Miscellaneous educational facility
Bronx Preparatory Charter School
3872 3 AVENUE · Name © OpenStreetMap contributors · BIN 2113141
💬 Discuss this project
2003Year Built
5Stories
W9Building Class
M1-4Zoning
67,625 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
Miscellaneous educational facility · Owner of record: FRIENDS OF BRONX PREPARATORY CHARTER SCH OOL, INC. · 44,549 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction24p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 3 docs
Floor 5Under Construction29p · 2 filings · 20 docs
Floor 4Under Construction28p · 2 filings · 20 docs
Floor 3Under Construction32p · 2 filings · 20 docs
Floor 2Under Construction28p · 2 filings · 20 docs
Floor 1Under Construction38p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEMOCRACY PREP PUBLIC SCHOOLS2208/28/2026
OWNER OF 2872 ,3 AVE103/22/2026
BRONX PREP CHARTER SCHOOL103/22/2026
ECONOMIC DEVELOPMENT3003/21/2026
BX PREPARATORY CHARTER SCHOOL103/21/2026
BRONX PREPARATORY CHAPTER SCHOOL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OLA CONSULTING ENGINEERS, PC708/18/2026
SOCOTEC, INC.105/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.103/21/2026
JM ZONING, LLC.1003/21/2026
PS ENGINEERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HVAC CONSTRUCTION INCGeneral Contractor708/01/2026
R.J.C. MECHANICAL CORPPlumbing307/14/2026
TRINITY ELECTRIC GROUPElectrical103/22/2026
ASTRO ELECL CONTNG INCElectrical103/22/2026
TRIBUTE RESTORATION INCGeneral Contractor104/09/2026
BEDROCK MECHANICAL INCFire Protection106/28/2026
FINTAN MURRAYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC6942608/18/2026
SOCOTEC, INC.301105/05/2025
Building Lifecycle
All (103)Filed (9)Permit Issued (12)Signed Off (2)Violation (42)Inspection (6)Objection (2)Special Inspection (30)
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Shutoff dampers
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
AILANTO DANIEL MINAWI
08/21/2026
Special inspection requirement — Shutoff dampers
AILANTO DANIEL MINAWI
08/18/2026
Filed — Alteration
DISCONNECTION AND RECONNECTION OF GAS PIPING SERVING ROOFTOP AIRHANDLING UNITS IN SUPPORT OF UNIT REPLACEMENTS. NO REVISIONS TO PIPE SIZINGOR NEW PIPING INSTALLATIONS
X01200970-P1
08/18/2026
Filed — Alteration
INSTALLATION OF NEW ROOFTOP UNITS AND ASSOCIATED DUCTWORK, CONTROLS AND SPECIALTIES.2. INSTALLATION OF NEW EXHAUST FANS AND ASSOCIATED DUCTWORK, ETC.3. INSTALLATION OF NEW SMOKE PURGE FAN AND ASSOCIATED DUCTWORK, ETC.
X01193911-P2
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2026
Permit issued — Mechanical Systems
X01200970-I1-MS
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Shutoff dampers
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
07/28/2026
Special inspection requirement — Shutoff dampers
AILANTO DANIEL MINAWI
07/13/2026
Permit issued — Plumbing
X01200970-S1-PL
07/10/2026
Permit issued — Sprinklers
X01193911-S1-PL
06/23/2026
Permit issued — Mechanical Systems
X01200970-I1-MS
06/10/2026
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
X01237526-I1
02/23/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
X01217208-I1
10/24/2025
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
10/02/2025
Permit issued — Suspended Scaffold
X01237526-I1-SC
09/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/18/2025
Filed — Alteration
INSTALLATION OF NEW ROOFTOP UNITS AND ASSOCIATED DUCTWORK, CONTROLS AND SPECIALTIES.2. INSTALLATION OF NEW EXHAUST FANS AND ASSOCIATED DUCTWORK, ETC.3. INSTALLATION OF NEW SMOKE PURGE FAN AND ASSOCIATED DUCTWORK, ETC.
