← Back
BuildNYC
Public elementary, junior or senior high
Virtual Innovators Academy
3893 DYRE AVENUE · BIN 2087375
💬 Discuss this project
1952Year Built
1Stories
W1Building Class
R4Zoning
7,860 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: Church/Blessed Lady · 44,000 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVirtual Innovators Academy79p · 3 filings · 16 docs
Floor 2Virtual Innovators Academy78p · 3 filings · 16 docs
Floor 1Virtual Innovators Academy92p · 5 filings · 16 docs
BasementVirtual Innovators Academy18p · 5 filings · 19 docs
Sub-BasementVirtual Innovators Academy84p · 6 filings · 19 docs
Site & exteriorVirtual Innovators Academy10p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ED3507/08/2026
Church of Nativity of Our Blessed304/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants2103/21/2026
Dseny Engineering Services203/21/2026
New York & Company203/21/2026
DLR Group103/21/2026
Design 2147203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Forte ConstructionGeneral Contractor507/08/2026
ACS System AssociatesGeneral Contractor307/08/2026
Cro-InternationalGeneral Contractor107/08/2026
WDFGeneral Contractor104/09/2026
Forte ConstructionScaffold104/09/2026
S & L Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks3171412/07/2022
Alan Margolin & Associates423109/30/2022
New York Engineering Associates851111/05/2019
Building Lifecycle
All (103)Filed (25)Permit Issued (12)Signed Off (10)Violation (17)Inspection (9)Special Inspection (30)
05/20/2026
Violation issued (ECB, open)
Construction
06/16/2025
Violation issued (FDNY_ORDER, closed)
06/16/2025
Violation issued (FDNY_ORDER, closed)
06/16/2025
Violation issued (FDNY_ORDER, closed)
06/16/2025
Violation issued (FDNY_ORDER, closed)
12/22/2023
Signed off — Alteration
TO PROVIDE FRESH AIR INTAKE VENT AT EXTERIOR WINDOW IN THE GAS METER ROOM (B09) IN THE BASEMENT LEVEL.
X00958760-I1
12/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/05/2023
Permit issued — General Construction
X00958760-I1-GC
11/27/2023
Filed — Alteration
TO PROVIDE FRESH AIR INTAKE VENT AT EXTERIOR WINDOW IN THE GAS METER ROOM (B09) IN THE BASEMENT LEVEL.
X00958760-I1
06/30/2023
Signed off — Alteration
HEREWITH FILING FACADE WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00791996-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2023
Signed off — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-I1
03/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/27/2023
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-A2
02/14/2023
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
02/14/2023
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
02/14/2023
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
01/17/2023
Signed off — Alteration
As-built EN submission
X00637156-I1
01/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/06/2023
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P9
01/04/2023
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
01/04/2023
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
01/04/2023
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
01/04/2023
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
01/03/2023
Signed off — Alteration
As-built EN submission
X00637156-S1
12/21/2022
Permit issued — Mechanical Systems
X00637156-S1-MS
12/13/2022
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P5
12/07/2022
Filed — Alteration
As-built EN submission
X00637156-S1
10/18/2022
Signed off — Alteration
PLAYGROUND SITEWORK
X00762679-I1
10/11/2022
Permit issued — General Construction
X00791996-I1-GC
10/05/2022
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P4
09/30/2022
Filed — Alteration
HEREWITH FILING FACADE WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00791996-I1
09/15/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MIKHAIL ZEYGMAN
09/15/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
09/15/2022
Special inspection requirement — Final
MIKHAIL ZEYGMAN
09/15/2022
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
09/14/2022
Filed — Alteration
PLAYGROUND SITEWORK
X00762679-P4
09/14/2022
Filed — Alteration
210261 - HEREWITH FILING GENERAL CONSTURCTION WORK FOR 3K RENO
X00629481-P3
09/14/2022
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
09/14/2022
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
09/14/2022
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
09/13/2022
Signed off — Alteration
X00733316-I1
09/09/2022
Signed off — Alteration
X00696473-I1
09/09/2022
Signed off — Alteration
Herewith filing plumbing work type for 3K reno
X00637134-I1
09/08/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
09/07/2022
Special inspection requirement — Final
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
09/07/2022
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Ventilation and air distribution system
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Electrical motors and elevators
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Final
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
08/25/2022
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWDF12/05/2023
DOB NOWMechanical SystemsSigned-offACS System Associates12/21/2022
DOB NOWGeneral ConstructionSigned-offCro-International10/11/2022
DOB NOWEarth WorkSigned-offForte Construction08/19/2022
DOB NOWEarth WorkSigned-offForte Construction08/09/2022
DOB NOWStructuralSigned-offForte Construction05/25/2022
DOB NOWMechanical SystemsPermit IssuedACS System Associates05/04/2022
DOB NOWConstruction FenceSigned-offForte Construction05/04/2022
DOB NOWPlumbingSigned-offS & L Plumbing & Heating04/15/2022
DOB NOWMechanical SystemsPermit IssuedACS System Associates04/15/2022
DOB NOWGeneral ConstructionSigned-offForte Construction03/10/2022
DOB NOWBoiler EquipmentPermit IssuedAbilene11/07/2019
BIS—ISSUEDDLR Group Architect & Engineering06/16/2023
BISOTISSUEDNSC Abatement Services07/01/2020
BISFPISSUEDIdeal Fire Control10/28/1993
BISFBISSUEDWaywolff Associates04/10/1992
3 projects · most recent 04/14/2022
General Wiring Boiler Controls
FiledStatusContractorScope
04/14/2022CompleteRMD ElectricGeneral Wiring
