← Back
Two stories - detached, small or mid-size
3896 VICTORY BOULEVARD
STATEN ISLAND · BIN 5176265
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R3AZoning
1,560 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: VICEROY DEVELOPMENT LLC · 15,801 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction20p · 3 filings · 20 docs
Floor 1Under Construction22p · 3 filings · 20 docs
CellarUnder Construction21p · 3 filings · 20 docs
1 job · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025Permit IssuedCATELLO ELEC'L CONT., INCGeneral Wiring
1 job · most recent 07/02/2025
FiledStatusContractorScope
07/02/2025Permit IssuedMAXIMUM CONTRACTING INC1 scope_items
1 job · most recent 07/02/2025
Fence
FiledStatusContractorScope
07/02/2025Permit IssuedMAXIMUM CONTRACTING INCFence
Building Lifecycle
All (71)Filed (7)Permit Issued (8)Inspection (16)Objection (14)Special Inspection (26)
07/22/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2025
Permit issued — General Construction
S00913476-S3-FO
10/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Permit issued — Curb Cut
S00913476-S1-CC
10/01/2025
Permit issued — Construction Fence
S00913476-S2-FN
08/25/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/28/2025
Permit issued — Plumbing
S97585148-I1-PL
07/25/2025
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
07/25/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
07/25/2025
Special inspection requirement — Subgrade Inspections
Daniel Ryan
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
07/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
07/25/2025
Special inspection requirement — Interior lighting power
Daniel Ryan
07/25/2025
Special inspection requirement — Permanent certificate
Daniel Ryan
07/25/2025
Special inspection requirement — Metering
Daniel Ryan
07/25/2025
Special inspection requirement — Protection of exposed foundation insulation
Daniel Ryan
07/25/2025
Special inspection requirement — Fenestration air leakage
Daniel Ryan
07/25/2025
Special inspection requirement — Maintenance information
Daniel Ryan
07/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
07/25/2025
Special inspection requirement — Fenestration areas
Daniel Ryan
07/25/2025
Special inspection requirement — Electric vehicle service equipment requirements
Daniel Ryan
07/25/2025
Special inspection requirement — Air barrier — testing
Daniel Ryan
07/25/2025
Special inspection requirement — Insulation placement and R values
Daniel Ryan
07/25/2025
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
07/15/2025
Objection resolved — Addressed
07/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
07/14/2025
Special inspection requirement — Maintenance information
Daniel Ryan
07/11/2025
Objection raised — Scope
07/02/2025
Filed — Alteration
NEW BUILDING INSTALLATION OF NEW PLUMBING FIXTURES AND APPLICANCE FOR 2 FAMILY DETACHED 2 STORY AND CELLAR
S01053164-P1
07/02/2025
Filed — New Building
PROPOSED FOUNDATION FOR NEW BUILDING TWO STORY AND CELLAR TWO FAMILY
S00913476-P1
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
06/23/2025
Special inspection requirement — Maintenance information
Daniel Ryan
06/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2025
Objection raised — Scope
01/02/2025
Objection resolved — Addressed
12/30/2024
Filed — New Building
PROPOSED FOUNDATION FOR NEW BUILDING TWO STORY AND CELLAR TWO FAMILY
S00913476-S1
11/19/2024
Permit issued — Plumbing
S01053164-I1-PL
10/31/2024
Filed — Alteration
NEW BUILDING INSTALLATION OF NEW PLUMBING FIXTURES AND APPLICANCE FOR 2 FAMILY DETACHED 2 STORY AND CELLAR
S01053164-I1
10/16/2024
Permit issued — General Construction
S00913476-S3-GC
10/16/2024
Permit issued — General Construction
S00913476-I1-GC
09/19/2024
Permit issued — Construction Fence
S00913476-S2-FN
08/30/2024
Objection resolved — Addressed
08/15/2024
Filed — New Building
PROPOSED FOUNDATION FOR NEW BUILDING TWO STORY AND CELLAR TWO FAMILY
S00913476-S2
Latest 60 of 71 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAXIMUM CONTRACTING2407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE707/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor807/08/2026
CAPITAL CONTR P&H CORPPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159507/02/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC10/20/2025
DOB NOWCurb CutPermit IssuedMAXIMUM CONTRACTING INC10/02/2025
DOB NOWConstruction FencePermit IssuedMAXIMUM CONTRACTING INC10/01/2025
DOB NOWPlumbingPermit IssuedQUALITY PLUMBING, INC07/28/2025
DOB NOWPlumbingPermit IssuedCAPITAL CONTR P&H CORP11/19/2024
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC10/16/2024
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC10/16/2024
DOB NOWConstruction FencePermit IssuedMAXIMUM CONTRACTING INC09/19/2024
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/22/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/08/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/25/2025Concrete - Cast-In-PlaceDaniel Ryanspecial
07/25/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
07/25/2025Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
07/25/2025Subgrade InspectionsDaniel Ryanspecial
07/25/2025Energy Code Compliance InspectionsDaniel Ryanprogress
07/25/2025Fire-Resistance Rated ConstructionDaniel Ryanprogress
07/25/2025Interior lighting powerDaniel Ryanenergy_progress
07/25/2025Permanent certificateDaniel Ryanenergy_progress
07/25/2025MeteringDaniel Ryanenergy_progress
07/25/2025Protection of exposed foundation insulationDaniel Ryanenergy_progress
07/25/2025Fenestration air leakageDaniel Ryanenergy_progress
07/25/2025Maintenance informationDaniel Ryanenergy_progress
07/25/2025Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
07/25/2025Fenestration areasDaniel Ryanenergy_progress
07/25/2025Electric vehicle service equipment requirementsDaniel Ryanenergy_progress
07/25/2025Air barrier — testing Daniel Ryanenergy_progress
07/25/2025Insulation placement and R valuesDaniel Ryanenergy_progress
07/25/2025Air barrier - visual inspectionDaniel Ryanenergy_progress
07/14/2025HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
07/14/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
07/14/2025Energy Code Compliance InspectionsDaniel Ryanprogress
07/14/2025Maintenance informationDaniel Ryanenergy_progress
06/23/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
06/23/2025Energy Code Compliance InspectionsDaniel Ryanprogress
06/23/2025Maintenance informationDaniel Ryanenergy_progress
Latest 25 of 26.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026S00913476-P1Request digital key ↗
08/21/2026S00913476-S3Request digital key ↗
08/21/2026S00913476-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00913476-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026S01053164-I1Open ↗
09/01/2026S01053164-I1Open ↗
09/01/2026S01053164-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S00913476-I1Open ↗
08/13/2026S01053164-P1Open ↗
08/13/2026S00913476-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S01053164-I1Open ↗
08/26/2026S00913476-I1Open ↗
08/26/2026S00913476-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-P1Open ↗
08/13/2026S00913476-S3Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-S3Open ↗
08/13/2026S00913476-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026S00913476-I1Open ↗
08/13/2026S00913476-S3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00913476-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-P1Open ↗
08/13/2026S00913476-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00913476-I1Open ↗
08/13/2026S00913476-S3Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00913476-S3Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-S3Open ↗
08/13/2026S00913476-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-P1Open ↗
08/13/2026S00913476-S3Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S00913476-I1Open ↗
08/13/2026S00913476-P1Open ↗