Two stories - detached, small or mid-size
39-12 219TH STREET
QUEENS · BIN 4137842
💬 Discuss this project
2022Year Built
2.5Stories
A1Building Class
R2AZoning
2,991 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Roof1p · 1 filing · 6 docs
Floor 233p · 1 filing · 20 docs
Floor 135p · 1 filing · 20 docs
Cellar35p · 3 filings · 20 docs
1 job · most recent 01/15/2024
FiledStatusContractorScope
01/15/2024——29 heads
1 job · most recent 01/15/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
01/15/2024Signed-offCROSSFIELD PLBG.&HTGGas, Plumbing-Sprinkler, Storm, Water/Sanitary
2 jobs · most recent 08/24/2023
General Wiring
FiledStatusContractorScope
08/24/2023CompleteJ Y ELECTRIC INCGeneral Wiring
11/10/2022CompleteJ Y ELECTRIC INC—
1 job · most recent 07/15/2026
FiledStatusContractorScope
07/15/2026Permit IssuedPOLAR CONTRACTING INC4 scope_items
Building Lifecycle
All (100)Filed (12)Permit Issued (20)Signed Off (4)Violation (10)Inspection (16)Objection (8)Special Inspection (30)
08/26/2026
Special inspection requirement — Lighting controls
JAN PEREZ
08/26/2026
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
08/26/2026
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
08/26/2026
Special inspection requirement — Fenestration areas
XIUCHENG LI
08/26/2026
Special inspection requirement — Metering
JAN PEREZ
08/26/2026
Special inspection requirement — Permanent certificate
JAN PEREZ
08/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
08/26/2026
Special inspection requirement — Structural Steel - Welding
XIUCHENG LI
08/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIUCHENG LI
08/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
08/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
XIUCHENG LI
08/26/2026
Special inspection requirement — Air barrier — testing
XIUCHENG LI
08/26/2026
Special inspection requirement — Structural Steel - Details
XIUCHENG LI
08/26/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
08/26/2026
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
08/26/2026
Special inspection requirement — Maintenance information
JAN PEREZ
08/26/2026
Special inspection requirement — Chimneys and vents
JAN PEREZ
08/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIUCHENG LI
08/26/2026
Special inspection requirement — Masonry
XIUCHENG LI
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
08/26/2026
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
08/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIUCHENG LI
08/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
08/26/2026
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
08/26/2026
Special inspection requirement — Final
JAN PEREZ
08/26/2026
Special inspection requirement — Footing and Foundation
XIUCHENG LI
08/26/2026
Special inspection requirement — Exterior lighting power
XIUCHENG LI
07/15/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O
Q00537626-P5
07/15/2026
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
06/25/2026
Inspection — Pass-Final Curb Cut Withdrawal
Pass
View inspection ↗
06/18/2026
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00537626
Q00537884-I1
06/18/2026
Signed off — Alteration
INSTALLING NEW CURB CUT, NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q01127133-I1
06/16/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/05/2026
Signed off — Alteration
Q00539566-I1
01/08/2026
Violation issued (ECB, open)
Construction
12/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O
Q00537626-P4
09/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2025
Permit issued — Plumbing
Q00537884-I1-PL
09/10/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/21/2025
Permit issued — Curb Cut
Q00617944-I1-CC
05/21/2025
Permit issued — Curb Cut
Q01127133-I1-CC
05/19/2025
Permit issued — General Construction
Q00537626-I1-GC-CX
01/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/18/2024
Permit issued — Earth Work
Q00537626-I1-GC-CX
11/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2024
Objection resolved — Addressed
11/13/2024
Objection raised — Other
10/29/2024
Objection resolved — Addressed
10/28/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O
Q00537626-P3
10/25/2024
Objection raised — Scope
10/16/2024
Filed — Alteration
INSTALLING NEW CURB CUT, NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q01127133-I1
09/10/2024
Permit issued — Plumbing
Q00537884-I1-PL
08/18/2024
Signed off — Alteration
Q00666942-I1
Latest 60 of 100 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
POLAR CONTRACTING103/22/2026
SHIDAL CONSTRUCTION INC503/22/2026
CONTRACTING INC POLAR103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2021$1.2M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC CONSULTING ENGINEERS507/15/2026
BAYSIDE ENGINEERING PC410/28/2024
AMERILAND BROOK LLC304/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXT STEP BUILDING SOLUTIONS403/21/2026
POLAR CONTRACTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POLAR CONTRACTING INCGeneral Contractor2007/08/2026
SHIDAI CONSTRUCTION INCGeneral Contractor507/08/2026
CROSSFIELD PLBG.&HTGPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010407/15/2026
AMERILAND BROOK LLC1506410/28/2024
ARC CONSULTING ENGINEERS,4083206/14/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/12/2025
DOB NOWCurb CutPermit IssuedPOLAR CONTRACTING INC05/21/2025
DOB NOWCurb CutSigned-offPOLAR CONTRACTING INC05/21/2025
DOB NOWGeneral ConstructionPermit IssuedPOLAR CONTRACTING INC05/19/2025
DOB NOWEarth WorkPermit IssuedPOLAR CONTRACTING INC12/18/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/10/2024
DOB NOWConstruction FenceSigned-offPOLAR CONTRACTING INC04/17/2024
DOB NOWMechanical SystemsSigned-offPOLAR CONTRACTING INC01/09/2024
DOB NOWGeneral ConstructionPermit IssuedPOLAR CONTRACTING INC12/26/2023
DOB NOWEarth WorkPermit IssuedPOLAR CONTRACTING INC11/06/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG07/27/2023
