Public elementary, junior or senior high
Virtual Innovators Academy
1534 EAST 233 STREET · BIN 2087375
💬 Discuss this project
1952Year Built
1Stories
W1Building Class
R4Zoning
7,860 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Public elementary, junior or senior high · Owner of record: CHURCH/BLESSED LADY · 44,000 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof14p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 125p · 4 filings · 20 docs
Basement11p · 4 filings · 20 docs
Sub-Basement16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ED3507/08/2026
CHURCH OF NATIVITY OF OUR BLESSED L304/09/2026
CHURCH/BLESSED LADY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.2103/21/2026
DSENY ENGINEERING SERVICES203/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
DLR GROUP103/21/2026
JM ZONING, LLC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORTE CONSTRUCTION CORPGeneral Contractor607/08/2026
ACS SYSTEM ASSOCIATES INC.General Contractor307/08/2026
JEFFREY SOLOMONElectrical103/21/2026
CRO-INTERNATIONAL INCGeneral Contractor107/08/2026
WDF INCGeneral Contractor104/09/2026
S & L PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171412/07/2022
ALAN MARGOLIN & ASSOC423109/30/2022
NEW YORK ENGINEERING ASSO851111/05/2019
Building Lifecycle
All (102)Filed (25)Permit Issued (12)Signed Off (10)Violation (16)Inspection (9)Special Inspection (30)
06/16/2025
Violation issued (FDNY_ORDER, closed)
06/16/2025
Violation issued (FDNY_ORDER, closed)
06/16/2025
Violation issued (FDNY_ORDER, closed)
06/16/2025
Violation issued (FDNY_ORDER, closed)
12/22/2023
Signed off — Alteration
TO PROVIDE FRESH AIR INTAKE VENT AT EXTERIOR WINDOW IN THE GAS METER ROOM (B09) IN THE BASEMENT LEVEL.
X00958760-I1
12/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/05/2023
Permit issued — General Construction
X00958760-I1-GC
11/27/2023
Filed — Alteration
TO PROVIDE FRESH AIR INTAKE VENT AT EXTERIOR WINDOW IN THE GAS METER ROOM (B09) IN THE BASEMENT LEVEL.
X00958760-I1
06/30/2023
Signed off — Alteration
HEREWITH FILING FACADE WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00791996-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2023
Signed off — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-I1
03/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/27/2023
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-A2
02/14/2023
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
02/14/2023
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
02/14/2023
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
01/17/2023
Signed off — Alteration
As-built EN submission
X00637156-I1
01/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/06/2023
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P9
01/04/2023
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
01/04/2023
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
01/04/2023
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
01/04/2023
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
01/03/2023
Signed off — Alteration
As-built EN submission
X00637156-S1
12/21/2022
Permit issued — Mechanical Systems
X00637156-S1-MS
12/13/2022
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P5
12/07/2022
Filed — Alteration
As-built EN submission
X00637156-S1
10/18/2022
Signed off — Alteration
PLAYGROUND SITEWORK
X00762679-I1
10/11/2022
Permit issued — General Construction
X00791996-I1-GC
10/05/2022
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P4
09/30/2022
Filed — Alteration
HEREWITH FILING FACADE WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00791996-I1
09/15/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
09/15/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MIKHAIL ZEYGMAN
09/15/2022
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
09/15/2022
Special inspection requirement — Final
MIKHAIL ZEYGMAN
09/14/2022
Filed — Alteration
PLAYGROUND SITEWORK
X00762679-P4
09/14/2022
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P3
09/14/2022
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
09/14/2022
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
09/14/2022
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
09/13/2022
Signed off — Alteration
X00733316-I1
09/09/2022
Signed off — Alteration
Herewith filing plumbing work type for 3K reno
X00637134-I1
09/09/2022
Signed off — Alteration
X00696473-I1
09/08/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
09/07/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Final
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Electrical motors and elevators
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Ventilation and air distribution system
MIKHAIL ZEYGMAN
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWDF INC12/05/2023
DOB NOWMechanical SystemsSigned-offACS SYSTEM ASSOCIATES INC.12/21/2022
DOB NOWGeneral ConstructionSigned-offCRO-INTERNATIONAL INC10/11/2022
DOB NOWEarth WorkSigned-offFORTE CONSTRUCTION CORP08/19/2022
DOB NOWEarth WorkSigned-offFORTE CONSTRUCTION CORP08/09/2022
DOB NOWStructuralSigned-offFORTE CONSTRUCTION CORP05/25/2022
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.05/04/2022
DOB NOWConstruction FenceSigned-offFORTE CONSTRUCTION CORP05/04/2022
DOB NOWPlumbingSigned-offS & L PLUMBING & HEATING04/15/2022
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.04/15/2022
DOB NOWGeneral ConstructionSigned-offFORTE CONSTRUCTION CORP03/10/2022
DOB NOWBoiler EquipmentPermit IssuedABILENE, INC11/07/2019
BIS—ISSUEDDLR GROUP ARCHITECT & ENGINEER06/16/2023
BISOTISSUEDNSC ABATEMENT SERVICES07/01/2020
BISFPISSUEDIDEAL FIRE CONTROL10/28/1993
BISFBISSUEDWAYWOLFF ASSOCIATES04/10/1992
3 projects · most recent 04/14/2022
