← Back
Elevator apt, semi-fireproof without stores
The Fifty LIC
39-26 30 STREET · BIN 4625411
💬 Discuss this project
2023Year Built
11Stories
D1Building Class
M1-3/R7XZoning
52,456 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 39-26 PROPERTY LLC · 7,500 sf lot · 6.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipment
Roof2p · 1 filing · 8 docs
Floor 111p · 1 filing · 7 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 510p · 1 filing · 20 docs
Floor 410p · 1 filing · 20 docs
Floor 310p · 1 filing · 20 docs
Floor 215p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
39-26 PROPERTY9507/08/2026
JLS GROUP CONSTRUCTION1307/08/2026
MC SUPERSTRUCTURE INC.503/22/2026
PRD GROUP INC503/22/2026
TRI BOROUGH SCAFFOLDING403/22/2026
DYNASTY CONTRACTING103/22/2026
ZHONG CHUANG PROPERTIES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARK ENGINEERING PC403/21/2026
Rigid Structural Design, LLC203/21/2026
BMB BUILDING CONSULTING1803/21/2026
XPDITE GROUP LLC (104)503/21/2026
MY ARCHITECT1403/21/2026
GEIGER E A GROUP203/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JLS GROUP CONSTRUCTION LLGeneral Contractor3407/08/2026
VIP FIRE SPRINKLER INCFire Protection807/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor707/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor603/21/2026
DYNASTY CONTRACTING LLCGeneral Contractor407/08/2026
PRD GROUP INCGeneral Contractor303/21/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
MY ARCHITECTGeneral Contractor103/22/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
EDWIN F DEGUZMANElectrical103/21/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARK ENGINEERING PC72611803/18/2025
SYNERGIC DESIGN LLC8561110/23/2024
REGIONAL TESTING CORP.394105/06/2022
Building Lifecycle
All (199)Filed (30)Permit Issued (32)Signed Off (17)Violation (3)Inspection (18)Objection (69)Special Inspection (30)
01/10/2026
Signed off — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-I1
12/01/2025
Filed — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-B1
10/07/2025
Objection raised — Admin
09/11/2025
Filed — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-A6
08/05/2025
Filed — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-A5
07/14/2025
Objection resolved — Addressed
07/03/2025
Special inspection requirement — Fenestration air leakage
07/03/2025
Special inspection requirement — Insulation placement and R values
07/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
07/03/2025
Special inspection requirement — Fenestration areas
07/03/2025
Special inspection requirement — Air barrier - visual inspection
04/23/2025
Objection raised — Energy
04/16/2025
Filed — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-A4
04/16/2025
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE WITHIN THREE FEET OF PROPERTY LINE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00737885-I1
04/07/2025
Signed off — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-S4
03/31/2025
Signed off — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-S6
03/31/2025
Signed off — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-S7
03/27/2025
Signed off — Alteration
Q01125829-I1
03/26/2025
Signed off — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-S5
03/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2025
Filed — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-A3
03/18/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/18/2025
Special inspection requirement — Electrical motors and elevators
George Lau
03/18/2025
Special inspection requirement — Final
George Lau
03/18/2025
Special inspection requirement — Mechanical Systems
George Lau
03/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
George Lau
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Lau
03/18/2025
Special inspection requirement — Shutoff dampers
George Lau
03/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
George Lau
03/18/2025
Special inspection requirement — Maintenance information
George Lau
03/18/2025
Special inspection requirement — Metering
George Lau
03/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
George Lau
