← Back
BuildNYC
Elevator apt, fireproof with stores
Inwood Living
3880 9TH AVENUE · Inwood · BIN 1091848
💬 Discuss this project
2024Year Built
17Stories
D6Building Class
R8AZoning
274,569 sfGross Floor Area
272Units
Rent Stabilized1 Active Violation ▸
Elevator apt, fireproof with stores · Owner of record: 3761 207th Street Realty · 27,450 sf lot · 10 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsThe Jay Group4 filings
Roof1p · 1 filing
BulkheadThe Jay Group1p · 1 filing
Floor 1Crunch, Ponce BankUnder Construction5p · 5 filings · 20 docs
CellarCrunchUnder Construction1p · 3 filings · 20 docs
Site & exteriorCrunch, Ponce BankUnder Construction7 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Jay Group12210/14/2026
Ponce Bank703/22/2026
401 W 207th Realty203/21/2026
3761 207th Street Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2022$25.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Denis Associates509/24/2026
Jfa Architects & Engineers1109/22/2026
Daniel Henkel208/18/2026
Bianca V. Skvirsky, PE107/16/2026
Studio Huji208/14/2025
Tan Engineering204/07/2025
A & M Associates103/26/2025
All City Engineering1101/13/2025
Paul Perdek, Prof. Engineering504/11/2024
Grid Drafting and Consulting101/24/2024
KN3 Engineering101/24/2024
Cityscape511/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Builders Services2403/21/2026
Design42 Architecture603/21/2026
A & M Associates603/21/2026
Signs Cad403/21/2026
AE Design Solution1203/21/2026
Expediting 4 U103/21/2026
Sierra Safety203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
On Star ManagementGeneral Contractor1707/08/2026
Cobra Electrical NYCElectrical603/21/2026
Overtone Consulting & ConGeneral Contractor608/14/2026
Cobra Electrical NYCGeneral Contractor603/22/2026
Core Scaffold SystemsScaffold507/08/2026
On Star ManagementScaffold407/08/2026
Safety Fire SprinklerFire Protection307/08/2026
Jem ContractingScaffold307/08/2026
E.J. YorkGeneral Contractor203/21/2026
TFK ElectricElectrical203/22/2026
Signs CadElectrical203/21/2026
Signs CadSign hanger207/08/2026
Best Mechanical ServicesPlumbing207/08/2026
Service Sign Erectors CoSign hanger107/22/2026
Pipe RitePlumbing107/08/2026
Wire Up Electrical Cont'gElectrical103/22/2026
Henry Myers P & HFire Protection106/02/2026
Ricardo's Mechanicalspecialty_contractor103/21/2026
Henry Myers P & HPlumbing106/28/2026
KG SprinklerFire Protection110/14/2026
Star Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544609/24/2026
HRF Services56162009/22/2026
Tan Engineering1291204/07/2025
Arc-HI-Tech Associates6963103/26/2025
Paul Denis Associates2472102/12/2025
Cityscape Engineering, PL5517211/08/2023
Building Lifecycle
All (246)Filed (45)Permit Issued (38)Signed Off (20)Violation (12)Inspection (21)Objection (80)Special Inspection (30)
10/13/2026
Permit issued — Sprinklers
M01141098-S3-EW-SP
09/24/2026
Filed — Alteration
SPRINKLER WORK ON FIRST AND CELLAR FLOORS RELATED TO APPLICATION #M01141098-I1
M01141098-P2
09/22/2026
Filed — New Building
Proposed seventeen (17) story + cellar and sub-cellar mixed-use building.
