Roof3p · 2 filings · 20 docs
ArchitectureElectricalStructural
Proposing a 8.0kW grid-tied flush roof mount with attached solar panels and microinverters. Want to push this through DOB NOW. Contractor was changed and Permit was expired. Need to void all open permits and use this one instead.
On file for this project
7 documents · 2 drawing sheets
PROPOSED HORIZONTAL AND VERTICAL EXTENSION AT FIRST AND SECOND FLOOR OF EXISTING 1-FAMILY HOUSE. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
On file for this project
171 documents · 1 drawing sheet
Floor 28p · 1 filing · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
PROPOSED HORIZONTAL AND VERTICAL EXTENSION AT FIRST AND SECOND FLOOR OF EXISTING 1-FAMILY HOUSE. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
On file for this project
171 documents
Floor 18p · 1 filing · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
PROPOSED HORIZONTAL AND VERTICAL EXTENSION AT FIRST AND SECOND FLOOR OF EXISTING 1-FAMILY HOUSE. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
On file for this project
171 documents
Cellar8p · 1 filing · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
PROPOSED HORIZONTAL AND VERTICAL EXTENSION AT FIRST AND SECOND FLOOR OF EXISTING 1-FAMILY HOUSE. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
On file for this project
171 documents