03/18/2025
Special inspection requirement — Energy Code Compliance Inspections
George Lau
03/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
George Lau
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Lau
03/12/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Paul Raymond
03/12/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
George Lau
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
George Lau
03/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
George Lau
03/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
George Lau
03/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
George Lau
03/12/2025
Special inspection requirement — Maintenance information
George Lau
03/11/2025
Signed off — Alteration
FILING CURB CUT APPLICATION IN CONJUNCTION WITH NB # Q00646536
Q00691285-I1
03/08/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/06/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
02/27/2025
Signed off — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-S3
02/27/2025
Signed off — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-S2
02/27/2025
Filed — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-A2
02/25/2025
Signed off — Alteration
Q00882382-I1
02/21/2025
Permit issued — Curb Cut
Q00691285-I1-CC
02/19/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
George Lau
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Lau
02/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
02/19/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
02/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/06/2025
Objection raised — Admin
02/06/2025
Objection resolved — Addressed
01/28/2025
Filed — New Building
Subsequently File Mechanical Scope of Work for 11-story residential building with affordable housing units in conjunction with NB-GC# Q00646536-I1
Q00646536-A1
01/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJLS GROUP CONSTRUCTION LL02/21/2025
DOB NOWSolarSigned-offACCORD POWER INC10/30/2024
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC09/06/2024
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC09/06/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/13/2024
DOB NOWGeneral ConstructionSigned-offJLS GROUP CONSTRUCTION LL07/31/2024
DOB NOWMechanical SystemsSigned-offJLS GROUP CONSTRUCTION LL07/23/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC06/26/2024
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL05/20/2024
DOB NOWConstruction FenceSigned-offJLS GROUP CONSTRUCTION LL04/30/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/16/2024
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL02/02/2024
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC09/12/2023
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC09/06/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC09/06/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC07/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING05/03/2023
DOB NOWConstruction FenceSigned-offDYNASTY CONTRACTING LLC04/12/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC03/22/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC03/22/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC03/22/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/13/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING02/09/2023
DOB NOWStructuralSigned-offJLS GROUP CONSTRUCTION LL02/07/2023
DOB NOWFoundationSigned-offJLS GROUP CONSTRUCTION LL02/07/2023
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL02/06/2023
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL11/23/2022
DOB NOWFoundationSigned-offJLS GROUP CONSTRUCTION LL06/13/2022
DOB NOWSupport of ExcavationSigned-offJLS GROUP CONSTRUCTION LL05/19/2022
DOB NOWSidewalk ShedSigned-offPRD GROUP INC05/04/2022
DOB NOWConstruction FenceSigned-offDYNASTY CONTRACTING LLC03/31/2022
BISMHISSUEDAARCO ENVIRONMENTAL SERVICES,12/12/2017
1 project · most recent 12/01/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/01/2025Signed-offJLS GROUP CONSTRUCTION LLHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
General Electric AZ65H09DABW5 9,700 BTU · Ptac ×150
AZ65H12DABW7 11,900 BTU · Ptac ×150
