← Back
Primarily 2 family with 1 store or office
39-14 104 STREET
QUEENS · BIN 4044385
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R6BZoning
3,220 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸
Primarily 2 family with 1 store or office · Owner of record: 39-14 104TH STREET LLC · 2,400 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Roof1p · 1 filing · 8 docs
Floor 23p · 2 filings · 20 docs
Floor 19p · 5 filings · 20 docs
Cellar4p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
39-14 104TH STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/05/2023$1.9M—Private party → 39-14 104TH STREET LLC$599/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRUPO DESIGN707/17/2024
A M ENGINEERING SERVICES PC504/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CARLOS RAMIREZ703/21/2026
AM ENGINEERING SERVICES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor903/21/2026
FRANCISCO SOSA, INCGeneral Contractor603/21/2026
WCK ELECTRIC CORP.Electrical203/22/2026
JUST PLBG & HTG INCPlumbing207/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GIOVANNI ZAPATA R.A.3882707/17/2024
AM ENGINEERING SERVICES P7975504/28/2023
Building Lifecycle
All (125)Filed (12)Permit Issued (9)Signed Off (5)Violation (47)Inspection (13)Objection (24)Special Inspection (15)
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/2024
Signed off — Alteration
replace existing HVAC unit at rear yard with new CONDENSING COMFORT-AIRE model # RSG1360S1M-11 serial # 1922E81938 and FURNACE COMFORT-AIRE model# MCG60PDAP serial# 7122D12848 previos HVAC unit FILED UNDER APPL. 401955817.
Q00861885-I1
08/15/2024
Signed off — Alteration
PROP. PL. JOB TO REMOVE BOILER AND HWH AT CELLAR INSTALL NEW ELECTRICT HVAC AT 1ST FLR , AND ELECTRIC WATER COIL , REPLACE GAS RANGE TO ELEC. AT 2ND FLR RENOVATE EXIST BATH AT 2ND NEW TOILET AT CELLA FLR. FILED IN CONJUNCTION WITH (GC) JOB # Q008617
Q00861812-I1
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
07/17/2024
Filed — Alteration
PROP. PL. JOB TO REMOVE BOILER AND HWH AT CELLAR INSTALL NEW ELECTRICT HVAC AT 1ST FLR , AND ELECTRIC WATER COIL , REPLACE GAS RANGE TO ELEC. AT 2ND FLR RENOVATE EXIST BATH AT 2ND NEW TOILET AT CELLA FLR. FILED IN CONJUNCTION WITH (GC) JOB # Q008617
Q00861812-P2
05/28/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/19/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/01/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/02/2024
Permit issued — Plumbing
Q00861812-I1-PL
11/29/2023
Violation issued (HPD, open)
I
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
GIOVANNI ZAPATA
11/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
GIOVANNI ZAPATA
11/20/2023
Special inspection requirement — Final
GIOVANNI ZAPATA
11/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
GIOVANNI ZAPATA
11/20/2023
Special inspection requirement — Mechanical Systems
GIOVANNI ZAPATA
11/04/2023
Filed — Alteration
replace existing HVAC unit at rear yard with new CONDENSING COMFORT-AIRE model # RSG1360S1M-11 serial # 1922E81938 and FURNACE COMFORT-AIRE model# MCG60PDAP serial# 7122D12848 previos HVAC unit FILED UNDER APPL. 401955817.
Q00861885-P1
11/02/2023
Objection resolved — Addressed
10/30/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXIST RETAIL STORE UG6 FOR PHARMACY AT 1ST FLR & CELL AS ACCESSORY USE OF 1ST FLR, RENOVATION TWO DWELL UNITS AT 2 FLR, NO CHANGE IN USE, OCCUPANCY, CONST CLASS OR EGRESS.
Q00861749-I1
10/27/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/17/2023
Objection raised — Scope
10/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
10/09/2023
Filed — Alteration
INTERIOR RENOVATION OF EXIST RETAIL STORE UG6 FOR PHARMACY AT 1ST FLR & CELL AS ACCESSORY USE OF 1ST FLR, RENOVATION TWO DWELL UNITS AT 2 FLR, NO CHANGE IN USE, OCCUPANCY, CONST CLASS OR EGRESS.
Q00861749-P1
10/09/2023
Filed — Alteration
PROP. PL. JOB TO REMOVE BOILER AND HWH AT CELLAR INSTALL NEW ELECTRICT HVAC AT 1ST FLR , AND ELECTRIC WATER COIL , REPLACE GAS RANGE TO ELEC. AT 2ND FLR RENOVATE EXIST BATH AT 2ND NEW TOILET AT CELLA FLR. FILED IN CONJUNCTION WITH (GC) JOB # Q008617
Q00861812-P1
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
GIOVANNI ZAPATA
09/20/2023
Special inspection requirement — Mechanical Systems
GIOVANNI ZAPATA
09/20/2023
Special inspection requirement — Final
GIOVANNI ZAPATA
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
GIOVANNI ZAPATA
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
GIOVANNI ZAPATA
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
07/12/2023
Violation issued (ECB, closed)
Unknown
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2023
Permit issued — Plumbing
Q00861812-I1-PL
05/25/2023
Permit issued — Mechanical Systems
Q00861885-I1-MS
05/23/2023
Permit issued — General Construction
Q00861749-I1-GC
05/19/2023
Filed — Alteration
replace existing HVAC unit at rear yard with new CONDENSING COMFORT-AIRE model # RSG1360S1M-11 serial # 1922E81938 and FURNACE COMFORT-AIRE model# MCG60PDAP serial# 7122D12848 previos HVAC unit FILED UNDER APPL. 401955817.
