← Back
Factory, industrial, miscellaneous
39-08 24 STREET
QUEENS · BIN 4004756
💬 Discuss this project
1942Year Built
2Stories
F9Building Class
M1-2Zoning
14,025 sfGross Floor Area
1Units
Factory, industrial, miscellaneous · Owner of record: 39-08 REALTY LLC · 9,375 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION404/09/2026
RAPID FAN & BLOWER INC.503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PANTEC ENGINEERING111/20/2023
QUEENS ENGINEERING111/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor304/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PANTEC ENGINEERING8543111/20/2023
Building Lifecycle
All (9)Filed (2)Permit Issued (2)Signed Off (2)Special Inspection (3)
02/06/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2020 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00964488-I1
02/15/2024
Signed off — Alteration
Repointing, brick replacement, and lintel replacement over garage entrance.
Q00956268-I1
11/22/2023
Permit issued — General Construction
Q00956268-I1-GC
11/20/2023
Filed — Alteration
Repointing, brick replacement, and lintel replacement over garage entrance.
Q00956268-I1
11/17/2023
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2020 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00964488-I1
11/17/2023
Permit issued — Sidewalk Shed
Q00964488-I1-SH
11/16/2023
Special inspection requirement — Masonry
PETER PANAGOPOULOS
11/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PETER PANAGOPOULOS
11/16/2023
Special inspection requirement — Final
PETER PANAGOPOULOS
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP11/22/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP11/17/2023
BISBLISSUEDALLISON A. HEANEY02/07/2012
2 jobs · most recent 06/02/2025
General Wiring
FiledStatusContractorScope
06/02/2025CancelledVERTEX ELECTRIC CORP.General Wiring
11/16/2023Permit IssuedTOWER ELECTRIC INC.—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/16/2023MasonryPETER PANAGOPOULOSspecial
11/16/2023Structural Stability – Alterations of existing buildingsPETER PANAGOPOULOSspecial
11/16/2023FinalPETER PANAGOPOULOSprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00964488-I1Request digital key ↗
08/23/2026Q00956268-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
02/08/2012420530312Open ↗
02/08/2012420530312Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/08/2012420530312Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/22/2016420530312Open ↗
02/08/2012420530312Open ↗
02/08/2012420530312Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00956268-I1Open ↗
08/13/2026Q00964488-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/29/2026Q00956268-I1Open ↗
09/29/2026Q00956268-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/08/2012420530312Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/08/2012420530312Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/29/2026Q00956268-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/08/2012420530312Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/08/2012420530312Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00956268-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY2
02/08/2012420530312Open ↗
02/08/2012420530312Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/22/2016420530312Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/22/2016420530312Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
02/08/2012420530312Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/22/2016420530312Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/08/2012420530312Open ↗