← Back
Elevator apt, fireproof with stores
39-11 QUEENS BOULEVARD
QUEENS · BIN 4605192
💬 Discuss this project
2019Year Built
8Stories
D6Building Class
R7AZoning
62,640 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized19 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 39 SUNNYSIDE OWNERS LLC · 9,000 sf lot · 6.96 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 1Under Construction3p · 3 filings · 20 docs
1 job · most recent 07/01/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2026Signed-offMANDARIN ENTPRSES II INCVentilation Systems
Ventilation
Mitsubishi Electric TLGHF060RVX02A 600 CFM · Erv ×1
1 job · most recent 07/01/2026
FiledStatusContractorScope
07/01/2026Signed-offRRP PLUMBING CORP16 heads
1 job · most recent 07/01/2026
Water/Sanitary
FiledStatusContractorScope
07/01/2026Permit IssuedTRI STATE PLBG & HTG INCWater/Sanitary
8 jobs · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026CompleteATMOS ELECTRIC SVCE CORPGeneral Wiring
04/07/2026CompleteATMOS ELECTRIC SVCE CORP—
02/13/2025CompleteBLU ELECTRICAL SVS INCGeneral Wiring
01/30/2025CompleteAURORA ELECL CONTG INC—
10/03/2022CompleteATMOS ELECTRIC SVCE CORPGeneral Wiring
07/07/2021CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
08/12/2020CompleteILLUMINOUS ELECTRIC CORP.—
01/14/2020CompleteELPO ELECTRICAL CONTG INC—
Building Lifecycle
All (227)Filed (36)Permit Issued (39)Signed Off (16)Violation (52)Inspection (20)Objection (34)Special Inspection (30)
08/28/2026
Signed off — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-S2
08/10/2026
Signed off — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-S3
07/31/2026
Permit issued — Mechanical Systems
Q01357649-S3-MS
07/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/01/2026
Filed — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-P2
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
07/01/2026
Special inspection requirement — Sprinkler Systems
MINA HANNA
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
06/29/2026
Special inspection requirement — Sprinkler Systems
MINA HANNA
06/23/2026
Signed off — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING "TIP - TOP" "BRAIN" "Unlock Your Inner Genius" "Logo"
Q01380870-I1
06/18/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2026
Permit issued — Plumbing
Q01357649-S1-PL
05/05/2026
Permit issued — Sprinklers
Q01357649-S2-EW-SP
04/22/2026
Permit issued — General Construction
Q01357649-I1-GC
04/08/2026
Filed — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING "TIP - TOP" "BRAIN" "Unlock Your Inner Genius" "Logo"
Q01380870-I1
04/08/2026
Permit issued — Sign
Q01380870-I1-SG
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
B
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
B
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, closed)
C
04/02/2026
Special inspection requirement — Final
JUSTIN KIM
03/30/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/24/2026
Objection raised — Admin
03/17/2026
Objection raised — Other
03/16/2026
Filed — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-P1
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
03/16/2026
Special inspection requirement — Final
MINA HANNA
03/06/2026
Filed — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-S2
03/06/2026
Filed — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-S3
03/06/2026
Filed — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-S1
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MINA HANNA
03/06/2026
Special inspection requirement — Maintenance information
MINA HANNA
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/11/2026
Filed — Alteration
Herewith filing for modifications to the existing sprinkler system on partial first floor in existing building.
