Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof13p · 2 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
On file for this project
85 documents · 4 drawing sheets
REMOVE EXISTING PLASTER AND LATH FROM EXISTING PARTITIONS AND CEILINGS (ALL FLOORS). REMOVE FINISHES AND LATH AT EXTERIOR MASONRY WALLS. REMOVE ALL PLUMBING FIXTURES.
On file for this project
3 documents · 2 drawing sheets
Bulkhead1p · 1 filing · 20 docs
Plumbing
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
On file for this project
23 documents · 1 drawing sheet
PenthouseUnit PH3B13p · 1 filing · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
On file for this project
85 documents · 1 drawing sheet
Floor 5Heavy duty sidewalk shed and pipe scaffold installation7p · 1 filing · 2 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
2 documents
Floor 4Heavy duty sidewalk shed and pipe scaffold installation22p · 2 filings · 20 docs
EquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Supported Scaffold
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
On file for this project
23 documents
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
2 documents
Floor 3Heavy duty sidewalk shed and pipe scaffold installation13p · 5 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
FILING TO REMOVE AND REPLACE DRY ROTTED, CRACKED, AND/OR EXCESSIVELY NOTCHED AND DEFLECTED WOOD BEAMS, AS WELL AS REMOVE THE BADLY DAMAGED AND UNSAFE WOOD STAIRS AND INSTALL A TEMPORARY CONSTRUCTION STAIR (CELLAR TO 3RD FL) TO ALLOW ACCESS.
On file for this project
5 documents
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
On file for this project
85 documents · 1 drawing sheet
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
On file for this project
23 documents
Latest 3 of 5 filings on this floor.
Floor 2Heavy duty sidewalk shed and pipe scaffold installation13p · 5 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
FILING TO REMOVE AND REPLACE DRY ROTTED, CRACKED, AND/OR EXCESSIVELY NOTCHED AND DEFLECTED WOOD BEAMS, AS WELL AS REMOVE THE BADLY DAMAGED AND UNSAFE WOOD STAIRS AND INSTALL A TEMPORARY CONSTRUCTION STAIR (CELLAR TO 3RD FL) TO ALLOW ACCESS.
On file for this project
5 documents
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
On file for this project
85 documents · 1 drawing sheet
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
On file for this project
23 documents
Latest 3 of 5 filings on this floor.
Floor 1Heavy duty sidewalk shed and pipe scaffold installation13p · 5 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
FILING TO REMOVE AND REPLACE DRY ROTTED, CRACKED, AND/OR EXCESSIVELY NOTCHED AND DEFLECTED WOOD BEAMS, AS WELL AS REMOVE THE BADLY DAMAGED AND UNSAFE WOOD STAIRS AND INSTALL A TEMPORARY CONSTRUCTION STAIR (CELLAR TO 3RD FL) TO ALLOW ACCESS.
On file for this project
5 documents
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
On file for this project
85 documents · 4 drawing sheets
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
On file for this project
23 documents
Latest 3 of 5 filings on this floor.
Cellar13p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
FILING TO REMOVE AND REPLACE DRY ROTTED, CRACKED, AND/OR EXCESSIVELY NOTCHED AND DEFLECTED WOOD BEAMS, AS WELL AS REMOVE THE BADLY DAMAGED AND UNSAFE WOOD STAIRS AND INSTALL A TEMPORARY CONSTRUCTION STAIR (CELLAR TO 3RD FL) TO ALLOW ACCESS.
On file for this project
5 documents
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO ONE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
On file for this project
85 documents · 3 drawing sheets
REPLACE EXISTING WATER, WASTE, AND INTERIOR HOUSE DRAIN LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Site & exteriorHeavy duty sidewalk shed and pipe scaffold installation12p · 2 filings · 5 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sidewalk Shed
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
2 documents · 7 drawing sheets
REMOVE EXISTING PLASTER AND LATH FROM EXISTING PARTITIONS AND CEILINGS (ALL FLOORS). REMOVE FINISHES AND LATH AT EXTERIOR MASONRY WALLS. REMOVE ALL PLUMBING FIXTURES.
On file for this project
3 documents · 8 drawing sheets