← Back
Factory, industrial, miscellaneous
389 RIDER AVENUE
BRONX · BIN 2000992
💬 Discuss this project
1931Year Built
5Stories
F9Building Class
M1-2Zoning
31,250 sfGross Floor Area
5Units
LL97 Covered3 Open Violations ▸
Factory, industrial, miscellaneous · Owner of record: MARKLAND 388 LLC · 6,250 sf lot · 5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof6p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 43p · 2 filings · 20 docs
Floor 32p · 1 filing · 3 docs
Floor 27p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARKLAND 388 LLC2307/08/2026
MPM 651707/08/2026
RELIABLE ENTERPRISES1503/22/2026
CITI 2 GENERAL CONSTRUCTI303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2016$4.0M—— → —$128/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING403/21/2026
MICHAEL MUROFF ARCHITECT LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor1203/21/2026
CITI 2 GENERAL CONST INCGeneral Contractor607/08/2026
ELECTRO PUENTES LINK WIREGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
VIALVA, JOSEPHElectrical103/21/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
BECKER, CHARLESElectrical103/21/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
FILARDI, JAMESElectrical103/21/2026
HOWARD ZAMKOFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803901/05/2023
KM CONSULTING NY, INC.5305203/21/2022
STRUCTURAL ENGINEERING &5699110/06/2020
Building Lifecycle
All (105)Filed (15)Permit Issued (11)Signed Off (6)Violation (18)Inspection (5)Objection (20)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/09/2025
Signed off — Alteration
THE WORK CONSISTS OF STRUCTURAL REPAIR OF BRICKWORK, WOOD JOIST REPLACEMENT AND PARTIAL PARAPET REPLACEMENT. FILED IN CONJUNCTION WITH ALT 2 #240287166.
X00395804-I1
07/03/2025
Signed off — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-I1
07/02/2025
Signed off — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-S3
07/02/2025
Signed off — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-S2
05/29/2025
Signed off — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-S1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/05/2023
Filed — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-P6
01/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
01/05/2023
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
01/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
01/05/2023
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
01/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
01/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/09/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
11/09/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
11/09/2022
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
10/28/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Scope
10/11/2022
Filed — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-P5
10/10/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/10/2022
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
10/10/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
10/10/2022
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
10/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/08/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/23/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/08/2022
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
06/08/2022
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
06/08/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
06/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
06/08/2022
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
06/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/01/2022
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
05/06/2022
Filed — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-P2
05/06/2022
Filed — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-P4
05/06/2022
Filed — Alteration
FILING FOR THE MODIFICATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH GC #X00506853. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00506853-P3
05/04/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/04/2022
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/03/2022
Signed off — Alteration
Carrier: T-Mobile. Herewith filing this post-approval amendment to install the telecom platform. Relocate (2) existing cabinets from 10X10 FRP grating w/ W6 Dunnage & 1/2" rubber mat to new telecom platform. Relocate (2) existing cable trays along the rf.
X00501282-I1
04/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/25/2022
Permit issued — Plumbing
X00506853-S2-PL
03/25/2022
Permit issued — Sprinklers
X00506853-S1-EW-SP
03/22/2022
Permit issued — General Construction
X00506853-I1-GC
03/22/2022
Permit issued — Mechanical Systems
X00506853-S3-MS
03/21/2022
Filed — Alteration
Carrier: T-Mobile. Herewith filing this post-approval amendment to install the telecom platform. Relocate (2) existing cabinets from 10X10 FRP grating w/ W6 Dunnage & 1/2" rubber mat to new telecom platform. Relocate (2) existing cable trays along the rf.
