← Back
Multi-story retail building (2+)
39-24 BELL BOULEVARD
QUEENS · BIN 4137571
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
R6BZoning
3,492 sfGross Floor Area
2Units
7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 39-24 BELL REALTY CORP · 1,517 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 21p · 1 filing · 4 docs
Floor 14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MJT LLC503/22/2026
39-24 BELL REALTY CORP C/303/22/2026
39-24 BELL BOULEVARD1203/22/2026
39-24 BELL BAR INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOHN STACOM ARCHITECTURAL DESIGN503/21/2026
JD DESIGN ASSOCIATES INC803/21/2026
AE DESIGN SOLUTION403/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMS CONTRACTOR INCGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
SMVP MGMT INCGeneral Contractor207/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor107/08/2026
LOCATI DELEVLOPMENT INCGeneral Contractor107/08/2026
UNLIMITED PLG SOLUTIONSPlumbing107/08/2026
GIFFIN, SCOTTElectrical103/21/2026
ACTIVE SIGNSScaffold107/08/2026
MEGA ELEC'L CONTR'G, INCElectrical103/22/2026
PASTORE, JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659109/09/2022
NS ENGINEERING & CONSULTI3652105/19/2022
AA BUILDING & INSPECTION1519111/05/2021
ABDUS SALAM C. ENGINEERS484111/05/2021
MSM ENGINEERING SERVICES,8449112/06/2019
Building Lifecycle
All (77)Filed (13)Permit Issued (9)Signed Off (8)Violation (25)Inspection (5)Objection (2)Special Inspection (15)
12/01/2023
Violation issued (ECB, closed)
Construction
04/10/2023
Violation issued (FDNY_NOV, closed)
02/27/2023
Signed off — Alteration
Legalize installed 3/4" pipe to 2nd fl HVAC unit, 2" piping from head of service to new meter bars, 3 class 250 meter bars in cellar, & removal of cooking fixtures on 1st fl, Exist hvac unit on 1st & 2nd fl, HWH in cellar, and piping to remain/no work
Q00790421-I1
02/27/2023
Signed off — Alteration
Q00739811-I1
01/09/2023
Filed — Alteration
Legalize installed 3/4" pipe to 2nd fl HVAC unit, 2" piping from head of service to new meter bars, 3 class 250 meter bars in cellar, & removal of cooking fixtures on 1st fl, Exist hvac unit on 1st & 2nd fl, HWH in cellar, and piping to remain/no work
Q00790421-P3
12/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Scope
12/02/2022
Filed — Alteration
Legalize installed 3/4" pipe to 2nd fl HVAC unit, 2" piping from head of service to new meter bars, 3 class 250 meter bars in cellar, & removal of cooking fixtures on 1st fl, Exist hvac unit on 1st & 2nd fl, HWH in cellar, and piping to remain/no work
Q00790421-P2
12/02/2022
Signed off — Alteration
INSTALL KITCHEN HOOD SYSTEM FOR EXISTING STORE.
Q00270910-I1
11/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2022
Filed — Alteration
Legalize installed 3/4" pipe to 2nd fl HVAC unit, 2" piping from head of service to new meter bars, 3 class 250 meter bars in cellar, & removal of cooking fixtures on 1st fl, Exist hvac unit on 1st & 2nd fl, HWH in cellar, and piping to remain/no work
Q00790421-P1
09/09/2022
Filed — Alteration
INSTALL KITCHEN HOOD SYSTEM FOR EXISTING STORE.
