| Owner | Filings | Most Recent |
|---|---|---|
| 39-26 Property | 95 | 07/08/2026 |
| Zhong Chuang Properties | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MY Architect | 6 | 12/01/2025 |
| HRM Engineering Services | 9 | 03/18/2025 |
| Synergic Design Architects | 1 | 10/23/2024 |
| FL&M Engineering Design & Inspection | 3 | 08/13/2024 |
| Ark Engineering Consultant | 2 | 06/01/2023 |
| YL Engineering | 1 | 04/13/2023 |
| Grand Millennium Consulting Engineering | 6 | 02/22/2023 |
| Ashraf | 1 | 05/03/2022 |
| Times Buildings Engineering Service | 1 | 03/30/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| Ark Engineering | 4 | 03/21/2026 |
| Rigid Structural Design | 2 | 03/21/2026 |
| BMB Building Consulting | 18 | 03/21/2026 |
| Xpdite Group LLC (104) | 5 | 03/21/2026 |
| MY Architect | 14 | 03/21/2026 |
| Geiger E A Group | 2 | 03/21/2026 |
| KD Designs | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JLS Group Construction | General Contractor | 31 | 07/08/2026 |
| Vip Fire Sprinkler | Fire Protection | 8 | 07/08/2026 |
| MC Superstructure | Scaffold | 7 | 07/08/2026 |
| Tri Borough Scaffolding | Scaffold | 6 | 03/21/2026 |
| Dynasty Contracting | Scaffold | 4 | 07/08/2026 |
| PRD Group | Scaffold | 3 | 03/21/2026 |
| JLS Group Construction | Scaffold | 3 | 03/21/2026 |
| DPH Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Accord Power | General Contractor | 2 | 03/21/2026 |
| Edwin F Deguzman | Electrical | 1 | 03/21/2026 |
| AL-Lectric Elect'l Contracting | Electrical | 1 | 03/22/2026 |
| Tuxedo Electrical Contracting | Electrical | 1 | 03/22/2026 |
| MY Architect | General Contractor | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Ark Engineering | 7261 | 18 | 03/18/2025 |
| Synergic Design | 8561 | 1 | 10/23/2024 |
| Regional Testing | 394 | 1 | 05/06/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | JLS Group Construction | 02/21/2025 |
| DOB NOW | Solar | Signed-off | Accord Power | 10/30/2024 |
| DOB NOW | Standpipe | Signed-off | Vip Fire Sprinkler | 09/06/2024 |
| DOB NOW | Sprinklers | Signed-off | Vip Fire Sprinkler | 09/06/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | MC Superstructure | 08/13/2024 |
| DOB NOW | General Construction | Signed-off | JLS Group Construction | 07/31/2024 |
| DOB NOW | Mechanical Systems | Signed-off | JLS Group Construction | 07/23/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | MC Superstructure | 06/26/2024 |
| DOB NOW | General Construction | Permit Issued | JLS Group Construction | 05/20/2024 |
| DOB NOW | Construction Fence | Signed-off | JLS Group Construction | 04/30/2024 |
| DOB NOW | Plumbing | Signed-off | DPH Plumbing & Heating | 02/16/2024 |
| DOB NOW | General Construction | Permit Issued | JLS Group Construction | 02/02/2024 |
| DOB NOW | Standpipe | Signed-off | Vip Fire Sprinkler | 09/12/2023 |
| DOB NOW | Sprinklers | Signed-off | Vip Fire Sprinkler | 09/06/2023 |
| DOB NOW | Standpipe | Signed-off | Vip Fire Sprinkler | 09/06/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | MC Superstructure | 07/12/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | MC Superstructure | 07/12/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Tri Borough Scaffolding | 05/03/2023 |
| DOB NOW | Construction Fence | Signed-off | Dynasty Contracting | 04/12/2023 |
| DOB NOW | Standpipe | Signed-off | Vip Fire Sprinkler | 03/22/2023 |
| DOB NOW | Standpipe | Signed-off | Vip Fire Sprinkler | 03/22/2023 |
| DOB NOW | Sprinklers | Signed-off | Vip Fire Sprinkler | 03/22/2023 |
| DOB NOW | Plumbing | Signed-off | DPH Plumbing & Heating | 02/13/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | Tri Borough Scaffolding | 02/09/2023 |
| DOB NOW | Structural | Signed-off | JLS Group Construction | 02/07/2023 |
| DOB NOW | Foundation | Signed-off | JLS Group Construction | 02/07/2023 |
| DOB NOW | General Construction | Permit Issued | JLS Group Construction | 02/06/2023 |
| DOB NOW | General Construction | Permit Issued | JLS Group Construction | 11/23/2022 |
| DOB NOW | Foundation | Signed-off | JLS Group Construction | 06/13/2022 |
| DOB NOW | Support of Excavation | Signed-off | JLS Group Construction | 05/19/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | PRD Group | 05/04/2022 |
| DOB NOW | Construction Fence | Signed-off | Dynasty Contracting | 03/31/2022 |
