← Back
Converted dwellings or rooming house
389 MANHATTAN AVENUE
MANHATTAN · Harlem (South) · BIN 1059047
💬 Discuss this project
1901Year Built
4Stories
C5Building Class
R7AZoning
2,547 sfGross Floor Area
11Units
0 Open Violations
Converted dwellings or rooming house · Owner of record: HARLEM CONGREGATIONS FOR COMMUNITY IMPRO VEMENT INC · 1,682 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof13p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Penthouse13p · 1 filing · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HHLA VENTURE I3207/08/2026
HHLA VENTURE 1403/21/2026
THE PEOPLES COMMUNITY TEMPLE INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A.S.III DESIGN STUDIO1110/20/2025
PAUL G. JONES, P.E.107/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROFESSIONAL SOLUTIONS903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor607/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor204/09/2026
F.S. WORKS INCFire Protection107/08/2026
CCS. CUSTOM CONSTRUCTIONGeneral Contractor107/08/2026
P.H. WORKS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE20501110/20/2025
Building Lifecycle
All (87)Filed (12)Permit Issued (11)Signed Off (4)Violation (23)Inspection (7)Special Inspection (30)
11/10/2025
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
11/10/2025
Special inspection requirement — Exterior lighting power
PAUL MARINO
11/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
11/10/2025
Special inspection requirement — Vestibules
PAUL MARINO
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
11/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
PAUL MARINO
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
11/10/2025
Special inspection requirement — Insulation placement and R values
PAUL MARINO
11/10/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
11/10/2025
Special inspection requirement — Lighting controls
PAUL MARINO
11/10/2025
Special inspection requirement — Shutoff dampers
PAUL MARINO
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
11/10/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
11/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
11/10/2025
Special inspection requirement — Final
ALBERT SMITH III
11/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
11/10/2025
Special inspection requirement — Structural Steel - Details
PAUL MARINO
11/10/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
11/10/2025
Special inspection requirement — Maintenance information
PAUL MARINO
11/10/2025
Special inspection requirement — Interior lighting power
PAUL MARINO
11/10/2025
Special inspection requirement — Mechanical Systems
PAUL MARINO
11/10/2025
Special inspection requirement — Masonry
PAUL MARINO
11/10/2025
Special inspection requirement — Metering
PAUL MARINO
10/20/2025
Filed — Alteration CO
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
M00677925-P2
10/20/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
10/20/2025
Special inspection requirement — Mechanical Systems
PAUL MARINO
10/20/2025
Special inspection requirement — Structural Steel - Details
PAUL MARINO
10/20/2025
Special inspection requirement — Metering
PAUL MARINO
02/20/2025
Signed off — Alteration
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00677942-I1
02/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/01/2024
Filed — Alteration CO
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
M00677925-P1
09/26/2024
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00677942-P5
09/13/2024
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00677942-P4
08/20/2024
Signed off — Alteration
FILING TO REMOVE AND REPLACE DRY ROTTED, CRACKED, AND/OR EXCESSIVELY NOTCHED AND DEFLECTED WOOD BEAMS, AS WELL AS REMOVE THE BADLY DAMAGED AND UNSAFE WOOD STAIRS AND INSTALL A TEMPORARY CONSTRUCTION STAIR (CELLAR TO 3RD FL) TO ALLOW ACCESS.
M08035092-I1
08/16/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2024
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00677942-P3
03/27/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M00900196-I1
03/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/21/2024
Permit issued — Structural
M08035092-I1-ST
02/21/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/06/2024
Permit issued — Structural
M00677925-I1-GC-CX
01/11/2024
Permit issued — Sprinklers
M00677942-I1-EW-SP
11/13/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/31/2023
Permit issued — Plumbing
M00677942-I1-PL
10/17/2023
Permit issued — Mechanical Systems
M00677925-I1-GC-CX
08/31/2023
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00677942-P2
07/07/2023
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M00900196-I1
07/07/2023
Permit issued — Sidewalk Shed
M00900196-I1-SH
07/07/2023
Permit issued — Sidewalk Shed
M00900196-I1-SF
05/31/2023
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00677942-P1
05/23/2023
Permit issued — General Construction
M00677925-I1-GC-CX
02/24/2023
Permit issued — Structural
M08035092-I1-ST
12/08/2022
Permit issued — Structural
M08035092-I1-ST
11/04/2022
Filed — Alteration
FILING TO REMOVE AND REPLACE DRY ROTTED, CRACKED, AND/OR EXCESSIVELY NOTCHED AND DEFLECTED WOOD BEAMS, AS WELL AS REMOVE THE BADLY DAMAGED AND UNSAFE WOOD STAIRS AND INSTALL A TEMPORARY CONSTRUCTION STAIR (CELLAR TO 3RD FL) TO ALLOW ACCESS.
