Two family brick
3870 SEDGWICK AVENUE
BRONX · BIN 2015232
💬 Discuss this project
1899Year Built
1.75Stories
B1Building Class
R6AZoning
1,588 sfGross Floor Area
2Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family brick · Owner of record: 3870 SEDGWICK LLC · 10,261 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof8p · 3 filings · 20 docs
Floor 6Under Construction82p · 1 filing · 20 docs
Floor 5Under Construction78p · 1 filing · 20 docs
Floor 4Under Construction78p · 1 filing · 20 docs
Floor 3Under Construction74p · 1 filing · 20 docs
Floor 2Under Construction76p · 2 filings · 20 docs
Floor 1Under Construction82p · 1 filing · 20 docs
BasementUnder Construction79p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SEDGWICK AVENUE HOLDING6107/08/2026
INNOVATIVE DEVELOPMENT1003/22/2026
DEVELOPMENT INNOVATIVE403/22/2026
TRAVERTINE803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2023$1.1M—— → —$661/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1703/21/2026
Rigid Structural Design, LLC803/21/2026
EXPEDITE DEM603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE DEVELOPMENTGeneral Contractor2307/08/2026
DYNAMIC HOISTING SCAFF INGeneral Contractor807/08/2026
STAR COMPANIESS LLCGeneral Contractor207/08/2026
METFLOW FIRE CONTROL LLCFire Protection207/08/2026
CREATIVE PLUMBING INPlumbing107/08/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
ACCORD POWER INCGeneral Contractor104/09/2026
ACCORD POWER ELECTRIC LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLUE LIGHT CONSULTING &AM93941603/05/2026
SYNERGIC DESIGN LLC8561109/25/2025
HRF SERVICES CORP5616101/21/2025
H & O ENGINEERING, DPC5595102/28/2024
Building Lifecycle
All (147)Filed (24)Permit Issued (27)Signed Off (12)Violation (15)Inspection (16)Objection (20)Special Inspection (30)Tax Incentive (3)
08/25/2026
Signed off — New Building
Sprinkler system for a new building. Filed in conjunction with NB application X01080947-I1
X01080947-S3
08/22/2026
Signed off — New Building
Sprinkler system for a new building. Filed in conjunction with NB application X01080947-I1
X01080947-S4
07/31/2026
Signed off — Alteration
Installation of 4.05 kw solar energy system on roof. No change of occupancy, use or egress.
X01291985-I1
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2026
Signed off — New Building
Sprinkler system for a new building. Filed in conjunction with NB application X01080947-I1
X01080947-S7
04/20/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/16/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Signed off — New Building
Sprinkler system for a new building. Filed in conjunction with NB application X01080947-I1
X01080947-S8
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2026
Permit issued — Curb Cut
X01080947-S7-CC
04/01/2026
Objection resolved — Addressed
04/01/2026
Special inspection requirement — Protection of exposed foundation insulation
Feng Li
04/01/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Feng Li
04/01/2026
Special inspection requirement — Vestibules
Feng Li
04/01/2026
Special inspection requirement — Insulation placement and R values
Feng Li
04/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Feng Li
04/01/2026
Special inspection requirement — Masonry
Feng Li
04/01/2026
Special inspection requirement — Fenestration air leakage
Feng Li
04/01/2026
Special inspection requirement — Maintenance information
Feng Li
04/01/2026
Special inspection requirement — Air barrier - visual inspection
Feng Li
04/01/2026
Special inspection requirement — Air barrier — testing
Feng Li
04/01/2026
Special inspection requirement — Fenestration areas
Feng Li
04/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Feng Li
04/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Feng Li
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Feng Li
04/01/2026
Special inspection requirement — Sprayed fire-resistant materials
Feng Li
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Feng Li
04/01/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Feng Li
03/27/2026
Objection resolved — Resolved
03/25/2026
Signed off — Alteration
X01132282-I1
03/19/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/19/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2026
Signed off — Alteration
Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01242036-I1
03/13/2026
Signed off — Alteration
Installation of a temporarily supported scaffold ,heavy-duty sidewalk shed, roof and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01179154-I1
03/13/2026
Objection raised — Energy
03/07/2026
Objection raised — Energy
03/05/2026
Filed — New Building
Sprinkler system for a new building. Filed in conjunction with NB application X01080947-I1