Q00270910-P1
09/09/2022
Special inspection requirement — HVAC and service water heating system controls
MOHAMED MAHMOUD
09/09/2022
Special inspection requirement — HVAC insulation and sealing
MOHAMED MAHMOUD
09/09/2022
Special inspection requirement — Final
MOHAMED MAHMOUD
09/09/2022
Special inspection requirement — HVAC and service water heating equipment
MOHAMED MAHMOUD
09/09/2022
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
09/08/2022
Permit issued — Plumbing
Q00790421-I1-PL
09/08/2022
Special inspection requirement — HVAC and service water heating system controls
ALBERTO ROMAN
09/08/2022
Special inspection requirement — Mechanical Systems
ALBERTO ROMAN
09/08/2022
Special inspection requirement — Final
ALBERTO ROMAN
09/08/2022
Special inspection requirement — HVAC insulation and sealing
ALBERTO ROMAN
09/08/2022
Special inspection requirement — HVAC and service water heating equipment
ALBERTO ROMAN
08/18/2022
Filed — Alteration
Legalize installed 3/4" pipe to 2nd fl HVAC unit, 2" piping from head of service to new meter bars, 3 class 250 meter bars in cellar, & removal of cooking fixtures on 1st fl, Exist hvac unit on 1st & 2nd fl, HWH in cellar, and piping to remain/no work
Q00790421-I1
07/07/2022
Permit issued — Mechanical Systems
Q00739811-I1-MS
05/19/2022
Filed — Alteration
Q00739811-I1
05/18/2022
Violation issued (ECB, closed)
Construction
01/14/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00605352-I1
12/22/2021
Signed off — Alteration
Herewith filing for facade repairs
Q00624321-I1
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2021
Permit issued — Structural
Q00624321-I1-GC-CX
11/05/2021
Filed — Alteration
Herewith filing for facade repairs
Q00624321-I1
11/04/2021
Violation issued (ECB, open)
Construction
11/04/2021
Special inspection requirement — Final
Paul Perdek
11/03/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00605352-P1
10/26/2021
Permit issued — Sidewalk Shed
Q00605352-I1-SH
10/25/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00605352-I1
09/28/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/2021
Signed off — Alteration
INSTALL PLUMBING FIXTURES FOR EXISTING STORE.
Q00270908-I1
05/18/2021
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - T SWIRL CREPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00314468-I1
03/19/2021
Permit issued — Plumbing
Q00270908-I1-PL
01/28/2021
Signed off — Alteration
INSTALL CONSTRUCTION WOOD FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00270907-I1
06/11/2020
Permit issued — Sign
Q00314468-I1-SG
03/18/2020
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - T SWIRL CREPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00314468-I1
03/18/2020
Special inspection requirement — Final
Jose Pena
01/22/2020
Permit issued — Mechanical Systems
Q00270910-I1-MS
01/21/2020
Permit issued — Plumbing
Q00270908-I1-PL
01/21/2020
Permit issued — Construction Fence
Q00270907-I1-FN
12/06/2019
Filed — Alteration
INSTALL KITCHEN HOOD SYSTEM FOR EXISTING STORE.
Q00270910-I1
11/26/2019
Filed — Alteration
INSTALL PLUMBING FIXTURES FOR EXISTING STORE.
Q00270908-I1
11/25/2019
Filed — Alteration
INSTALL CONSTRUCTION WOOD FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00270907-I1
11/25/2019
Special inspection requirement — HVAC insulation and sealing
ALBERTO ROMAN
11/25/2019
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCENTA PLBG & HTG INC09/08/2022
DOB NOWMechanical SystemsSigned-offLOCATI DELEVLOPMENT INC07/07/2022
DOB NOWStructuralSigned-offAMS CONTRACTOR INC11/15/2021
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I10/26/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/19/2021
DOB NOWSignSigned-offACTIVE SIGNS INC06/11/2020
DOB NOWMechanical SystemsPermit IssuedSMVP MGMT INC01/22/2020
DOB NOWPlumbingSigned-offT & T PLUMBING INC01/21/2020
DOB NOWConstruction FenceSigned-offSMVP MGMT INC01/21/2020
BISOTISSUEDMOHEGAN SUN CONSTRUCTION12/11/2020
BISOTISSUEDMOHEGAN SUN CONSTRUCTION11/18/2019
BISMHISSUEDTTC SERVICE CORP07/30/2010
BISPLISSUEDMAHER & SON, INC11/04/2009
BISOTISSUEDWINNIE'S RESTAURANT09/09/2008
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/06/2004
BISPLISSUEDDNA PLUMBING CONTR. INC03/25/2004
BISMHISSUEDH & H BUILDING CONSULTANTS03/24/2004
BISEQISSUEDH & H BUILDING CONSULTANTS03/24/2004
2 projects · most recent 10/01/2021
General Wiring
FiledStatusContractorScope
10/01/2021CompleteMEGA ELEC'L CONTR'G, INC—