Q01357649-I1
02/10/2026
Special inspection requirement — Final
MINA HANNA
02/10/2026
Special inspection requirement — Mechanical Systems
MINA HANNA
01/28/2026
Violation issued (HPD, open)
A
01/28/2026
Violation issued (HPD, open)
A
01/28/2026
Violation issued (HPD, open)
C
01/28/2026
Violation issued (HPD, open)
A
01/28/2026
Violation issued (HPD, open)
A
01/28/2026
Violation issued (HPD, open)
A
01/28/2026
Violation issued (HPD, open)
A
Latest 60 of 227 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIP-TOP BRAIN 21208/01/2026
RAM SHAM REALTY2307/08/2026
F45 SUNNYSIDE NY1307/08/2026
LEMX2307/08/2026
AKAM ASSOCIATES604/10/2026
39 SUNNYSIDE OWNERS1503/22/2026
MANDARIN ENTPRESES 11 INC503/22/2026
MONDARIN ENTERPRISES II I103/22/2026
JEZUSALEM CARTING INC103/22/2026
CORONA GROUP303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2016$10.4M—CORONA GROUP LLC → 39 SUNNYSIDE OWNERS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR203/21/2026
RAYMOND CHAN ARCHITECT803/21/2026
NDKAZALAS ARCHITECTURE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANDARIN ENTPRSES II INCGeneral Contractor2708/01/2026
LEMX CORPGeneral Contractor1907/08/2026
SHINE CONSTRUCTION CORPGeneral Contractor407/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
PHOENIX SUTTON STR INCGeneral Contractor207/08/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
UNITECH DESIGNScaffold105/27/2026
L S SIGNScaffold107/08/2026
ECONAIR SUPPLY INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344607/01/2026
ALL CITY ENGINEERING PC7115804/01/2025
NS ENGINEERING & CONSULTI3652303/12/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMANDARIN ENTPRSES II INC07/31/2026
DOB NOWPlumbingPermit IssuedTRI STATE PLBG & HTG INC05/05/2026
DOB NOWSprinklersSigned-offRRP PLUMBING CORP05/05/2026
DOB NOWGeneral ConstructionSigned-offMANDARIN ENTPRSES II INC04/22/2026
DOB NOWSignSigned-offUNITECH DESIGN INC04/08/2026
DOB NOWMechanical SystemsSigned-offSHINE CONSTRUCTION CORP04/07/2025
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC01/30/2025
DOB NOWMechanical SystemsSigned-offECONAIR SUPPLY01/17/2025
DOB NOWMechanical SystemsSigned-offSHINE CONSTRUCTION CORP01/14/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC01/08/2025
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.01/07/2025
DOB NOWGeneral ConstructionSigned-offMANDARIN ENTPRSES II INC12/26/2024
DOB NOWGeneral ConstructionSigned-offSHINE CONSTRUCTION CORP12/11/2024
DOB NOWSignSigned-offWEINFELD, ELLIOT10/03/2024
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC08/09/2023
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC06/12/2023
DOB NOWCurb CutSigned-offMANDARIN ENTPRSES II INC05/05/2023
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC02/17/2023
DOB NOWSupported ScaffoldSigned-offLEMX CORP01/17/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP11/17/2022
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC07/14/2022
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC05/12/2022
DOB NOWSupported ScaffoldSigned-offLEMX CORP01/14/2022
DOB NOWSidewalk ShedSigned-offLEMX CORP11/23/2021
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC11/19/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/15/2021
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC08/11/2021
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC06/11/2021
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC06/02/2021
DOB NOWSupported ScaffoldSigned-offLEMX CORP01/05/2021
DOB NOWSidewalk ShedSigned-offLEMX CORP12/17/2020
DOB NOWSupported ScaffoldSigned-offLEMX CORP10/28/2020
DOB NOWSidewalk ShedSigned-offLEMX CORP10/26/2020
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC07/31/2020
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC07/13/2020
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC05/29/2020
DOB NOWSidewalk ShedSigned-offLEMX CORP01/24/2020
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC07/10/2019
DOB NOWConstruction FenceSigned-offMANDARIN ENTPRSES II INC07/02/2019
BIS—ISSUEDMANDARIN ENTPRSES II INC01/04/2024
+ 37 more permits on file
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
07/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/18/2026Pass-Final Sign Permit InspectionPassView ↗
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/12/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
07/01/2026Sprinkler SystemsMINA HANNAspecial
07/01/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
06/29/2026Sprinkler SystemsMINA HANNAspecial
06/29/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/02/2026FinalJUSTIN KIMprogress
03/16/2026FinalMINA HANNAprogress
03/16/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
03/06/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
03/06/2026HVAC-R and service water heating system controlsMINA HANNAenergy_progress
03/06/2026Maintenance informationMINA HANNAenergy_progress
03/06/2026HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
03/06/2026HVAC-R and service water heating equipmentMINA HANNAenergy_progress
03/06/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/10/2026FinalMINA HANNAprogress
02/10/2026Mechanical SystemsMINA HANNAspecial
04/03/2025Interior lighting powerZhao Dengenergy_progress
04/03/2025Fire-Resistant Penetrations and JointsZhao Dengspecial
04/03/2025Energy Code Compliance InspectionsZhao Dengprogress
04/03/2025Lighting controlsZhao Dengenergy_progress
04/01/2025FinalZhao Dengprogress
04/01/2025Mechanical SystemsZhao Dengspecial
04/01/2025Fire-Resistant Penetrations and JointsZhao Dengspecial
04/01/2025Tenant Protection Plan ComplianceZhao Dengspecial
04/01/2025Energy Code Compliance InspectionsZhao Dengprogress
04/01/2025Duct leakage testing, insulation and designZhao Dengenergy_progress
Latest 25 of 61.