AKEQ10DCHK1 1 tons · Ptac ×3
Mitsubishi Electric MUZ-GL12NA 18,100 BTU · Heat Pump Outdoor ×3
MXZ-4C36NA3 43,000 BTU · Heat Pump Outdoor ×3
SUZ-KA24NAHZ 28,000 BTU · Heat Pump Outdoor ×3
Ventilation
Panasonic 0510VS1M2 50 CFM · Exhaust Fan ×100
FV-0510VS1 25 CFM · Exhaust Fan ×20
Canarm DDA24DK30300BM 8,500 CFM ×4
ALX105-UD-EC 150 CFM · Exhaust Fan ×2
Floaire FSIF18DD 4,200 CFM ×2
FSIF9DD 250 CFM ×2
Aaon RN-015-8-0-HB09-36B 15 tons · Rooftop Unit ×3
Atmosphere VTX600L 200 CFM ×2
Fantech FG-6M-EC 200 CFM · Exhaust Fan ×50
PRO-80 50 CFM · Exhaust Fan ×50
Greenheck SP-A50-909-VG 25 CFM · Exhaust Fan ×10
QEID-27 8,500 CFM · Exhaust Fan ×2
CUE-070-VG 150 CFM · Exhaust Fan ×1
SP-A510-VG 200 CFM · Exhaust Fan ×1
SQ-18-VG 4,200 CFM · Exhaust Fan ×1
SQ-97-VG 250 CFM · Exhaust Fan ×1
1 project · most recent 12/01/2025
Sprinkler System
FiledStatusContractorScope
12/01/2025Signed-offVIP FIRE SPRINKLER INCSprinkler System
1 project · most recent 12/01/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/01/2025Signed-offDPH PLUMBING & HTG CORPGas, Storm, Water/Sanitary
9 projects · most recent 01/09/2025
General Wiring
FiledStatusContractorScope
01/09/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
10/29/2024CompleteACCORD POWER ELECTRIC LLC—
09/23/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
07/14/2023CompleteTUXEDO ELEC'L CONTR'G INC—
04/12/2023CompleteNASH ELECTRIC SERVICES IN—
03/20/2023CompleteAL-LECTRIC ELECT'L CONTRG—
03/20/2023CompleteNASH ELECTRIC SERVICES IN—
12/09/2022CompleteAL-LECTRIC ELECT'L CONTRG1 meters, 1 new_meters
05/17/2022CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 12/01/2025
Concrete
FiledStatusContractorScope
12/01/2025Signed-offVIP FIRE SPRINKLER INCConcrete
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
03/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/18/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/08/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/06/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/19/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/24/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/17/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/30/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/30/2024Fail-Final CND-Occupancy InspectionFailView ↗
04/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
09/14/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/14/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
07/03/2025Air barrier - visual inspection—energy_progress
07/03/2025Insulation placement and R values—energy_progress
07/03/2025Fenestration and door U-factor and product ratings—energy_progress
07/03/2025Fenestration areas—energy_progress
07/03/2025Fenestration air leakage—energy_progress
03/18/2025MeteringGeorge Lauenergy_progress
03/18/2025HVAC-R and service water heating equipmentGeorge Lauenergy_progress
03/18/2025Shutoff dampersGeorge Lauenergy_progress
03/18/2025Fire-Resistant Penetrations and JointsGeorge Lauspecial
03/18/2025Mechanical SystemsGeorge Lauspecial
03/18/2025Energy Code Compliance InspectionsGeorge Lauprogress
03/18/2025FinalGeorge Lauprogress
03/18/2025HVAC-R and service water piping design and insulationGeorge Lauenergy_progress
03/18/2025Electrical motors and elevatorsGeorge Lauenergy_progress
03/18/2025HVAC-R and service water heating system controlsGeorge Lauenergy_progress
03/18/2025Duct leakage testing, insulation and designGeorge Lauenergy_progress
03/18/2025Maintenance informationGeorge Lauenergy_progress
03/12/2025HVAC-R and service water heating equipmentGeorge Lauenergy_progress
03/12/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPaul Raymondspecial
03/12/2025Fire-Resistant Penetrations and JointsGeorge Lauspecial
03/12/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationGeorge Lauspecial
03/12/2025Maintenance informationGeorge Lauenergy_progress
03/12/2025HVAC-R and service water piping design and insulationGeorge Lauenergy_progress
03/12/2025HVAC-R and service water heating system controlsGeorge Lauenergy_progress
03/12/2025Energy Code Compliance InspectionsGeorge Lauprogress
Latest 25 of 95.