07/29/2020Permit IssuedNYCOM ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/09/2022HVAC and service water heating system controls MOHAMED MAHMOUDenergy_progress
09/09/2022HVAC insulation and sealing MOHAMED MAHMOUDenergy_progress
09/09/2022FinalMOHAMED MAHMOUDprogress
09/09/2022HVAC and service water heating equipment MOHAMED MAHMOUDenergy_progress
09/09/2022Mechanical SystemsMOHAMED MAHMOUDspecial
09/08/2022HVAC and service water heating system controls ALBERTO ROMANenergy_progress
09/08/2022Mechanical SystemsALBERTO ROMANspecial
09/08/2022FinalALBERTO ROMANprogress
09/08/2022HVAC insulation and sealing ALBERTO ROMANenergy_progress
09/08/2022HVAC and service water heating equipment ALBERTO ROMANenergy_progress
11/04/2021FinalPaul Perdekprogress
03/18/2020FinalJose Penaprogress
11/25/2019HVAC insulation and sealing ALBERTO ROMANenergy_progress
11/25/2019Energy Code Compliance InspectionsALBERTO ROMANprogress
11/22/2019FinalALBERTO ROMANprogress
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch8
08/27/2026Q00605352-P1Request digital key ↗
08/27/2026Q00605352-I1Request digital key ↗
08/27/2026Q00624321-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026Q00270910-I1Request digital key ↗
08/25/2026Q00270910-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/28/2026Q00314468-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00270907-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00270908-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
01/07/2021421939086Open ↗
12/30/2020421939086Open ↗
11/21/2019421939086Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
07/29/2021421939086Open ↗
11/21/2019421939086Open ↗
07/30/2010420213691Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026Q00270907-I1Open ↗
08/29/2026Q00270908-I1Open ↗
08/29/2026Q00270908-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00270908-I1Open ↗
08/28/2026Q00270907-I1Open ↗
08/27/2026Q00605352-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
11/21/2019421939086Open ↗
10/28/2010410154522Open ↗
09/30/2010420213691Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/21/2019421939086Open ↗
07/28/2010420213691Open ↗
08/27/2008410154522Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/12/2010420213691Open ↗
08/20/2008410154522Open ↗
07/21/2008410140574Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00270910-P1Open ↗
08/23/2026Q00270910-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/21/2019421939086Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
08/20/2008410154522Open ↗
07/21/2008410140574Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/30/2010420213691Open ↗
07/12/2010420213691Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
12/02/2009410154522Open ↗
▸BISEQUIPMENT USE PERMITS1
09/30/2010420213691Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/21/2019421939086Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026Q00270908-I1Open ↗
08/26/2026Q00739811-I1Open ↗
08/25/2026Q00270910-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
07/12/2010420213691Open ↗
08/20/2008410154522Open ↗
07/21/2008410140574Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/21/2019421939086Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/24/2021421939086Open ↗
08/09/2021421939086Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/24/2021421939086Open ↗
08/10/2021421939086Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/21/2019421939086Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00739811-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/24/2021421939086Open ↗
08/24/2021421939086Open ↗
08/24/2021421939086Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/24/2021421939086Open ↗
08/24/2021421939086Open ↗
10/28/2010410154522Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/12/2010420213691Open ↗
08/20/2008410154522Open ↗
07/21/2008410140574Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/28/2010410154522Open ↗
09/30/2010420213691Open ↗
▸BISSUPERSEDING LETTER1
07/29/2021421939086Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
08/24/2021421939086Open ↗
08/09/2021421939086Open ↗
11/21/2019421939086Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
11/21/2019421939086Open ↗
07/12/2010420213691Open ↗
08/20/2008410154522Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
01/07/2021421939086Open ↗
03/19/2010410154522Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
08/24/2021421939086Open ↗
08/24/2021421939086Open ↗
08/10/2021421939086Open ↗