← Back
BuildNYC
Two family brick
388 AVENUE T
BROOKLYN · BIN 3191627
💬 Discuss this project
1950Year Built
1Stories
B1Building Class
R3-1Zoning
1,757 sfGross Floor Area
2Units
Two family brick · Owner of record: 392 Avenue T Associates · 2,000 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 3Under Construction48p · 1 filing · 20 docs
Floor 2Under Construction45p · 1 filing · 20 docs
Floor 1Curb cut installationUnder Construction45p · 3 filings · 20 docs
CellarUnder Construction49p · 1 filing · 20 docs
Site & exteriorUnder Construction5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Comjem Associates3410/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2023$970K—— → —$552/sf building
12/25/2023$970K—— → —$552/sf building
06/10/2016$1.4M—— → —$768/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BGM Engineering510/08/2026
Warren Meister Architects208/21/2025
Eyal Levitt Architect106/05/2025
Advanced Professional Engineering302/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.N.C. General ContractorsGeneral Contractor804/09/2026
M.N.C. General ContractorsScaffold104/09/2026
Ness Mechanical P & HPlumbing109/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City-Wide Testing416910/08/2026
Building Lifecycle
All (129)Filed (11)Permit Issued (8)Objection (80)Special Inspection (30)
10/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Support of excavation drawings for the installation of the new foundation system
B01079472-P3
10/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
10/08/2026
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
10/08/2026
Special inspection requirement — Footing and Foundation
ELIAS RASABI
10/08/2026
Special inspection requirement — Final
ELIAS RASABI
10/08/2026
Special inspection requirement — Underpinning
ELIAS RASABI
10/08/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ELIAS RASABI
10/08/2026
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
09/21/2026
Permit issued — Plumbing
B01079472-S5-PL
04/16/2026
Objection resolved — Open
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Open
03/29/2026
Objection resolved — Addressed
03/29/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Admin
02/20/2026
Objection raised — Zoning
02/20/2026
Objection raised — Zoning
02/20/2026
Objection raised — Admin
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/02/2026
Permit issued — Construction Fence
B01267932-I1-FN
01/02/2026
Permit issued — Support of Excavation
B01079472-S1-SE
01/02/2026
Permit issued — Foundation
B01079472-S7-FO
01/02/2026
Permit issued — Structural
B01079472-S3-ST
01/02/2026
Permit issued — Mechanical Systems
B01079472-S4-MS
12/10/2025
Permit issued — General Construction
B01079472-I1-GC
12/05/2025
Permit issued — Earth Work
B01079472-S2-FO-EA
09/03/2025
Objection resolved — Addressed
08/28/2025
Objection raised — Admin
08/21/2025
Filed — Alteration
B01267932-I1
08/21/2025
Objection resolved — Addressed
08/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Support of excavation drawings for the installation of the new foundation system
B01079472-S7
07/28/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Cost
07/07/2025
Objection raised — Admin
07/07/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/12/2025
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
06/12/2025
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
06/12/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
06/12/2025
Special inspection requirement — Underpinning
ELIAS RASABI
06/11/2025
Objection raised — Mechanical
06/11/2025
Objection raised — Other
06/11/2025
Objection raised — Other
06/11/2025
Objection raised — Admin
06/11/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Other
06/06/2025
Objection raised — Scope
06/05/2025
Filed — Alteration
alteration application filed for new curb cut.