M00666777-A4
09/08/2026
Objection resolved — Resolved
09/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL DENIS
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/03/2026
Filed — Alteration
SPRINKLER WORK ON FIRST AND CELLAR FLOORS RELATED TO APPLICATION #M01141098-I1
M01141098-P1
09/03/2026
Objection raised — Other
08/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2026
Filed — No Work
M01447365-I1
08/18/2026
Special inspection requirement — Public Assembly Emergency Lighting
Daniel Henkel
08/13/2026
Permit issued — General Construction
M01141098-I1-GC
08/13/2026
Permit issued — Mechanical Systems
M01141098-S1-MS
08/11/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/28/2026
Special inspection requirement — Vestibules
FAHAD FATEH
07/28/2026
Special inspection requirement — Metering
FAHAD FATEH
07/28/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
07/28/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/28/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/28/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
07/28/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
07/28/2026
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/28/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
07/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
07/28/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/28/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/28/2026
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
07/28/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/28/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
07/21/2026
Permit issued — Sign
M01421592-I1-SG
07/16/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CRUNCH FITNESS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01421592-I1
05/29/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00977056-I1
05/29/2026
Permit issued — Mechanical Systems
M01141098-S1-MS
05/27/2026
Permit issued — General Construction
M01141098-I1-GC
05/11/2026
Permit issued — Sprinklers
M01141098-S3-EW-SP
04/16/2026
Objection resolved — Resolved
04/06/2026
Objection raised — Other
03/24/2026
Filed — New Building
Proposed seventeen (17) story + cellar and sub-cellar mixed-use building.
M00666777-A3
03/23/2026
Permit issued — Plumbing
M01141098-S2-PL
03/11/2026
Permit issued — Mechanical Systems
M01141098-S1-MS
03/11/2026
Permit issued — General Construction
M01141098-I1-GC
03/10/2026
Signed off — Alteration
Curb Cut application filed in conjunction with NB GC, job number: M00666777-I1.
M00831393-I1
02/03/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
02/03/2026
Special inspection requirement — Metering
FAHAD FATEH
02/03/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/03/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/30/2025
Signed off — Alteration
ERECT SIGN AS ILLUMINATED WALL SIGN, FACE LIT CHANNEL LOGO WITH HALO LIT CHANNEL LETTERS @ 9TH AVENUE ELEVATION
M01253252-I1
09/30/2025
Signed off — Alteration
M01253246-I1
09/24/2025
Permit issued — Mechanical Systems
M01198383-S4-MS
09/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Permit issued — Sign
M01253252-I1-SG
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedKG Sprinkler10/13/2026
DOB NOWGeneral ConstructionPermit IssuedOvertone Consulting & Con08/13/2026
DOB NOWMechanical SystemsPermit IssuedOvertone Consulting & Con08/13/2026
DOB NOWSignPermit IssuedService Sign Erectors Co07/21/2026
DOB NOWMechanical SystemsPermit IssuedOvertone Consulting & Con05/29/2026
DOB NOWGeneral ConstructionPermit IssuedOvertone Consulting & Con05/27/2026
DOB NOWSprinklersPermit IssuedHenry Myers P & H05/11/2026
DOB NOWPlumbingSigned-offHenry Myers P & H03/23/2026
DOB NOWMechanical SystemsPermit IssuedOvertone Consulting & Con03/11/2026
DOB NOWGeneral ConstructionPermit IssuedOvertone Consulting & Con03/11/2026
DOB NOWMechanical SystemsPermit IssuedRicardo's Mechanical09/24/2025
DOB NOWSignSigned-offSigns Cad08/15/2025
DOB NOWSignSigned-offSigns Cad08/15/2025
DOB NOWPlumbingSigned-offPipe Rite06/12/2025
DOB NOWGeneral ConstructionSigned-offEJ York06/09/2025
DOB NOWSupported ScaffoldSigned-offJem Contracting12/11/2024
DOB NOWGeneral ConstructionPermit IssuedOn Star Management12/05/2024
DOB NOWBoiler EquipmentSigned-offJack Piccini11/25/2024
DOB NOWPlumbingSigned-offBest Mechanical Services11/20/2024
DOB NOWCurb CutSigned-offOn Star Management11/15/2024
DOB NOWCurb CutSigned-offOn Star Management11/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offOn Star Management02/20/2024
DOB NOWSprinklersSigned-offSafety Fire Sprinkler02/15/2024
DOB NOWStandpipeSigned-offSafety Fire Sprinkler02/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems02/05/2024
DOB NOWConstruction FenceSigned-offOn Star Management02/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems01/25/2024