01/06/2020CompleteAbilene ElectricBoiler Controls
11/05/2019CompleteAbilene Electric—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/08/2022Pass-Final Fence Non-Directive 14PassView ↗
08/12/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/28/2022Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
06/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
02/14/2023Lighting controlsMIKHAIL ZEYGMANenergy_progress
02/14/2023Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
02/14/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
02/14/2023Interior lighting powerMIKHAIL ZEYGMANenergy_progress
01/04/2023Lighting controlsMIKHAIL ZEYGMANenergy_progress
01/04/2023Interior lighting powerMIKHAIL ZEYGMANenergy_progress
01/04/2023Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
01/04/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
09/15/2022FinalMIKHAIL ZEYGMANprogress
09/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMIKHAIL ZEYGMANspecial
09/15/2022Subgrade InspectionsMIKHAIL ZEYGMANspecial
09/15/2022Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
09/14/2022Interior lighting powerMIKHAIL ZEYGMANenergy_progress
09/14/2022Lighting controlsMIKHAIL ZEYGMANenergy_progress
09/14/2022Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
09/07/2022FinalMIKHAIL ZEYGMANprogress
09/07/2022Subgrade InspectionsMIKHAIL ZEYGMANspecial
09/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMIKHAIL ZEYGMANspecial
09/07/2022Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
09/07/2022Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
08/25/2022Interior lighting powerMIKHAIL ZEYGMANenergy_progress
08/25/2022HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
08/25/2022Shutoff dampersMIKHAIL ZEYGMANenergy_progress
08/25/2022Lighting controlsMIKHAIL ZEYGMANenergy_progress
08/25/2022Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
Latest 25 of 92.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Virtual Innovators AcademyEducationEntire building
Project X00958760 Alteration · LOC Issued · 11/27/2023
Project X00791996 Alteration · LOC Issued · 09/30/2022
Project X00762679 Alteration · LOC Issued · 06/30/2022
Project X00733316 Alteration · LOC Issued · 05/12/2022
Project X00696473 Alteration · LOC Issued · 05/03/2022
Project X00637134 Alteration · LOC Issued · 01/07/2022
Project X00637156 Alteration · LOC Issued · 12/29/2021
Project X00629481 Alteration · LOC Issued · 12/17/2021
Project X00246492 Alteration · LOC Issued · 11/05/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
08/24/2026X00637134-P1Request digital key ↗
08/24/2026X00637134-I1Request digital key ↗
08/24/2026X00637134-P2Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/26/2026X00246492-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION10
04/03/2024220741008Open ↗
04/01/2024220741008Open ↗
03/28/2024220741008Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION2
06/16/2023220741008Open ↗
07/01/2020220724269Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/26/2023220741008Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/04/2024220741008Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/04/2024220741008Open ↗
▸BISZONING DIAGRAM1
05/15/2023220741008Open ↗
▸Seals & Professional Certifications98
▸DOB NOWProgress Inspector Seal & Signature45
09/29/2026X00733316-I1Open ↗
09/23/2026X00637156-P2Open ↗
09/23/2026X00637156-P2Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/29/2026X00733316-I1Open ↗
09/23/2026X00637156-P2Open ↗
09/23/2026X00246492-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/24/2026X00637134-P1Open ↗
08/24/2026X00637134-P2Open ↗
08/24/2026X00637134-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/21/2020220724269Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/21/2020220724269Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/21/2020220724269Open ↗
▸Trade Schedules & Equipment1
▸BISFINAL PLUMBING SIGNOFF1
02/08/2024220741008Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
02/15/2022220741008Open ↗
▸BISSTREET TREE SIGNOFF1
01/08/2024220741008Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/24/2026X00637134-I1Open ↗
08/24/2026X00733316-I1Open ↗
08/24/2026X00637156-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X00791996-I1Open ↗
08/22/2026X00958760-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/01/2020220724269Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00637156-I1Open ↗
08/13/2026X00629481-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00629481-I1Open ↗
08/13/2026X00246492-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/15/2022220741008Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/04/2024220741008Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/21/2020220724269Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/07/2020220724269Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/15/2022220741008Open ↗
07/07/2020220724269Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/13/2026X00629481-P3Open ↗
08/13/2026X00637156-S1Open ↗
08/13/2026X00958760-I1Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/15/2023220741008Open ↗
05/15/2023220741008Open ↗
05/15/2023220741008Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
09/27/2023220741008Open ↗
04/07/2023220741008Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
02/08/2024220741008Open ↗
▸BISFINAL CONSTRUCTION SIGNOFF1
02/08/2024220741008Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/07/2020220724269Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/16/2023220741008Open ↗
07/07/2020220724269Open ↗
01/21/2020220724269Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/08/2024220741008Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
05/15/2023220741008Open ↗
02/15/2022220741008Open ↗
▸BISEFILING COVER SHEET2
12/15/2021220741008Open ↗
01/21/2020220724269Open ↗
▸Other Documents7
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll5
08/13/2026X00762679-I1Open ↗
08/13/2026X00762679-P1Open ↗
08/13/2026X00762679-P4Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM1
02/15/2022220741008Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00762679-I1Open ↗