▾Documents — 441 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch21
08/29/2026Q01380870-I1Request digital key ↗
08/27/2026Q00629349-I1Request digital key ↗
08/26/2026Q00779838-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold9
08/27/2026Q00376738-P7Request digital key ↗
08/27/2026Q00376738-P8Request digital key ↗
08/27/2026Q00376738-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
08/28/2026Q00302036-I1Request digital key ↗
08/27/2026Q00418959-I1Request digital key ↗
08/15/2026Q00302036-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026Q00164202-I1Request digital key ↗
▸Applications & Permits89
▸BISPLAN / WORK APPROVAL APPLICATION74
02/04/2026421576299Open ↗
12/19/2025421576299Open ↗
10/23/2025421576299Open ↗
Showing 3 of 74 on file for this type
▸BISWORK PERMIT APPLICATION13
10/10/2023421576299Open ↗
03/24/2022440617174Open ↗
Showing 2 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/04/2023421576299Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
10/28/2024440736660Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
03/17/2021421576299Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications100
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/29/2026Q01380870-I1Open ↗
08/27/2026Q00418959-P1Open ↗
08/27/2026Q00418959-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/29/2026Q01130132-P1Open ↗
09/29/2026Q01130132-P1Open ↗
09/17/2026Q01105910-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/29/2026Q01130132-P1Open ↗
09/23/2026Q01357649-S2Open ↗
09/23/2026Q01357649-S2Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment33
▸BISEQUIPMENT USE PERMITS11
05/14/2025421576299Open ↗
05/14/2025421576299Open ↗
05/14/2025421576299Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING8
03/15/2024421576299Open ↗
03/06/2024421576299Open ↗
01/09/2024421576299Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
05/19/2025421576299Open ↗
05/14/2025421576299Open ↗
05/14/2025421576299Open ↗
Showing 3 of 4 on file for this type
▸BISSTANDPIPE SYSTEMS2
01/09/2024421602402Open ↗
01/09/2024421576299Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE (SD) SIGNOFF2
07/16/2024421576299Open ↗
06/03/2024421602402Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
06/27/2024421576299Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/09/2024421576299Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
04/16/2024421576299Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/09/2024421576299Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREES SITE PLAN2
04/30/2024421576299Open ↗
03/23/2024440736660Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
07/12/2024421576299Open ↗
07/12/2024440736660Open ↗
▸Environmental & Asbestos37
▸DOB NOWOER: Notice to Proceed24
08/17/2026Q01357649-I1Open ↗
08/17/2026Q01357649-S3Open ↗
08/17/2026Q01357649-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/17/2026Q01357649-S3Open ↗
08/13/2026Q01130696-I1Open ↗
08/13/2026Q01124773-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
05/01/2025440736660Open ↗
05/30/2024421602402Open ↗
04/10/2024421576299Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
01/09/2024421576299Open ↗
▸BISEXTERIOR LIGHTING POWER1
01/09/2024421576299Open ↗
▸BISINTERIOR LIGHTING POWER1
01/09/2024421576299Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
10/01/2024421576299Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/09/2024421576299Open ↗
▸BISFENESTRATION AREAS1
01/09/2024421576299Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/09/2024421576299Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
01/09/2024421576299Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/09/2024421576299Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
08/02/2022421576299Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/07/2022421576299Open ↗
▸BISBPP: FIELD INSPECTION1
06/11/2025440736660Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/05/2023440617174Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/06/2022421576299Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/06/2022421576299Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/02/2022421576299Open ↗
▸BISMASONRY1
09/06/2022421576299Open ↗
▸Approvals, Objections & Sign-offs34
▸BISLETTERS - SUPPORTING DOCUMENTATION15
01/14/2026421576299Open ↗
01/14/2026421576299Open ↗
07/16/2024421576299Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
02/04/2026421576299Open ↗
09/19/2025421576299Open ↗
09/17/2025421576299Open ↗
Showing 3 of 14 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
03/23/2024440736660Open ↗
03/23/2024440736660Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/03/2024421602402Open ↗
11/17/2023440617174Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/30/2024421602402Open ↗
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION21
02/19/2026421576299Open ↗
01/14/2026421576299Open ↗
09/24/2025421576299Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
10/23/2025421576299Open ↗
10/10/2023421576299Open ↗
Showing 2 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents3
▸BISBPP-PARKS: PLANT NEW TREE1
06/11/2025440736660Open ↗
▸BISSHUTOFF DAMPERS1
01/09/2024421576299Open ↗
▸BISLOWEST FLOOR ELEVATION1
09/06/2022421576299Open ↗