DOB NOWMechanical SystemsSigned-offOn Star Management01/22/2024
DOB NOWMechanical SystemsSigned-offMNK Enterprises NY01/22/2024
DOB NOWSupported ScaffoldSigned-offJem Contracting01/19/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems01/05/2024
DOB NOWStandpipeSigned-offSafety Fire Sprinkler12/22/2023
DOB NOWStructuralSigned-offOn Star Management12/21/2023
DOB NOWEarth WorkSigned-offOn Star Management12/21/2023
DOB NOWGeneral ConstructionPermit IssuedOn Star Management12/21/2023
DOB NOWPlumbingSigned-offBest Mechanical Services11/28/2023
DOB NOWSupport of ExcavationSigned-offOn Star Management03/27/2023
DOB NOWEarth WorkSigned-offOn Star Management05/26/2022
2 projects · most recent 09/22/2026
Ventilation Systems Generators Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/22/2026Permit IssuedOn Star ManagementGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
General Electric AZ-45E15DAB 14,100 BTU · Ptac ×273
AZ-45E09DAB 9,600 BTU · Ptac ×250
AZ-45E12DAB 11,600 BTU · Ptac ×134
Mitsubishi Electric PURY-P144TNU-A 144,000 BTU · Vrf Outdoor ×7
PUHY-P168TNU-A 168,000 BTU · Vrf Outdoor ×4
PURY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×4
PURY-P168TNU-A 168,000 BTU · Vrf Outdoor ×3
PUZ-A24NHA7 24,000 BTU · Heat Pump Outdoor ×2
Nortek A-1-15E PA-1-09E-WX-1IG-1000-ACCU0404-X-P 499,700 BTU ×1
Ventilation
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×13
LGH-F470RVX2-E 470 CFM · Erv ×6
LGH-F300RVX2-E 300 CFM · Erv ×2
Generators
Gillette SPVD-5000-60 500 kW · Generator ×1
04/07/2025Permit IssuedRicardo's MechanicalAir Conditioning Systems, Ventilation Systems
Ventilation
Panasonic WHISPER CEILING 85 75 CFM ×2
Cooling
__Junk__ TPEFYP048MA144A, TPEFYP018MA145A & TPLFYP005FM140B 60,000 BTU · Ahu ×8
2 projects · most recent 09/24/2026
Sprinkler System
FiledStatusContractorScope
09/24/2026Permit IssuedKG SprinklerSprinkler System
09/22/2026Signed-offSafety Fire SprinklerSprinkler System
2 projects · most recent 09/24/2026
Water/Sanitary
FiledStatusContractorScope
09/24/2026Signed-offHenry Myers P & HWater/Sanitary
04/07/2025Signed-offPipe RiteWater/Sanitary
14 projects · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026Permit IssuedHV ElectricGeneral Wiring
02/03/2026Permit IssuedTFK Electric1 meters, 1 new_meters
12/18/2025Permit IssuedWire Up Electrical Cont'g280 meters, 280 new_meters
09/10/2025CompleteSigns Cad—
09/10/2025CompleteSigns Cad—
06/27/2025CompleteCobra Electrical NYCGeneral Wiring
09/17/2024Permit IssuedStar Electrical Contractors—
04/12/2024Permit IssuedStar Electrical Contractors—
02/22/2024Permit IssuedTFK ElectricGeneral Wiring
02/21/2024Permit IssuedTFK Electric—
01/23/2024CompleteSolas Electrical—
01/12/2024CompleteSolas Electrical—
08/18/2023Permit IssuedTFK Electric—
05/30/2023Permit IssuedTFK Electric—
1 project · most recent 09/22/2026
Concrete
FiledStatusContractorScope
09/22/2026Permit IssuedOn Star ManagementConcrete
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
08/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/11/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/11/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/27/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
11/27/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/23/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
02/23/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/04/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/04/2026HVAC-R and service water piping design and insulationPAUL DENISenergy_progress
09/04/2026Tenant Protection Plan Compliance—special
08/18/2026Public Assembly Emergency LightingDaniel Henkelprogress
08/11/2026Tenant Protection Plan Compliance—special
08/11/2026Sprinkler SystemsEUGENE BIFULCOspecial
07/28/2026Air barrier continuity plan testingFAHAD FATEHenergy_progress
07/28/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
07/28/2026Interior lighting powerFAHAD FATEHenergy_progress
07/28/2026Fenestration air leakageFAHAD FATEHenergy_progress
07/28/2026Fenestration areasFAHAD FATEHenergy_progress
07/28/2026Exterior lighting powerFAHAD FATEHenergy_progress
07/28/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/28/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
07/28/2026VestibulesFAHAD FATEHenergy_progress
07/28/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/28/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
07/28/2026Sprayed fire-resistant materialsFAHAD FATEHspecial
07/28/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/28/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
07/28/2026Lighting controlsFAHAD FATEHenergy_progress
07/28/2026Maintenance informationFAHAD FATEHenergy_progress
07/28/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/28/2026MeteringFAHAD FATEHenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CrunchFitness / Recreation—
