-P6Open ↗
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-P1Open ↗
08/13/2026S00616654-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-P1Open ↗
08/13/2026S00616654-P4Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/06/2022540210332Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00616654-I1Open ↗
▸Seals & Professional Certifications119
▸DOB NOWProgress Inspector Seal & Signature72
10/01/2026S00616654-P4Open ↗
10/01/2026S00616654-P4Open ↗
10/01/2026S00616654-P4Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
10/01/2026S00616654-P4Open ↗
10/01/2026S00616654-P4Open ↗
10/01/2026S00616654-P4Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/24/2026S00663868-I1Open ↗
08/24/2026S00663868-P1Open ↗
08/23/2026S00616654-P1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/30/2021540210332Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/30/2021540210332Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00616654-P1Open ↗
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026S00616654-P1Open ↗
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00616654-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00616654-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00616654-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00616654-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/13/2026S00616654-P1Open ↗
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-P7Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/30/2021540210332Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00616654-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00616654-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff4
11/04/2022540210332Open ↗
10/17/2022540210332Open ↗
05/06/2022540210332Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/30/2021540210332Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial4
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-P1Open ↗
08/13/2026S00616654-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00616654-I1Open ↗
08/13/2026S00616654-P1Open ↗
08/13/2026S00616654-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/23/2026S00616654-P7Open ↗
08/23/2026S00616654-P4Open ↗
08/15/2026S00616654-I1Open ↗
Showing 3 of 4 on file for this type
▸BISWAIVER OF CURB ALIGNMENT1
05/06/2022540210332Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/30/2021540210332Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00616654-I1Open ↗