B01236276-I1
06/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Support of excavation drawings for the installation of the new foundation system
B01079472-S1
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
05/23/2025
Objection raised — Energy
05/05/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNess Mechanical P & H09/21/2026
DOB NOWConstruction FencePermit IssuedMNC General Contracting01/02/2026
DOB NOWSupport of ExcavationPermit IssuedMNC General Contracting01/02/2026
DOB NOWFoundationPermit IssuedMNC General Contracting01/02/2026
DOB NOWStructuralPermit IssuedMNC General Contracting01/02/2026
DOB NOWMechanical SystemsPermit IssuedMNC General Contracting01/02/2026
DOB NOWGeneral ConstructionPermit IssuedMNC General Contracting12/10/2025
DOB NOWEarth WorkPermit IssuedMNC General Contracting12/05/2025
1 project · most recent 10/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/08/2026Permit IssuedMNC General ContractingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUHY-HP240TNU-A1 22 tons · Vrf Outdoor ×2
Ventilation
Aldes INSPIR AIR TOP 200 CFM · Erv ×1
inspir air top 200 CFM · Erv ×1
Mitsubishi Electric INSPIR AIR TOP 200 CFM ×1
1 project · most recent 10/08/2026
Sprinkler System
FiledStatusContractorScope
10/08/2026——Sprinkler System
1 project · most recent 10/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/08/2026Permit IssuedNess Mechanical P & HGas, Storm, Water/Sanitary
1 project · most recent 10/08/2026
Steel
FiledStatusContractorScope
10/08/2026Permit IssuedNess Mechanical P & HSteel
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
10/08/2026Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
10/08/2026Concrete - Cast-In-PlaceELIAS RASABIspecial
10/08/2026Footing and FoundationELIAS RASABIprogress
10/08/2026FinalELIAS RASABIprogress
10/08/2026UnderpinningELIAS RASABIspecial
10/08/2026Subsurface Conditions – Fill Placement & In-Place DensityELIAS RASABIspecial
10/08/2026Subgrade InspectionsELIAS RASABIspecial
06/12/2025Subgrade InspectionsELIAS RASABIspecial
06/12/2025Concrete - Cast-In-PlaceELIAS RASABIspecial
06/12/2025Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
06/12/2025UnderpinningELIAS RASABIspecial
02/06/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
02/06/2025Maintenance informationELIAS RASABIenergy_progress
02/06/2025HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
02/06/2025HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
02/06/2025HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
01/27/2025Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
01/14/2025Subsurface Conditions – Fill Placement & In-Place DensityELIAS RASABIspecial
01/14/2025Subgrade InspectionsELIAS RASABIspecial
01/14/2025Concrete - Cast-In-PlaceELIAS RASABIspecial
01/14/2025Structural Steel - High Strength BoltingELIAS RASABIspecial
01/14/2025Structural Steel - WeldingELIAS RASABIspecial
01/14/2025Post-installed AnchorsELIAS RASABIspecial
01/14/2025Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
12/17/2024Sprinkler SystemsELIAS RASABIspecial
Latest 25 of 53.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/22/2026B01079472-S5Request digital key ↗
08/22/2026B01079472-S1Request digital key ↗
08/22/2026B01079472-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
02/27/2025340915889Open ↗
01/30/2025322161389Open ↗
01/29/2025322161389Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/29/2026340915889Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram2
10/11/2026B01079472-P1Open ↗
08/13/2026B01079472-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
10/11/2026B01079472-P1Open ↗
08/13/2026B01079472-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
10/11/2026B01079472-P1Open ↗
08/13/2026B01079472-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/30/2025322161389Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/30/2025322161389Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/30/2025322161389Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/30/2025322161389Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/11/2026B01079472-P1Open ↗
10/11/2026B01079472-P3Open ↗
08/21/2026B01236276-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
10/11/2026B01079472-P1Open ↗
10/11/2026B01079472-P1Open ↗
10/11/2026B01079472-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
10/11/2026B01079472-P1Open ↗
10/11/2026B01079472-P1Open ↗
10/11/2026B01079472-P1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/27/2025340915889Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/27/2025340915889Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
10/11/2026B01079472-P1Open ↗
08/13/2026B01079472-I1Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE SUPPORTING DOCUMENT1
01/29/2026340915889Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/29/2026340915889Open ↗
▸BISSTREET TREE CHECKLIST1
01/29/2026340915889Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01079472-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
10/11/2026B01079472-P1Open ↗
10/11/2026B01079472-P3Open ↗
08/13/2026B01079472-I1Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026B01079472-S2Open ↗
08/13/2026B01079472-S1Open ↗
08/13/2026B01079472-S7Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/30/2025322161389Open ↗
01/30/2025322161389Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
01/29/2025322161389Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/27/2025340915889Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
10/11/2026B01079472-P1Open ↗
08/13/2026B01079472-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
10/11/2026B01079472-P1Open ↗
08/13/2026B01079472-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01079472-S2Open ↗
08/13/2026B01079472-S1Open ↗
▸DOB NOWProperty Ownership Certification2
10/11/2026B01079472-P1Open ↗
08/13/2026B01079472-I1Open ↗