▾Documents — 259 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
08/26/2026Q00671676-I1Request digital key ↗
08/26/2026Q00646536-I1Request digital key ↗
08/26/2026Q00646536-B1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
02/13/2025421592510Open ↗
02/13/2025440388849Open ↗
09/15/2022440707228Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/29/2024440707228Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/28/2025440707228Open ↗
▸BISWORK PERMIT APPLICATION1
12/15/2017440388849Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram5
08/26/2026Q00646536-A6Open ↗
08/26/2026Q00646536-A5Open ↗
08/26/2026Q00646536-A4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/26/2026Q00646536-A6Open ↗
08/26/2026Q00646536-A5Open ↗
08/26/2026Q00646536-A4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/26/2026Q00646536-I1Open ↗
08/13/2026Q00646536-A6Open ↗
08/13/2026Q00646536-B1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00646536-I1Open ↗
▸Seals & Professional Certifications91
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026Q00646536-P2Open ↗
09/23/2026Q00646536-P2Open ↗
09/23/2026Q00646536-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/26/2026Q00691285-I1Open ↗
08/26/2026Q00646536-S6Open ↗
08/26/2026Q00646536-A6Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026Q00646536-P2Open ↗
09/23/2026Q00646536-P2Open ↗
09/23/2026Q00646536-P2Open ↗
Showing 3 of 25 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/19/2022440707228Open ↗
03/31/2017440388849Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/19/2022440707228Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/16/2018421592510Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWStandpipe Alarms Drawings2
08/26/2026Q00646536-I1—
08/13/2026Q00882382-I1—
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/16/2018421592510Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist5
08/26/2026Q00646536-A6Open ↗
08/26/2026Q00646536-A5Open ↗
08/26/2026Q00646536-A4Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
09/23/2022440707228Open ↗
03/19/2022440707228Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/23/2022440707228Open ↗
▸BISSTREET TREE SIGNOFF1
04/23/2025440707228Open ↗
▸BISSTREET TREES SITE PLAN1
04/23/2025440707228Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00646536-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos43
▸DOB NOWOER: Notice to Proceed25
08/26/2026Q00646536-I1Open ↗
08/26/2026Q00646536-A6Open ↗
08/26/2026Q00646536-A5Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWOER: Notice of Satisfaction14
08/26/2026Q00646536-I1Open ↗
08/13/2026Q00882382-I1Open ↗
08/13/2026Q00882382-I1Open ↗
Showing 3 of 14 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
03/19/2022440707228Open ↗
05/01/2017440388849Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
04/23/2025440707228Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/31/2017440388849Open ↗
▸Energy Compliance7
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026Q00646536-S4Open ↗
08/13/2026Q00646536-S5Open ↗
08/13/2026Q00646536-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/27/2017440388849Open ↗
11/27/2017440388849Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/16/2018421592510Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00646536-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/27/2017440388849Open ↗
11/27/2017440388849Open ↗
11/27/2017440388849Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: FIELD INSPECTION1
04/25/2025440707228Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCURB CUT (CC) SIGNOFF1
04/23/2025440707228Open ↗
▸BISNEW CC APPROVAL1
09/23/2022440707228Open ↗
▸BISDPR APPROVAL FOR TREE REMOVAL1
09/23/2022440707228Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01125829-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/16/2018421592510Open ↗
03/31/2017440388849Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
04/25/2025440707228Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
12/05/2017440388849Open ↗
11/27/2017440388849Open ↗
10/04/2017440388849Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/19/2022440707228Open ↗
03/31/2017440388849Open ↗
▸BISEFILING COVER SHEET1
01/16/2018421592510Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/19/2022440707228Open ↗
▸Other Documents28
▸DOB NOWSite Survey: Initial5
08/26/2026Q00646536-A6Open ↗
08/26/2026Q00646536-A5Open ↗
08/26/2026Q00646536-A4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/26/2026Q00646536-A6Open ↗
08/26/2026Q00646536-A5Open ↗
08/26/2026Q00646536-A4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/26/2026Q00646536-A6Open ↗
08/26/2026Q00646536-A5Open ↗
08/26/2026Q00646536-A4Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/27/2017440388849Open ↗
11/27/2017440388849Open ↗
11/27/2017440388849Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION3
04/28/2025440707228Open ↗
04/25/2025440707228Open ↗
04/25/2025440707228Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/23/2022440707228Open ↗
▸BISTREE REMOVAL: SPEC. ZON. DIST./CPC APPR1
04/23/2025440707228Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
04/25/2025440707228Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
04/25/2025440707228Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00646536-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00646536-S1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00646536-I1Open ↗