X01193911-P1
08/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2025
Permit issued — Mechanical Systems
X01200970-I1-MS
06/24/2025
Permit issued — Sprinklers
X01193911-S1-PL
06/24/2025
Permit issued — Mechanical Systems
X01200970-I1-MS
06/24/2025
Permit issued — Plumbing
X01193911-S1-EW-SP
06/24/2025
Permit issued — Mechanical Systems
X01193911-I1-MS
06/13/2025
Permit issued — Suspended Scaffold
X01237526-I1-SC
06/13/2025
Permit issued — General Construction
X01217208-I1-GC
06/12/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
X01237526-I1
05/05/2025
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
X01217208-I1
04/30/2025
Filed — Alteration
DISCONNECTION AND RECONNECTION OF GAS PIPING SERVING ROOFTOP AIRHANDLING UNITS IN SUPPORT OF UNIT REPLACEMENTS. NO REVISIONS TO PIPE SIZINGOR NEW PIPING INSTALLATIONS
X01200970-S1
04/17/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Cost
04/03/2025
Filed — Alteration
INSTALLATION OF NEW ROOFTOP UNITS AND ASSOCIATED DUCTWORK, CONTROLS AND SPECIALTIES.2. INSTALLATION OF NEW EXHAUST FANS AND ASSOCIATED DUCTWORK, ETC.3. INSTALLATION OF NEW SMOKE PURGE FAN AND ASSOCIATED DUCTWORK, ETC.
X01193911-I1
04/03/2025
Filed — Alteration
DISCONNECTION AND RECONNECTION OF GAS PIPING SERVING ROOFTOP AIRHANDLING UNITS IN SUPPORT OF UNIT REPLACEMENTS. NO REVISIONS TO PIPE SIZINGOR NEW PIPING INSTALLATIONS
X01200970-I1
04/03/2025
Filed — Alteration
INSTALLATION OF NEW ROOFTOP UNITS AND ASSOCIATED DUCTWORK, CONTROLS AND SPECIALTIES.2. INSTALLATION OF NEW EXHAUST FANS AND ASSOCIATED DUCTWORK, ETC.3. INSTALLATION OF NEW SMOKE PURGE FAN AND ASSOCIATED DUCTWORK, ETC.
X01193911-S1
08/06/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedHVAC CONSTRUCTION INC07/31/2026
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP07/13/2026
DOB NOWSprinklersPermit IssuedR.J.C. MECHANICAL CORP07/10/2026
DOB NOWMechanical SystemsPermit IssuedHVAC CONSTRUCTION INC06/23/2026
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC10/02/2025
DOB NOWMechanical SystemsPermit IssuedHVAC CONSTRUCTION INC08/05/2025
DOB NOWSprinklersPermit IssuedR.J.C. MECHANICAL CORP06/24/2025
DOB NOWMechanical SystemsPermit IssuedHVAC CONSTRUCTION INC06/24/2025
DOB NOWPlumbingPermit IssuedBEDROCK MECHANICAL INC06/24/2025
DOB NOWMechanical SystemsPermit IssuedHVAC CONSTRUCTION INC06/24/2025
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC06/13/2025
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC06/13/2025
BISOTISSUEDMARCUS PAVERS INC10/28/2010
BISMHISSUEDT P HOME CARE CORP12/29/2009
BISPLISSUEDG.N.T. MECHANICAL LLC06/14/2006
BISOTISSUEDA.W. & S. CONSTRUCTION CO05/25/2006
BISSPISSUEDG.N.T. MECHANICAL LLC05/17/2006
BISEQISSUEDA.W. & S. CONSTRUCTION CO04/18/2006
BIS—ISSUEDA.W. & S. CONSTRUCTION CO04/18/2006
BISEQISSUEDA.W. & S. CONSTRUCTION CO02/07/2006
BIS—ISSUEDA.W. & S. CONSTRUCTION CO02/07/2006
BISSPISSUEDADVANCED PLUMBING LLC01/25/2006
BISOTISSUEDBRONX PREPARATORY01/17/2006
BISPLISSUEDADVANCED PLBG LLC04/26/2005
BISEQISSUEDA.W. & S. CONSTRUCTION CO04/06/2005
BIS—ISSUEDA.W. & S. CONSTRUCTION CO04/06/2005
BISPLISSUEDDANCIA PLUMBING & HEATING LLC03/04/2005
BISSPISSUEDDANICA PLUMBING & HEATING03/03/2005
BISPLISSUEDDANICA PLUMBING & HEATING LLC.03/03/2005
BISEQISSUEDCOLGATE SCAFFOLDING02/10/2005
BIS—ISSUEDA.W. & S. CONSTRUCTION CO02/07/2005