| BIS | MH | ISSUED | Aarco Environmental Services | 12/12/2017 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 12/01/2025 | Signed-off | JLS Group Construction | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool General Electric AZ65H09DABW5 9,700 BTU · Ptac ×150 AZ65H12DABW7 11,900 BTU · Ptac ×150 AKEQ10DCHK1 1 tons · Ptac ×3 Mitsubishi Electric MUZ-GL12NA 18,100 BTU · Heat Pump Outdoor ×3 MXZ-4C36NA3 43,000 BTU · Heat Pump Outdoor ×3 SUZ-KA24NAHZ 28,000 BTU · Heat Pump Outdoor ×3 Ventilation Aaon RN-015-8-0-HB09-36B 15 tons · Rooftop Unit ×3 Atmosphere VTX600L 200 CFM ×2 Greenheck SP-A50-909-VG 25 CFM · Exhaust Fan ×10 QEID-27 8,500 CFM · Exhaust Fan ×2 CUE-070-VG 150 CFM · Exhaust Fan ×1 SP-A510-VG 200 CFM · Exhaust Fan ×1 SQ-18-VG 4,200 CFM · Exhaust Fan ×1 SQ-97-VG 250 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/01/2025 | Signed-off | Vip Fire Sprinkler | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/01/2025 | Signed-off | DPH Plumbing & Heating | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/09/2025 | Complete | AL-Lectric Elect'l Contracting | General Wiring |
| 10/29/2024 | Complete | Accord Power Electric | — |
| 09/23/2024 | Complete | AL-Lectric Elect'l Contracting | General Wiring |
| 07/14/2023 | Complete | Tuxedo Electrical Contracting | — |
| 04/12/2023 | Complete | Nash Electric Services | — |
| 03/20/2023 | Complete | AL-Lectric Elect'l Contracting | — |
| 03/20/2023 | Complete | Nash Electric Services | — |
| 12/09/2022 | Complete | AL-Lectric Elect'l Contracting | 1 meters, 1 new_meters |
| 05/17/2022 | Complete | Nash Electric Services | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/01/2025 | Signed-off | Vip Fire Sprinkler | Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/20/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/18/2025 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 03/08/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/06/2025 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 02/19/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 01/28/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 12/24/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/24/2024 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 12/17/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/17/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/30/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 11/01/2023 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 09/14/2023 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 09/14/2023 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 03/07/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 03/07/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/03/2025 | Fenestration air leakage | — | energy_progress |
| 07/03/2025 | Insulation placement and R values | — | energy_progress |
| 07/03/2025 | Air barrier - visual inspection | — | energy_progress |
| 07/03/2025 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 07/03/2025 | Fenestration areas | — | energy_progress |
| 03/18/2025 | Mechanical Systems | George Lau | special |
| 03/18/2025 | Energy Code Compliance Inspections | George Lau | progress |
| 03/18/2025 | Maintenance information | George Lau | energy_progress |
| 03/18/2025 | Duct leakage testing, insulation and design | George Lau | energy_progress |
| 03/18/2025 | HVAC-R and service water heating system controls | George Lau | energy_progress |
| 03/18/2025 | Electrical motors and elevators | George Lau | energy_progress |
| 03/18/2025 | Shutoff dampers | George Lau | energy_progress |
| 03/18/2025 | HVAC-R and service water piping design and insulation | George Lau | energy_progress |
| 03/18/2025 | HVAC-R and service water heating equipment | George Lau | energy_progress |
| 03/18/2025 | Metering | George Lau | energy_progress |
| 03/18/2025 | Fire-Resistant Penetrations and Joints | George Lau | special |
| 03/18/2025 | Final | George Lau | progress |
| 03/12/2025 | HVAC-R and service water heating equipment | George Lau | energy_progress |
| 03/12/2025 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | Paul Raymond | special |
| 03/12/2025 | Fire-Resistant Penetrations and Joints | George Lau | special |
| 03/12/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | George Lau | special |
| 03/12/2025 | Maintenance information | George Lau | energy_progress |
| 03/12/2025 | HVAC-R and service water piping design and insulation | George Lau | energy_progress |
| 03/12/2025 | HVAC-R and service water heating system controls | George Lau | energy_progress |
| 03/12/2025 | Energy Code Compliance Inspections | George Lau | progress |