Q00861885-I1
05/19/2023
Filed — Alteration
PROP. PL. JOB TO REMOVE BOILER AND HWH AT CELLAR INSTALL NEW ELECTRICT HVAC AT 1ST FLR , AND ELECTRIC WATER COIL , REPLACE GAS RANGE TO ELEC. AT 2ND FLR RENOVATE EXIST BATH AT 2ND NEW TOILET AT CELLA FLR. FILED IN CONJUNCTION WITH (GC) JOB # Q008617
Q00861812-I1
05/17/2023
Objection resolved — Addressed
05/17/2023
Objection resolved — Addressed
05/16/2023
Signed off — Alteration
REMOVE CAP & SEAL 3 NON-RES SINKS @ CELLAR. REMOVE CAP & SEAL (1)CHARCOAL BROILER, (1)HOT TOP, (2)GAS FRYERS, (1)6 BURNER RANGE, (1)STEAM TABLE(1)DISHWASHER, (3)NON-RESIDENTIAL SINKS, (1)3 COMP SINK, (1) CHECK VALVE GAS, PROP. (1) LAV, (1) TOILET AT 1 FL.
Q00588744-I1
05/16/2023
Objection resolved — Addressed
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Fire_Protection
05/05/2023
Objection raised — Scope
05/05/2023
Objection raised — Structural
05/05/2023
Objection raised — Zoning
05/05/2023
Objection raised — Plumbing
05/05/2023
Objection raised — Energy
05/02/2023
Filed — Alteration
INTERIOR RENOVATION OF EXIST RETAIL STORE UG6 FOR PHARMACY AT 1ST FLR & CELL AS ACCESSORY USE OF 1ST FLR, RENOVATION TWO DWELL UNITS AT 2 FLR, NO CHANGE IN USE, OCCUPANCY, CONST CLASS OR EGRESS.
Q00861749-I1
04/28/2023
Filed — Alteration
REMOVE CAP & SEAL 3 NON-RES SINKS @ CELLAR. REMOVE CAP & SEAL (1)CHARCOAL BROILER, (1)HOT TOP, (2)GAS FRYERS, (1)6 BURNER RANGE, (1)STEAM TABLE(1)DISHWASHER, (3)NON-RESIDENTIAL SINKS, (1)3 COMP SINK, (1) CHECK VALVE GAS, PROP. (1) LAV, (1) TOILET AT 1 FL.
Q00588744-P2
04/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
03/22/2023
Signed off — Alteration
RENOVATION OF EXIST COMMERCIAL STORE AT FIRST FLOOR. REPAIR PARAPET AT BUILDING FACADE.REMOVAL OF DUCT & HVAC AND KITCHEN HOOD. AT 1ST FLOOR. CORRECT ECB VIOLATIONS: 34834726L, 35220902L, 35220904P, 35220903N, 35587229L, 35587230Z, 35587231K.
Q00617420-I1
03/09/2023
Permit issued — General Construction
Q00617420-I1-MS
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC02/02/2024
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP06/06/2023
DOB NOWMechanical SystemsSigned-offFRANCISCO SOSA, INC05/25/2023
DOB NOWGeneral ConstructionSigned-offFRANCISCO SOSA, INC05/23/2023
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC03/09/2023
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK01/11/2023
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC01/11/2023
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC02/23/2022
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK02/01/2022
BISMHISSUEDMEGA FIRE PROTECTION INC03/03/2005
BISPLISSUEDP.S.I. MECHANICAL08/25/2004
BISPLISSUEDP.S.I. MECHANICAL08/25/2004
BISOTISSUEDJGL CONTRACTING05/24/2004
2 projects · most recent 01/04/2024
General Wiring
FiledStatusContractorScope
01/04/2024CompleteWCK ELECTRIC CORP.General Wiring
08/15/2022CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/19/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/01/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/14/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/22/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/17/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/30/2024Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
11/20/2023HVAC-R and service water heating equipmentGIOVANNI ZAPATAenergy_progress
11/20/2023HVAC-R and service water heating system controlsGIOVANNI ZAPATAenergy_progress
11/20/2023FinalGIOVANNI ZAPATAprogress
11/20/2023HVAC-R and service water piping design and insulationGIOVANNI ZAPATAenergy_progress
11/20/2023Mechanical SystemsGIOVANNI ZAPATAspecial
10/16/2023Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
09/20/2023HVAC-R and service water heating system controlsGIOVANNI ZAPATAenergy_progress
09/20/2023Mechanical SystemsGIOVANNI ZAPATAspecial
09/20/2023FinalGIOVANNI ZAPATAprogress
09/20/2023HVAC-R and service water heating equipmentGIOVANNI ZAPATAenergy_progress
09/20/2023HVAC-R and service water piping design and insulationGIOVANNI ZAPATAenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
04/26/2023Fire-Resistant Penetrations and JointsAlbert Munozspecial
08/22/2022Fire-Resistant Penetrations and JointsAlbert Munozspecial
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026Q00617420-P2Request digital key ↗
08/25/2026Q00588744-I1Request digital key ↗
08/25/2026Q00588744-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION7
06/13/2023402320234Open ↗
06/13/2023401955817Open ↗
06/13/2023401860624Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026Q00588744-P2Open ↗
08/25/2026Q00588744-P1Open ↗
08/25/2026Q00588744-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/18/2026Q00861885-I1Open ↗
09/18/2026Q00861885-I1Open ↗
09/18/2026Q00861885-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/29/2026Q00861812-I1Open ↗
09/18/2026Q00861885-I1Open ↗
09/01/2026Q00588744-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026Q00588744-P2Open ↗
08/25/2026Q00588744-I1Open ↗
08/24/2026Q00861749-I1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00617420-I1Open ↗