M08035092-I1
09/27/2022
Signed off — Alteration
REMOVE EXISTING PLASTER AND LATH FROM EXISTING PARTITIONS AND CEILINGS (ALL FLOORS). REMOVE FINISHES AND LATH AT EXTERIOR MASONRY WALLS. REMOVE ALL PLUMBING FIXTURES.
M00707251-I1
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR02/21/2024
DOB NOWStructuralPermit IssuedMETHOD GENERAL CONTRACTOR02/06/2024
DOB NOWSprinklersSigned-offF.S. WORKS INC01/11/2024
DOB NOWPlumbingSigned-offP.H. WORKS INC10/31/2023
DOB NOWMechanical SystemsPermit IssuedMETHOD GENERAL CONTRACTOR10/17/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/07/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/07/2023
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR05/23/2023
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR02/24/2023
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR12/08/2022
DOB NOWGeneral ConstructionSigned-offCCS. CUSTOM CONSTRUCTION07/25/2022
2 projects · most recent 09/03/2024
General Wiring
FiledStatusContractorScope
09/03/2024CompleteMETHOD ELECTRIC LLCGeneral Wiring
07/09/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 10/20/2025
Steel Masonry Wood
FiledStatusContractorScope
10/20/2025Permit IssuedMETHOD GENERAL CONTRACTORSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/16/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/21/2024Pass-Final PL - UndergroundPassView ↗
11/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
11/10/2025MasonryPAUL MARINOspecial
11/10/2025Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
11/10/2025Energy Code Compliance InspectionsPAUL MARINOprogress
11/10/2025FinalALBERT SMITH IIIprogress
11/10/2025Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/10/2025Insulation placement and R valuesPAUL MARINOenergy_progress
11/10/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
11/10/2025Fenestration air leakagePAUL MARINOenergy_progress
11/10/2025Fenestration areasPAUL MARINOenergy_progress
11/10/2025Maintenance informationPAUL MARINOenergy_progress
11/10/2025Interior lighting powerPAUL MARINOenergy_progress
11/10/2025Lighting controlsPAUL MARINOenergy_progress
11/10/2025VestibulesPAUL MARINOenergy_progress
11/10/2025Air barrier - visual inspectionPAUL MARINOenergy_progress
11/10/2025Shutoff dampersPAUL MARINOenergy_progress
11/10/2025MeteringPAUL MARINOenergy_progress
11/10/2025HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
11/10/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
11/10/2025Duct leakage testing, insulation and designPAUL MARINOenergy_progress
11/10/2025HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
11/10/2025HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
11/10/2025Exterior lighting powerPAUL MARINOenergy_progress
11/10/2025Structural Steel - DetailsPAUL MARINOspecial
11/10/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/10/2025Mechanical SystemsPAUL MARINOspecial
Latest 25 of 101.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026M00707251-I1Request digital key ↗
09/01/2026M08035092-I1Request digital key ↗
08/30/2026M00900196-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026M00677925-I1Open ↗
08/13/2026M00677925-P1Open ↗
08/13/2026M00677925-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026M00677925-I1Open ↗
08/13/2026M00677925-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00677925-I1Open ↗
▸Seals & Professional Certifications74
▸DOB NOWProgress Inspector Seal & Signature43
09/02/2026M08035092-I1Open ↗
08/29/2026M00677942-I1Open ↗
08/29/2026M00677942-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026M08035092-I1Open ↗
08/29/2026M00677942-I1Open ↗
08/28/2026M00677925-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026M08035092-I1Open ↗
08/30/2026M00900196-I1Open ↗
08/26/2026M00677942-P1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026M00677925-I1Open ↗
08/13/2026M00677925-P1Open ↗
08/13/2026M00677925-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026M08035092-I1Open ↗
08/13/2026M00707251-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026M00677942-I1Open ↗
08/21/2026M00677925-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00677942-I1Open ↗
08/13/2026M00677925-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026M00677925-I1Open ↗
08/13/2026M00677925-P1Open ↗
08/13/2026M00677925-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00677925-I1Open ↗
08/13/2026M00677925-P1Open ↗
08/13/2026M00677925-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026M00677925-P2Open ↗
08/13/2026M00677925-P1Open ↗
08/13/2026M00677925-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026M00677925-I1Open ↗
08/21/2026M00677925-P2Open ↗
08/21/2026M00677925-P1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00677925-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00677925-I1Open ↗