General Wiring Boiler Controls
FiledStatusContractorScope
04/14/2022CompleteRMD ELECTRIC CORPGeneral Wiring
01/06/2020CompleteABILENE ELECTRIC INCBoiler Controls
11/05/2019CompleteABILENE ELECTRIC INC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/08/2022Pass-Final Fence Non-Directive 14PassView ↗
08/12/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/28/2022Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
06/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
02/14/2023Lighting controlsMIKHAIL ZEYGMANenergy_progress
02/14/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
02/14/2023Interior lighting powerMIKHAIL ZEYGMANenergy_progress
02/14/2023Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
01/04/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
01/04/2023Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
01/04/2023Interior lighting powerMIKHAIL ZEYGMANenergy_progress
01/04/2023Lighting controlsMIKHAIL ZEYGMANenergy_progress
09/15/2022Subgrade InspectionsMIKHAIL ZEYGMANspecial
09/15/2022Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
09/15/2022FinalMIKHAIL ZEYGMANprogress
09/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMIKHAIL ZEYGMANspecial
09/14/2022Interior lighting powerMIKHAIL ZEYGMANenergy_progress
09/14/2022Lighting controlsMIKHAIL ZEYGMANenergy_progress
09/14/2022Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
09/07/2022Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
09/07/2022FinalMIKHAIL ZEYGMANprogress
09/07/2022Subgrade InspectionsMIKHAIL ZEYGMANspecial
09/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMIKHAIL ZEYGMANspecial
09/07/2022Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
08/25/2022Interior lighting powerMIKHAIL ZEYGMANenergy_progress
08/25/2022HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
08/25/2022Shutoff dampersMIKHAIL ZEYGMANenergy_progress
08/25/2022Lighting controlsMIKHAIL ZEYGMANenergy_progress
08/25/2022Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
Latest 25 of 92.
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
08/24/2026X00637134-P1Request digital key ↗
08/24/2026X00637134-I1Request digital key ↗
08/24/2026X00637134-P2Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/26/2026X00246492-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION10
04/03/2024220741008Open ↗
04/01/2024220741008Open ↗
03/28/2024220741008Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION2
06/16/2023220741008Open ↗
07/01/2020220724269Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/26/2023220741008Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/04/2024220741008Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/04/2024220741008Open ↗
▸BISZONING DIAGRAM1
05/15/2023220741008Open ↗
▸Seals & Professional Certifications98
▸DOB NOWProgress Inspector Seal & Signature45
09/29/2026X00733316-I1Open ↗
09/23/2026X00637156-P2Open ↗
09/23/2026X00637156-P2Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/29/2026X00733316-I1Open ↗
09/23/2026X00637156-P2Open ↗
09/23/2026X00246492-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/24/2026X00637134-P1Open ↗
08/24/2026X00637134-P2Open ↗
08/24/2026X00637134-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/21/2020220724269Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/21/2020220724269Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/21/2020220724269Open ↗
▸Trade Schedules & Equipment1
▸BISFINAL PLUMBING SIGNOFF1
02/08/2024220741008Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
02/15/2022220741008Open ↗
▸BISSTREET TREE SIGNOFF1
01/08/2024220741008Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/24/2026X00637134-I1Open ↗
08/24/2026X00733316-I1Open ↗
08/24/2026X00637156-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X00791996-I1Open ↗
08/22/2026X00958760-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/01/2020220724269Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00637156-I1Open ↗
08/13/2026X00629481-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00629481-I1Open ↗
08/13/2026X00246492-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/15/2022220741008Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/04/2024220741008Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/21/2020220724269Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/07/2020220724269Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/15/2022220741008Open ↗
07/07/2020220724269Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/13/2026X00629481-P3Open ↗
08/13/2026X00637156-S1Open ↗
08/13/2026X00958760-I1Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/15/2023220741008Open ↗
05/15/2023220741008Open ↗
05/15/2023220741008Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
09/27/2023220741008Open ↗
04/07/2023220741008Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
02/08/2024220741008Open ↗
▸BISFINAL CONSTRUCTION SIGNOFF1
02/08/2024220741008Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/07/2020220724269Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/16/2023220741008Open ↗
07/07/2020220724269Open ↗
01/21/2020220724269Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/08/2024220741008Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
05/15/2023220741008Open ↗
02/15/2022220741008Open ↗
▸BISEFILING COVER SHEET2
12/15/2021220741008Open ↗
01/21/2020220724269Open ↗
▸Other Documents7
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll5
08/13/2026X00762679-I1Open ↗
08/13/2026X00762679-P1Open ↗
08/13/2026X00762679-P4Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM1
02/15/2022220741008Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00762679-I1Open ↗