BISEQISSUEDA.W. & S. CONSTRUCTION CO02/07/2005
BISPLISSUEDDANICA PLUMBING & HEATING LLC.01/12/2005
BIS—ISSUEDA.W. & S. CONSTRUCTION CO11/03/2004
BISEQISSUEDA.W. & S. CONSTRUCTION CO11/01/2004
BIS—ISSUEDKLEWIN BUILDING CO06/09/2004
BISEQISSUEDKLEWIN BUILDING CO,INC06/09/2004
BISPLISSUEDG.N.T. MECHANICAL LLC01/23/2004
BISEQISSUEDKLEWIN BUILDING CO,INC01/23/2004
BISSPISSUEDG.N.T. MECHANICAL LLC11/17/2003
+ 5 more permits on file
2 projects · most recent 08/18/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedHVAC CONSTRUCTION INCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Trane DHK180A3SAH**02E0A1A1A0C40000000000 00000 4,440 CFM · Rooftop Unit ×8
DHK072A3SAL**02E0A1B1A0C40000 00000000000 2,000 CFM · Rooftop Unit ×2
Heating
Modine PDP250AE0130 1,053 CFM · Electric Heater ×1
08/18/2026Permit IssuedHVAC CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Trane 5DCZ5024A1060A 810 CFM · Rooftop Unit ×8
C400000000000 0000 DHK120A3SAL**02E0A1B1A 0C4000000000000000 4,840 CFM · Rooftop Unit ×2
DHK036A3SAL**0 2E0A1B1A0C4000 000000000000 945 CFM · Rooftop Unit ×2
DHK048A3SAL**02 E0A1B1A0C40000 00000000000 1,600 CFM · Rooftop Unit ×2
DHK060A3SAL**02 E0A1B1A0C40000 00000000000 2,100 CFM · Rooftop Unit ×2
DHK060A3SAL**02E0A1B1A0C4000000000000000 1,685 CFM · Rooftop Unit ×2
DHK120A3SAL**0 2E0A1B1A0C4000 000000000000 3,880 CFM · Rooftop Unit ×2
DHK120A3SAL**02 E0A1B1A0C40000 00000000000 7,115 CFM · Rooftop Unit ×2
DHK120A3SBH **04E0A1B1A0 C400000000000 0000 3,520 CFM · Rooftop Unit ×2
DHK150A3SBH**0 4E0A1B1A0C4000 000000000000 3,990 CFM · Rooftop Unit ×2
DHK180A3SAH**02 E0A1B1A0C4000000000000000 3,785 CFM · Rooftop Unit ×2
DHK180A3SBH **04E0A1A1A0 C40000000000 00000 4,635 CFM · Rooftop Unit ×2
Mitsubishi Electric MUZ-HM12NA 12,000 BTU · Heat Pump Outdoor ×3
PUZ-AK36NL 36,000 BTU · Heat Pump Outdoor ×2
MXZ-3D24NL 24,000 BTU · Heat Pump Outdoor ×1
SUZ-AA09NL 9,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 08/18/2026
FiledStatusContractorScope
08/18/2026Permit IssuedBEDROCK MECHANICAL INC1 heads
2 projects · most recent 08/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/18/2026Permit IssuedGREAT OAKS MECHANICAL INCGas, Water/Sanitary
08/18/2026Permit IssuedGREAT OAKS MECHANICAL INCGas
4 projects · most recent 06/26/2026
General Wiring
FiledStatusContractorScope
06/26/2026Permit IssuedTRINITY ELECTRIC GROUPGeneral Wiring
01/05/2026CompleteTRINITY ELECTRIC GROUPGeneral Wiring
11/02/2022CompleteASTRO ELECL CONTNG INC—
10/26/2021CompleteASTRO ELECL CONTNG INCGeneral Wiring
1 project · most recent 06/12/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/12/2025Signed-offTRIBUTE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
09/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/07/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/21/2026HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
08/21/2026Mechanical SystemsAILANTO DANIEL MINAWIspecial
08/21/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
08/21/2026FinalAILANTO DANIEL MINAWIprogress
08/21/2026HVAC-R and service water heating equipmentAILANTO DANIEL MINAWIenergy_progress
08/21/2026Shutoff dampersAILANTO DANIEL MINAWIenergy_progress
08/21/2026HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
08/21/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
08/21/2026Mechanical SystemsAILANTO DANIEL MINAWIspecial