X01080947-P7
03/04/2026
Objection resolved — Addressed
03/04/2026
Special inspection requirement — Interior lighting power
Feng Li
03/04/2026
Special inspection requirement — Metering
Feng Li
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Feng Li
03/04/2026
Special inspection requirement — Post-installed Anchors
Feng Li
03/04/2026
Special inspection requirement — Exterior lighting power
Feng Li
03/04/2026
Special inspection requirement — Final
Feng Li
03/04/2026
Special inspection requirement — Shutoff dampers
Feng Li
03/04/2026
Special inspection requirement — Maintenance information
Feng Li
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Feng Li
03/04/2026
Special inspection requirement — Lighting in dwelling units
Feng Li
03/04/2026
Special inspection requirement — Electrical motors and elevators
Feng Li
03/04/2026
Special inspection requirement — Mechanical Systems
Feng Li
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Feng Li
03/03/2026
Permit issued — Sprinklers
X01080947-S8-EW-SP
02/21/2026
Violation issued (ECB, closed)
Construction
02/08/2026
Objection raised — Admin
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offINNOVATIVE DEVELOPMENT04/02/2026
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC03/03/2026
DOB NOWConstruction FenceSigned-offINNOVATIVE DEVELOPMENT12/17/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE DEVELOPMENT12/12/2025
DOB NOWSolarSigned-offACCORD POWER INC09/29/2025
DOB NOWMechanical SystemsSigned-offINNOVATIVE DEVELOPMENT09/12/2025
DOB NOWSidewalk ShedSigned-offDYNAMIC HOISTING SCAFF IN07/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offDYNAMIC HOISTING SCAFF IN07/15/2025
DOB NOWSupported ScaffoldSigned-offDYNAMIC HOISTING SCAFF IN07/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offDYNAMIC HOISTING SCAFF IN06/23/2025
DOB NOWSupported ScaffoldSigned-offDYNAMIC HOISTING SCAFF IN03/28/2025
DOB NOWSidewalk ShedSigned-offDYNAMIC HOISTING SCAFF IN03/28/2025
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC03/07/2025
DOB NOWPlumbingSigned-offAB PLUMBING INC03/07/2025
DOB NOWSupport of ExcavationSigned-offINNOVATIVE DEVELOPMENT02/05/2025
DOB NOWStructuralSigned-offINNOVATIVE DEVELOPMENT12/30/2024
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE DEVELOPMENT12/30/2024
DOB NOWFoundationSigned-offINNOVATIVE DEVELOPMENT12/27/2024
DOB NOWConstruction FenceSigned-offINNOVATIVE DEVELOPMENT12/19/2024
DOB NOWFoundationSigned-offINNOVATIVE DEVELOPMENT12/12/2024
DOB NOWStructuralSigned-offINNOVATIVE DEVELOPMENT12/12/2024
DOB NOWSupport of ExcavationSigned-offINNOVATIVE DEVELOPMENT12/11/2024
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE DEVELOPMENT12/06/2024
DOB NOWConstruction FenceSigned-offINNOVATIVE DEVELOPMENT11/27/2024
DOB NOWFull DemolitionSigned-offSTAR COMPANIESS LLC11/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offSTAR COMPANIESS LLC11/04/2024
DOB NOWConstruction FenceSigned-offINNOVATIVE DEVELOPMENT08/08/2024
1 project · most recent 03/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026Signed-offINNOVATIVE DEVELOPMENTHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXMA24AAVJU 27,300 BTU · Vrf Indoor ×46
RXTA36AAVJU 42,000 BTU · Vrf Outdoor ×46
RXTA24AAVJU 27,000 BTU · Vrf Outdoor ×38
FXMA15AAVJU 17,100 BTU · Vrf Indoor ×20
FXMA30AAVJU 31,500 BTU · Vrf Indoor ×10
FXMA12AAVJU 13,600 BTU · Vrf Indoor ×8
FXMA18AAVJU 21,500 BTU · Vrf Indoor ×8
FXMA30AAVJU, FXMA24AAVJU 27,300 BTU · Vrf Indoor ×4
RXC24AXVJU 22,000 BTU · Condensing Unit ×2
RXTA60AAVJU 57,500 BTU · Vrf Outdoor ×2
Rupp Air RARTU2-E.452-15-10T-DOAS 143,700 BTU · Rooftop Unit ×2
Ventilation
Greenheck SQ-160VG 2,100 CFM · Exhaust Fan ×2
1 project · most recent 03/05/2026
Sprinkler System
FiledStatusContractorScope
03/05/2026Signed-offMETFLOW FIRE CONTROL LLCSprinkler System
1 project · most recent 03/05/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/05/2026Signed-offCREATIVE PLUMBING INStorm, Water/Sanitary
5 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedVALENTIS ELECTRIC, INC.General Wiring
04/18/2026CompleteVALENTIS ELECTRIC, INC.General Wiring
11/26/2025CompleteTUXEDO ELEC'L CONTR'G INC—
09/26/2025CompleteACCORD POWER ELECTRIC LLC—
10/08/2024CompleteVALENTIS ELECTRIC, INC.1 meters, 1 new_meters
1 project · most recent 03/05/2026
FiledStatusContractorScope
03/05/2026Signed-offINNOVATIVE DEVELOPMENT4 scope_items
1 project · most recent 09/25/2025
FiledStatusContractorScope
09/25/2025Signed-offACCORD POWER INC30 panels, 12.15 kw, 4,975.09 roof_area_sqft
1 project · most recent 07/11/2024
Fence
FiledStatusContractorScope
07/11/2024Signed-offSTAR COMPANIESS LLCFence