X00501282-P1
03/19/2022
Permit issued — Sidewalk Shed
X00479870-I1-SH
03/19/2022
Permit issued — Supported Scaffold
X00479875-I1-SF
03/15/2022
Violation issued (ECB, closed)
Construction
03/15/2022
Violation issued (ECB, closed)
Construction
03/15/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP03/25/2022
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR03/25/2022
DOB NOWGeneral ConstructionSigned-offCITI 2 GENERAL CONST INC03/22/2022
DOB NOWMechanical SystemsSigned-offCITI 2 GENERAL CONST INC03/22/2022
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC03/19/2022
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC03/19/2022
DOB NOWStructuralSigned-offCITI 2 GENERAL CONST INC12/30/2021
DOB NOWAntennaSigned-offELECTRO PUENTES LINK WIRE04/20/2021
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC03/04/2021
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC03/04/2021
DOB NOWStructuralSigned-offCITI 2 GENERAL CONST INC01/21/2021
BISOTISSUEDCITI 2 GENERAL CONST INC10/19/2022
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/05/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC12/08/2014
BISOTISSUEDVERTICAL SOLUTIONS INC07/14/2005
BISOTISSUEDL & C BURNER SERVICE INC.04/13/1992
BISBLISSUEDL & C BURNER SERVICE INC.12/18/1990
3 projects · most recent 04/16/2024
General Wiring
FiledStatusContractorScope
04/16/2024CompleteLINA ELECTRIC, CORPGeneral Wiring
05/04/2022Permit IssuedSTAR ELEC'L CONTRACTORS C—
03/03/2021Permit IssuedRICHARD NEU—
2 projects · most recent 03/04/2021
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/04/2021Permit IssuedRELIABLE ENTERPRISES INCScaffold
03/03/2021Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
01/05/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/05/2023Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/05/2023HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
01/05/2023Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/05/2023HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/05/2023HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
11/09/2022Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/09/2022FinalSAMI HAJJAR P.Eprogress
11/09/2022Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/09/2022Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
11/09/2022Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
10/10/2022Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/10/2022Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
10/10/2022FinalSAMI HAJJAR P.Eprogress
10/10/2022Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
10/10/2022Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
06/08/2022Maintenance informationSAMI HAJJAR P.Eenergy_progress
06/08/2022Mechanical SystemsSAMI HAJJAR P.Especial
06/08/2022FinalSAMI HAJJAR P.Eprogress
06/08/2022HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/08/2022HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
06/08/2022Shutoff dampersSAMI HAJJAR P.Eenergy_progress
06/08/2022HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/01/2022Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
06/01/2022Sprinkler SystemsSAMI HAJJAR P.Especial
Latest 25 of 45.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
08/25/2026X00479870-I1Request digital key ↗
08/25/2026X00479875-I1Request digital key ↗
08/25/2026X00501282-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/15/2026X00395804-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
09/30/2020240287186Open ↗
10/26/2018220415067Open ↗
10/16/2018220415067Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
10/19/2022240287186Open ↗
03/12/2015220415067Open ↗
12/10/2014220415067Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00395804-I1Open ↗
08/25/2026X00479870-I1Open ↗
08/25/2026X00479875-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026X00506853-I1Open ↗
08/31/2026X00506853-I1Open ↗
08/31/2026X00506853-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026X00506853-P3Open ↗
08/31/2026X00506853-I1Open ↗
08/28/2026X00506853-S3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/17/2019220415067Open ↗
12/10/2014220415067Open ↗
12/04/2014220415067Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/30/2020240287186Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2020240287186Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026X00501282-I1Open ↗
08/25/2026X00501282-P1Open ↗
08/24/2026X00506853-P2Open ↗
Showing 3 of 12 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
12/04/2014220415067Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/30/2020240287186Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026X00395804-I1Open ↗
▸Energy Compliance12
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026X00506853-I1Open ↗
08/13/2026X00506853-S2Open ↗
08/13/2026X00506853-S3Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/17/2019220415067Open ↗
12/04/2014220415067Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/13/2022240287186Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/09/2025240287186Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/09/2025240287186Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/30/2020240287186Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/17/2019220415067Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/09/2025240287186Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/27/2022240287186Open ↗
03/23/2021240287186Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/09/2025240287186Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/20/2025240287186Open ↗
01/17/2019220415067Open ↗
▸BISFINAL1
10/14/2025240287186Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
03/23/2021240287186Open ↗
01/17/2019220415067Open ↗
10/26/2018220415067Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/14/2025240287186Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
03/23/2021240287186Open ↗
11/07/2018220415067Open ↗
▸BISEFILING COVER SHEET1
12/04/2014220415067Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/30/2020240287186Open ↗
▸BISBOROUGH INTAKE FORM1
01/17/2019220415067Open ↗