Project M01421592 Alteration · Permit Entire · 07/16/2026
Ponce BankBank / Financial branchFloor 1
Project M01253246 Alteration · LOC Issued · 08/14/2025
Project M01253252 Alteration · LOC Issued · 08/14/2025
Project M01198383 Alteration · Permit Entire · 03/26/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 354 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch45
09/02/2026M00677397-P2Request digital key ↗
09/02/2026M00677397-P1Request digital key ↗
09/02/2026M00677397-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits15
▸DOB NOWHPD - Permit Notice8
10/05/2026M00666777-A4Open ↗
08/26/2026M00666777-A3Open ↗
08/26/2026M00666777-P3Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
12/04/2025124057082Open ↗
11/13/2024141022373Open ↗
02/15/2024141022373Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/22/2024141022373Open ↗
01/02/2024141022373Open ↗
▸Zoning, Tax Lot & Property Records25
▸DOB NOWZD1: DOB Zoning Diagram9
08/26/2026M00666777-I1Open ↗
08/26/2026M00666777-A2Open ↗
08/26/2026M00666777-A4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/26/2026M00666777-P9Open ↗
08/26/2026M00666777-A4Open ↗
08/26/2026M00666777-A2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/26/2026M00666777-A4Open ↗
08/26/2026M00666777-A3Open ↗
08/26/2026M00666777-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/22/2025124057082Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/22/2025124057082Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/22/2025124057082Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications133
▸DOB NOWDPL-1: Design Professional Seal & Signature46
10/05/2026M01141098-P2Open ↗
09/02/2026M00677397-P2Open ↗
09/02/2026M00677397-P1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
10/05/2026M00666777-A4Open ↗
10/05/2026M00666777-A4Open ↗
10/05/2026M01141098-P2Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature42
10/05/2026M00666777-A4Open ↗
10/05/2026M00666777-A4Open ↗
10/05/2026M01141098-P2Open ↗
Showing 3 of 42 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/02/2024141022373Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/02/2024141022373Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/26/2026M00666777-I1Open ↗
08/26/2026M00666777-P2Open ↗
08/26/2026M00666777-A2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/26/2026M00666777-I1—
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist8
08/26/2026M00666777-I1Open ↗
08/26/2026M00666777-P2Open ↗
08/26/2026M00666777-P9Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST2
12/05/2024141022373Open ↗
01/02/2024141022373Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/25/2024141022373Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/02/2024141022373Open ↗
▸BISSTREET TREES SITE PLAN1
11/25/2024141022373Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos51
▸DOB NOWOER: Notice to Proceed37
10/05/2026M00666777-A4Open ↗
10/05/2026M01141098-P2Open ↗
09/02/2026M00677397-P2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
10/05/2026M00666777-A4Open ↗
09/02/2026M00677397-I1Open ↗
09/02/2026M00677397-I1Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
02/22/2024141022373Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00677397-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports7
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR5 Test Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/22/2025124057082Open ↗
12/22/2025124057082Open ↗
12/22/2025124057082Open ↗
Showing 3 of 4 on file for this type
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
01/02/2024141022373Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/05/2024141022373Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
12/02/2024141022373Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
12/05/2024141022373Open ↗
11/19/2024141022373Open ↗
02/22/2024141022373Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
12/04/2025124057082Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/02/2024141022373Open ↗
▸Other Documents36
▸DOB NOWSite Survey: Initial8
08/26/2026M00666777-A4Open ↗
08/26/2026M00666777-A2Open ↗
08/26/2026M00666777-P9Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/26/2026M00666777-P3Open ↗
08/26/2026M00666777-A4Open ↗
08/26/2026M00666777-A2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification8
08/26/2026M00666777-A4Open ↗
08/26/2026M00666777-A2Open ↗
08/26/2026M00666777-P9Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHPD - Completion Notice2
08/26/2026M00666777-I1Open ↗
08/26/2026M00666777-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/05/2024141022373Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
12/05/2024141022373Open ↗
▸BISPLOT DIAGRAM1
12/22/2025124057082Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type