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/20/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/16/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/19/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/30/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
04/01/2026Protection of exposed foundation insulationFeng Lienergy_progress
04/01/2026VestibulesFeng Lienergy_progress
04/01/2026Maintenance informationFeng Lienergy_progress
04/01/2026Fenestration air leakageFeng Lienergy_progress
04/01/2026Air barrier — testing Feng Lienergy_progress
04/01/2026Air barrier - visual inspectionFeng Lienergy_progress
04/01/2026Insulation placement and R valuesFeng Lienergy_progress
04/01/2026Fire-Resistance Rated ConstructionFeng Liprogress
04/01/2026Energy Code Compliance InspectionsFeng Liprogress
04/01/2026Fire-Resistant Penetrations and JointsFeng Lispecial
04/01/2026Alternative Materials - OTCR Buildings Bulletin NumberFeng Lispecial
04/01/2026MasonryFeng Lispecial
04/01/2026Sprayed fire-resistant materialsFeng Lispecial
04/01/2026Wall Panels, Curtain Walls, and VeneersFeng Lispecial
04/01/2026Exterior Insulation and Finish Systems (EIFS)Feng Lispecial
04/01/2026Fenestration and door U-factor and product ratingsFeng Lienergy_progress
04/01/2026Fenestration areasFeng Lienergy_progress
03/04/2026MeteringFeng Lienergy_progress
03/04/2026HVAC-R and service water heating system controlsFeng Lienergy_progress
03/04/2026Fire-Resistant Penetrations and JointsFeng Lispecial
03/04/2026Mechanical SystemsFeng Lispecial
03/04/2026Post-installed AnchorsFeng Lispecial
03/04/2026FinalFeng Liprogress
03/04/2026HVAC-R and service water piping design and insulationFeng Lienergy_progress
03/04/2026Interior lighting powerFeng Lienergy_progress
Latest 25 of 123.
▾Documents — 210 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/21/2026X01002156-I1Request digital key ↗
08/21/2026X01002156-S1Request digital key ↗
08/21/2026X01002156-S2Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/18/2024240360596Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/18/2024240360596Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X01080947-P5Open ↗
08/13/2026X01080947-I1Open ↗
08/13/2026X01080947-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026X01080947-P5Open ↗
08/13/2026X01080947-P1Open ↗
08/13/2026X01080947-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X01080947-I1Open ↗
08/13/2026X01080947-P1Open ↗
08/13/2026X01080947-P5Open ↗
▸Seals & Professional Certifications143
▸DOB NOWProgress Inspector Seal & Signature74
09/06/2026X01080947-S4Open ↗
09/06/2026X01080947-S4Open ↗
09/06/2026X01080947-S4Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/06/2026X01080947-S4Open ↗
09/06/2026X01080947-S4Open ↗
09/06/2026X01080947-S4Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/20/2026X01132282-I1Open ↗
08/19/2026X01179154-P2Open ↗
08/19/2026X01179154-P1Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/18/2024240360596Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2024240360596Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X01080947-P1Open ↗
08/13/2026X01080947-P5Open ↗
08/13/2026X01080947-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01002156-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01002156-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01002156-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01002156-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026X01080947-P5Open ↗
08/13/2026X01080947-I1Open ↗
08/13/2026X01080947-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026X01002156-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01002156-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01080947-S6Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X01080947-S6Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026X01080947-S2Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026X01291985-I1Open ↗
▸Filing & Intake Forms1
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/18/2024240360596Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification4
08/18/2026X01080947-P5Open ↗
08/18/2026X01080947-I1Open ↗
08/14/2026X01080947-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X01080947-P5Open ↗
08/13/2026X01080947-I1Open ↗
08/13/2026X01080947-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026X01080947-P1Open ↗
08/13/2026X01080947-I1Open ↗
08/13/2026X01080947-P5Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/03/2024240360596Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01002156-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01002156-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01080947-S6Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01002156-I1Open ↗