DOB NOWConstruction FenceSigned-offPOLAR CONTRACTING INC03/29/2023
DOB NOWEarth WorkPermit IssuedPOLAR CONTRACTING INC11/09/2022
DOB NOWConstruction FenceSigned-offPOLAR CONTRACTING INC07/19/2022
DOB NOWFoundationPermit IssuedPOLAR CONTRACTING INC07/11/2022
DOB NOWEarth WorkPermit IssuedPOLAR CONTRACTING INC07/06/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/07/2022
DOB NOWGeneral ConstructionPermit IssuedSHIDAI CONSTRUCTION03/18/2022
DOB NOWMechanical SystemsSigned-offSHIDAI CONSTRUCTION02/21/2022
DOB NOWConstruction FenceSigned-offSHIDAI CONSTRUCTION02/08/2022
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
06/25/2026Pass-Final Curb Cut WithdrawalPassView ↗
06/16/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/15/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/26/2026Lighting controlsJAN PEREZenergy_progress
08/26/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
08/26/2026Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
08/26/2026Fenestration air leakageXIUCHENG LIenergy_progress
08/26/2026Permanent certificateJAN PEREZenergy_progress
08/26/2026Maintenance informationJAN PEREZenergy_progress
08/26/2026Insulation placement and R valuesXIUCHENG LIenergy_progress
08/26/2026MeteringJAN PEREZenergy_progress
08/26/2026Interior lighting powerXIUCHENG LIenergy_progress
08/26/2026Air barrier - visual inspectionXIUCHENG LIenergy_progress
08/26/2026Fenestration areasXIUCHENG LIenergy_progress
08/26/2026Air barrier — testing XIUCHENG LIenergy_progress
08/26/2026Exterior lighting powerXIUCHENG LIenergy_progress
08/26/2026Electric vehicle service equipment requirementsXIUCHENG LIenergy_progress
08/26/2026Footing and FoundationXIUCHENG LIprogress
08/26/2026FinalJAN PEREZprogress
08/26/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
08/26/2026Fire-Resistance Rated ConstructionXIUCHENG LIprogress
08/26/2026Subgrade InspectionsXIUCHENG LIspecial
08/26/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
08/26/2026Chimneys and ventsJAN PEREZspecial
08/26/2026MasonryXIUCHENG LIspecial
08/26/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
08/26/2026Structural Steel - WeldingXIUCHENG LIspecial
08/26/2026Excavations - Sheeting, Shoring, and BracingXIUCHENG LIspecial
Latest 25 of 150.
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00539566-I1Request digital key ↗
08/26/2026Q00666942-I1Request digital key ↗
08/23/2026Q00537884-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
09/19/2025440820346Open ↗
11/07/2024440820346Open ↗
09/19/2024440688383Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
11/07/2024440820346Open ↗
11/11/2022440688383Open ↗
11/02/2022440688383Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram6
08/18/2026Q00537626-P5Open ↗
08/13/2026Q00537626-I1Open ↗
08/13/2026Q00537626-P4Open ↗
Showing 3 of 6 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
09/16/2021440688383Open ↗
08/20/2021421790020Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00537626-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/18/2026Q00537626-P5Open ↗
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature25
08/31/2026Q00537626-P1Open ↗
08/31/2026Q00537626-P1Open ↗
08/31/2026Q00537626-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/31/2026Q00537626-P1Open ↗
08/31/2026Q00537626-P1Open ↗
08/31/2026Q00537626-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/18/2026Q00537626-P5Open ↗
08/13/2026Q00537884-I1Open ↗
08/13/2026Q00539566-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/07/2024440820346Open ↗
09/16/2021440688383Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/07/2024440820346Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/18/2026Q00537626-P5Open ↗
08/13/2026Q00537626-P4Open ↗
08/13/2026Q00537626-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST6
12/12/2024440820346Open ↗
11/07/2024440820346Open ↗
11/11/2022440688383Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
12/12/2024440820346Open ↗
▸DOB NOWStreet Tree Sign Off1
08/18/2026Q00537626-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/18/2026Q00537626-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00537626-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/27/2026Q00539566-I1Open ↗
08/18/2026Q00537626-I1Open ↗
08/13/2026Q00537884-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISDOB APPROVAL FOR NEW CC1
12/12/2024440820346Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026Q00537626-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00537626-I1Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION3
12/12/2024440820346Open ↗
11/11/2022440688383Open ↗
11/02/2022440688383Open ↗
▸DOB NOWAI1 Form3
08/18/2026Q00537626-P5Open ↗
08/13/2026Q00537626-I1Open ↗
08/13/2026Q00537626-P4Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/07/2024440820346Open ↗
09/16/2021440688383Open ↗
▸BISBOROUGH INTAKE FORM1
07/21/2021421790020Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/16/2021440688383Open ↗
▸BISEFILING COVER SHEET1
08/02/2021421790020Open ↗
▸Other Documents25
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/18/2026Q00537626-P5Open ↗
08/13/2026Q00537626-P1Open ↗
08/13/2026Q00537626-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/18/2026Q00537626-P5Open ↗
08/13/2026Q00537626-P4Open ↗
08/13/2026Q00537626-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWWaiver Document5
08/18/2026Q00537626-P5Open ↗
08/13/2026Q00537626-P3Open ↗
08/13/2026Q00537626-P2Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
11/02/2022440688383Open ↗
09/14/2022440688383Open ↗
09/14/2022440688383Open ↗
▸BISPLOT DIAGRAM2
08/20/2021421790020Open ↗
08/20/2021421790020Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/12/2024440820346Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00537626-I1Open ↗
▸DOB NOWFinal Survey1
08/18/2026Q00537626-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00537626-I1Open ↗