08/21/2026FinalAILANTO DANIEL MINAWIprogress
08/21/2026HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
08/21/2026HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
08/21/2026Maintenance informationAILANTO DANIEL MINAWIenergy_progress
08/21/2026HVAC-R and service water heating equipmentAILANTO DANIEL MINAWIenergy_progress
08/21/2026Shutoff dampersAILANTO DANIEL MINAWIenergy_progress
07/28/2026HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
07/28/2026HVAC-R and service water heating equipmentAILANTO DANIEL MINAWIenergy_progress
07/28/2026HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
07/28/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
07/28/2026Mechanical SystemsAILANTO DANIEL MINAWIspecial
07/28/2026FinalAILANTO DANIEL MINAWIprogress
07/28/2026Shutoff dampersAILANTO DANIEL MINAWIenergy_progress
07/28/2026HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
07/28/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
07/28/2026Mechanical SystemsAILANTO DANIEL MINAWIspecial
Latest 25 of 42.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Democracy Prep New York Charter SchoolsEducationFloors 1–5, Roof
Project X01193911 Alteration · Permit Entire · 04/03/2025
Project X01200970 Alteration · Permit Entire · 04/03/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026X01193911-P2Request digital key ↗
08/19/2026X01193911-P1Request digital key ↗
08/19/2026X01193911-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
10/29/2010220076003Open ↗
12/29/2009220037591Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
09/30/2010220076003Open ↗
11/17/2009220037591Open ↗
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature31
09/01/2026X01217208-I1Open ↗
08/31/2026X01193911-I1Open ↗
08/31/2026X01193911-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026X01217208-I1Open ↗
08/31/2026X01193911-I1Open ↗
08/31/2026X01193911-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026X01193911-S1Open ↗
08/19/2026X01193911-P2Open ↗
08/19/2026X01200970-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/29/2010220076003Open ↗
09/30/2010220076003Open ↗
02/04/2010220037591Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/30/2010220076003Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/30/2010220076003Open ↗
▸Trade Schedules & Equipment17
▸BISEQUIPMENT USE PERMITS14
02/04/2010220037591Open ↗
02/04/2010220037591Open ↗
02/04/2010220037591Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
02/04/2010220037591Open ↗
02/04/2010220037591Open ↗
02/04/2010220037591Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/17/2009220037591Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
09/30/2010220076003Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/19/2026X01193911-S1Open ↗
08/19/2026X01193911-P2Open ↗
08/19/2026X01200970-P1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/04/2010220037591Open ↗
01/25/2010220037591Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/20/2010220076003Open ↗
11/17/2009220037591Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/30/2010220076003Open ↗
02/04/2010220037591Open ↗
11/17/2009220037591Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/17/2009220037591Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026X01237526-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01237526-I1Open ↗